| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PTW-HW-001 | Hot Works Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FW-002 | Fire Watch Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-003 | General Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-WH-006 | Work at Height Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RF-007 | Roof Work Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LO-008 | Lifting Operations Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PE-009 | Permit to Enter | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EL-010 | Electrical Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-RG-012 | Permit Register | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AP-013 | Permit Application Form | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SU-015 | Permit Suspension Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PT-025 | Pressure Test Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-PT-025 | Pressure Test Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EN-027 | Permit to Energise | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-EN-027 | Permit to Energise | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
RAMS
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-RAMS-EL-001 | Electrical Containment Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-003 | Tape and Jointing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-005 | Internal Rendering | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-004 | Ductwork Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-008 | Refrigerant Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-001 | Excavation and Trenching | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-005 | Screeding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-001 | Steel Frame Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-005 | Staircase Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-004 | Edge Protection Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-002 | Curtain Walling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-005 | Raised Access Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-003 | Spray Application — Internal | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-004 | External Decoration at Height | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-001 | Window and Door Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-001 | Telehandler Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-002 | MEWP Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-003 | Crane Lift Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-003 | Tree Works Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-001 | External Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-001 | External Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-002 | Internal Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-002 | Internal Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-002 | Bored and CFA Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-002 | Bored and CFA Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-003 | Underpinning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-003 | Underpinning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-001 | Timber Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-001 | Timber Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-002 | Structural Concrete Repair | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-002 | Structural Concrete Repair | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-003 | Resin and Grout Injection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-003 | Resin and Grout Injection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-002 | Rope Access Working | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-002 | Rope Access Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-001 | Demountable Partition Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-001 | Demountable Partition Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-005 | Stump Grinding | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-004 | Optical Fibre Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-008 | Site Dumper Operations | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-008 | Site Dumper Operations | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-008 | Work Over or Near Water | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-GW-008 | Work Over or Near Water | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
New build housing — the complete set
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-001 | Excavation and Trenching | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-001 | Telehandler Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-002 | Bored and CFA Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-002 | Bored and CFA Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-004 | Edge Protection Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-001 | Timber Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-001 | Timber Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-003 | Tape and Jointing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
The complete library
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PTW-HW-001 | Hot Works Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FW-002 | Fire Watch Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-003 | General Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-WH-006 | Work at Height Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RF-007 | Roof Work Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LO-008 | Lifting Operations Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PE-009 | Permit to Enter | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EL-010 | Electrical Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-RG-012 | Permit Register | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AP-013 | Permit Application Form | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SU-015 | Permit Suspension Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-003 | Tape and Jointing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-005 | Internal Rendering | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-004 | Ductwork Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-008 | Refrigerant Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-001 | Excavation and Trenching | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-005 | Screeding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-001 | Steel Frame Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-005 | Staircase Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-004 | Edge Protection Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-002 | Curtain Walling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-005 | Raised Access Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-003 | Spray Application — Internal | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-004 | External Decoration at Height | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-001 | Window and Door Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-001 | Telehandler Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-002 | MEWP Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-003 | Crane Lift Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-003 | Tree Works Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-001 | External Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-001 | External Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-002 | Internal Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-002 | Internal Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-002 | Bored and CFA Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-002 | Bored and CFA Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-003 | Underpinning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-003 | Underpinning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-001 | Timber Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-001 | Timber Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-002 | Structural Concrete Repair | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-002 | Structural Concrete Repair | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-003 | Resin and Grout Injection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-003 | Resin and Grout Injection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-002 | Rope Access Working | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-002 | Rope Access Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-001 | Demountable Partition Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-001 | Demountable Partition Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-002 | Hold-Point Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-002 | Hold-Point Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-003 | Inspection Request | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-003 | Inspection Request | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-005 | Material and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-005 | Material and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-006 | Environmental Conditions Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-006 | Environmental Conditions Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-007 | Non-Conformance Report | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-007 | Non-Conformance Report | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-008 | Non-Conformance Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-008 | Non-Conformance Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-011 | Quality System Audit Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-011 | Quality System Audit Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-012 | Photo Evidence Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-012 | Photo Evidence Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SC-001 | Scaffold Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SC-001 | Scaffold Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EX-002 | Excavation Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EX-002 | Excavation Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LD-006 | Ladder and Stepladder Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LD-006 | Ladder and Stepladder Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FS-009 | Fire Safety Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-FS-009 | Fire Safety Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WS-010 | Weekly Site Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-WS-010 | Weekly Site Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TM-012 | Traffic Management Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TM-012 | Traffic Management Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EP-013 | Emergency Procedures Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EP-013 | Emergency Procedures Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-NS-015 | Noise Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-NS-015 | Noise Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AR-019 | Site Inspection Action Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-AR-019 | Site Inspection Action Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PT-025 | Pressure Test Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-PT-025 | Pressure Test Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EN-027 | Permit to Energise | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-EN-027 | Permit to Energise | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D0 | 2026-08-27 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D1 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-103 | Colour and Batch Schedule | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-103 | Colour and Batch Schedule | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-005 | Stump Grinding | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-004 | Optical Fibre Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IR-003 | Induction Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IR-003 | Induction Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TC-004 | Training and Competence Matrix | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TC-004 | Training and Competence Matrix | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SD-013 | Site Diary | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SD-013 | Site Diary | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IS-019 | Services Isolation Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IS-019 | Services Isolation Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-KA-020 | Key and Access Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-KA-020 | Key and Access Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-025 | Accident Book Entry | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-AB-025 | Accident Book Entry | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RD-028 | RIDDOR Decision Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RD-028 | RIDDOR Decision Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DR-033 | Drawing and Document Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DR-033 | Drawing and Document Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-HR-004 | Hot Works Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-HR-004 | Hot Works Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DB-002 | Temporary Works Design Brief | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DB-002 | Temporary Works Design Brief | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CA-003 | Temporary Works Category Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CA-003 | Temporary Works Category Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DC-004 | Design Check Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DC-004 | Design Check Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CC-006 | Temporary Works Change Control Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CC-006 | Temporary Works Change Control Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-TP-001 | Site Traffic Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-TP-001 | Site Traffic Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-SW-001 | Site Waste Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SW-001 | Site Waste Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-IR-007 | Environmental Incident Report | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-IR-007 | Environmental Incident Report | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-HS-001 | Health Surveillance Register and Programme | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HS-001 | Health Surveillance Register and Programme | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LW-007 | Lone Working Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-LW-007 | Lone Working Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-ES-027 | Excavation Support Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-ES-027 | Excavation Support Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CS-028 | Confined-Space Equipment Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-CS-028 | Confined-Space Equipment Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MH-009 | Manual Handling Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MH-009 | Manual Handling Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WH-010 | Work at Height Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WH-010 | Work at Height Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AS-013 | Asbestos Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AS-013 | Asbestos Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FA-015 | First Aid Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FA-015 | First Aid Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WF-017 | Welfare Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WF-017 | Welfare Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-PC-001 | Practical Completion Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-PC-001 | Practical Completion Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-BU-004 | Building User Guide | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-BU-004 | Building User Guide | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-TR-008 | Client Training and Demonstration Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-TR-008 | Client Training and Demonstration Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-MW-002 | MEWP Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-MW-002 | MEWP Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CS-003 | Confined Space Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CS-003 | Confined Space Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-RG-006 | POWRA Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RG-006 | POWRA Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-RG-001 | Asbestos Register — Site Copy | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-RG-001 | Asbestos Register — Site Copy | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-MP-002 | Asbestos Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-MP-002 | Asbestos Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FN-004 | Fire Action Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FN-004 | Fire Action Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PP-005 | PPE Requirements Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PP-005 | PPE Requirements Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PB-007 | Permits in Force Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PB-007 | Permits in Force Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WF-010 | Welfare Facilities Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WF-010 | Welfare Facilities Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-AR-003 | Approved Subcontractor Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-AR-003 | Approved Subcontractor Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-002 | Thermal Protection of Pours | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-002 | Thermal Protection of Pours | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-005 | Loading Out Demolition Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-005 | Loading Out Demolition Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-001 | Work Within Root Protection Areas | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-001 | Work Within Root Protection Areas | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-005 | Night Working and Lighting Towers | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-005 | Night Working and Lighting Towers | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-004 | Chemical Paint Stripping | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-004 | Chemical Paint Stripping | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-005 | Rope Access Painting and Coating | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-005 | Rope Access Painting and Coating | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-AP-001 | Interim Payment Application | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-AP-001 | Interim Payment Application | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-DN-002 | Payee's Notice in Default | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-DN-002 | Payee's Notice in Default | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PN-003 | Payment Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PN-003 | Payment Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PL-004 | Pay Less Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PL-004 | Pay Less Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PT-006 | Payment Dates Tracker | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PT-006 | Payment Dates Tracker | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-RR-008 | Retention Register and Release Request | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-RR-008 | Retention Register and Release Request | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-VR-001 | Subcontractor Verification Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-VR-001 | Subcontractor Verification Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-PD-002 | Payment and Deduction Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-PD-002 | Payment and Deduction Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VR-001 | Variation and Change Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VR-001 | Variation and Change Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VQ-002 | Variation Quotation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VQ-002 | Variation Quotation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DW-003 | Daywork Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DW-003 | Daywork Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DR-004 | Daywork Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DR-004 | Daywork Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-ND-005 | Notice of Delay to Progress | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-ND-005 | Notice of Delay to Progress | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-LE-006 | Loss and Expense Notification | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-LE-006 | Loss and Expense Notification | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-RQ-007 | RFI and Technical Query Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-RQ-007 | RFI and Technical Query Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-KD-008 | Contract Summary and Key Dates | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-KD-008 | Contract Summary and Key Dates | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-FA-009 | Final Account Reconciliation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-FA-009 | Final Account Reconciliation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CO-003 | Completion Notice and Client Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CO-003 | Completion Notice and Client Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CH-005 | Change of Dutyholder Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CH-005 | Change of Dutyholder Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DR-013 | Design Risk Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DR-013 | Design Risk Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DD-015 | Designer's Duties Checklist | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DD-015 | Designer's Duties Checklist | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CC-001 | HRB Change Control Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CC-001 | HRB Change Control Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MR-004 | HRB Occurrence Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MR-004 | HRB Occurrence Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-005 | HRB Construction Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-005 | HRB Construction Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-RW-001 | Right to Work Check Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-RW-001 | Right to Work Check Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-YP-005 | Young Person Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-YP-005 | Young Person Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MS-002 | Method Statement — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MS-002 | Method Statement — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-CO-004 | COSHH Assessment — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-CO-004 | COSHH Assessment — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-QP-001 | Quality Policy and Management System Scope | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-QP-001 | Quality Policy and Management System Scope | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EN-002 | Environmental Policy Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EN-002 | Environmental Policy Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-BS-007 | Building Safety Competence Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-BS-007 | Building Safety Competence Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-008 | Site Dumper Operations | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-008 | Site Dumper Operations | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-008 | Work Over or Near Water | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-GW-008 | Work Over or Near Water | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-WB-009 | Whistleblowing Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-WB-009 | Whistleblowing Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CY-013 | Cyber Security Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CY-013 | Cyber Security Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-RM-016 | Risk Management Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-RM-016 | Risk Management Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-MR-009 | Annual Management Review | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-MR-009 | Annual Management Review | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SA-022 | Site Security Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-SA-022 | Site Security Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | D0 | 2026-09-13 | Draft — not approved | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-QU-001 | Builder's Quotation | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-QU-001 | Builder's Quotation | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-CC-003 | Completion Certificate for the Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-CC-003 | Completion Certificate for the Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | D0 | 2026-09-13 | Draft — not approved | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-DC-001 | Building Contract — Domestic Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-DC-001 | Building Contract — Domestic Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SC-003 | Subcontract Agreement | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SC-003 | Subcontract Agreement | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-LR-001 | Homeowner's Legal Responsibilities Checklist | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-LR-001 | Homeowner's Legal Responsibilities Checklist | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BR-002 | Project Brief and Scope of Works | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BR-002 | Project Brief and Scope of Works | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BC-003 | Builder Checks Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BC-003 | Builder Checks Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-QC-004 | Quote Request and Comparison | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-QC-004 | Quote Request and Comparison | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CH-007 | Changes and Extra Costs Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CH-007 | Changes and Extra Costs Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-JD-008 | Job Diary for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-JD-008 | Job Diary for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-SN-009 | Snag List and Handover — Home Improvements | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-SN-009 | Snag List and Handover — Home Improvements | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-GR-010 | Guarantees and Certificates Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-GR-010 | Guarantees and Certificates Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PW-011 | Party Wall Notice Pack | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PW-011 | Party Wall Notice Pack | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BL-013 | Letters to Your Builder | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BL-013 | Letters to Your Builder | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-001 | Construction Phase Plan | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D2 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-PI-003 | Pre-Construction Information | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-HF-004 | Health and Safety File | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-NA-005 | Notification Assessment and Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-AP-006 | Duty-holder Appointments | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-IN-009 | Site Induction Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | D0 | 2026-08-31 | Draft — not approved | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | D1 | 2026-08-31 | Draft — not approved | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | D0 | 2026-08-31 | Draft — not approved | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | D1 | 2026-08-31 | Draft — not approved | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POL-001 | Health and Safety Policy | D0 | 2026-08-31 | Draft — not approved | |
| KD-POL-001 | Health and Safety Policy | D1 | 2026-08-31 | Draft — not approved | |
| KD-POL-001 | Health and Safety Policy | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Quality inspection
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-002 | Hold-Point Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-002 | Hold-Point Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-003 | Inspection Request | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-003 | Inspection Request | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-005 | Material and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-005 | Material and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-006 | Environmental Conditions Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-006 | Environmental Conditions Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-007 | Non-Conformance Report | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-007 | Non-Conformance Report | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-008 | Non-Conformance Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-008 | Non-Conformance Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-011 | Quality System Audit Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-011 | Quality System Audit Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-012 | Photo Evidence Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-012 | Photo Evidence Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D0 | 2026-08-27 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D1 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-103 | Colour and Batch Schedule | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-103 | Colour and Batch Schedule | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Site inspection records
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-INS-SC-001 | Scaffold Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SC-001 | Scaffold Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EX-002 | Excavation Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EX-002 | Excavation Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LD-006 | Ladder and Stepladder Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LD-006 | Ladder and Stepladder Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FS-009 | Fire Safety Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-FS-009 | Fire Safety Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WS-010 | Weekly Site Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-WS-010 | Weekly Site Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TM-012 | Traffic Management Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TM-012 | Traffic Management Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EP-013 | Emergency Procedures Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EP-013 | Emergency Procedures Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-NS-015 | Noise Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-NS-015 | Noise Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AR-019 | Site Inspection Action Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-AR-019 | Site Inspection Action Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-ES-027 | Excavation Support Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-ES-027 | Excavation Support Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CS-028 | Confined-Space Equipment Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-CS-028 | Confined-Space Equipment Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
COSHH assessments
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Site forms
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IR-003 | Induction Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IR-003 | Induction Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TC-004 | Training and Competence Matrix | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TC-004 | Training and Competence Matrix | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SD-013 | Site Diary | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SD-013 | Site Diary | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IS-019 | Services Isolation Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IS-019 | Services Isolation Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-KA-020 | Key and Access Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-KA-020 | Key and Access Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-025 | Accident Book Entry | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-AB-025 | Accident Book Entry | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RD-028 | RIDDOR Decision Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RD-028 | RIDDOR Decision Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DR-033 | Drawing and Document Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DR-033 | Drawing and Document Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | D0 | 2026-09-13 | Draft — not approved | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Safe systems of work
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Fire safety on site
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-HR-004 | Hot Works Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-HR-004 | Hot Works Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Temporary works
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DB-002 | Temporary Works Design Brief | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DB-002 | Temporary Works Design Brief | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CA-003 | Temporary Works Category Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CA-003 | Temporary Works Category Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DC-004 | Design Check Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DC-004 | Design Check Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CC-006 | Temporary Works Change Control Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CC-006 | Temporary Works Change Control Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Lifting operations
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Traffic management and the public
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-TM-TP-001 | Site Traffic Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-TP-001 | Site Traffic Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Environmental management
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-ENV-SW-001 | Site Waste Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SW-001 | Site Waste Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-IR-007 | Environmental Incident Report | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-IR-007 | Environmental Incident Report | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Occupational health
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-OH-HS-001 | Health Surveillance Register and Programme | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HS-001 | Health Surveillance Register and Programme | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LW-007 | Lone Working Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-LW-007 | Lone Working Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Health and safety arrangements
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MH-009 | Manual Handling Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MH-009 | Manual Handling Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WH-010 | Work at Height Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WH-010 | Work at Height Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AS-013 | Asbestos Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AS-013 | Asbestos Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FA-015 | First Aid Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FA-015 | First Aid Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WF-017 | Welfare Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WF-017 | Welfare Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SA-022 | Site Security Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-SA-022 | Site Security Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Inspection and test plans
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Handover and completion
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-HO-PC-001 | Practical Completion Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-PC-001 | Practical Completion Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-BU-004 | Building User Guide | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-BU-004 | Building User Guide | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-TR-008 | Client Training and Demonstration Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-TR-008 | Client Training and Demonstration Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Rescue plans
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-MW-002 | MEWP Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-MW-002 | MEWP Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CS-003 | Confined Space Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CS-003 | Confined Space Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Point-of-work risk assessment
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-RG-006 | POWRA Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RG-006 | POWRA Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Asbestos management
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-ASB-RG-001 | Asbestos Register — Site Copy | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-RG-001 | Asbestos Register — Site Copy | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-MP-002 | Asbestos Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-MP-002 | Asbestos Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Site notices and boards
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FN-004 | Fire Action Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FN-004 | Fire Action Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PP-005 | PPE Requirements Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PP-005 | PPE Requirements Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PB-007 | Permits in Force Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PB-007 | Permits in Force Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WF-010 | Welfare Facilities Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WF-010 | Welfare Facilities Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Plant daily checks
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Healthcare estates
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Subcontractor management
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-AR-003 | Approved Subcontractor Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-AR-003 | Approved Subcontractor Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Topic RAMS
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-002 | Thermal Protection of Pours | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-002 | Thermal Protection of Pours | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-005 | Loading Out Demolition Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-005 | Loading Out Demolition Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-001 | Work Within Root Protection Areas | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-001 | Work Within Root Protection Areas | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-005 | Night Working and Lighting Towers | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-005 | Night Working and Lighting Towers | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-004 | Chemical Paint Stripping | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-004 | Chemical Paint Stripping | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-005 | Rope Access Painting and Coating | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-005 | Rope Access Painting and Coating | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Payment notices
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PAY-AP-001 | Interim Payment Application | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-AP-001 | Interim Payment Application | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-DN-002 | Payee's Notice in Default | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-DN-002 | Payee's Notice in Default | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PN-003 | Payment Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PN-003 | Payment Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PL-004 | Pay Less Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PL-004 | Pay Less Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PT-006 | Payment Dates Tracker | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PT-006 | Payment Dates Tracker | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-RR-008 | Retention Register and Release Request | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-RR-008 | Retention Register and Release Request | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
CIS records
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-CIS-VR-001 | Subcontractor Verification Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-VR-001 | Subcontractor Verification Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-PD-002 | Payment and Deduction Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-PD-002 | Payment and Deduction Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Contract administration
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-CA-VR-001 | Variation and Change Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VR-001 | Variation and Change Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VQ-002 | Variation Quotation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VQ-002 | Variation Quotation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DW-003 | Daywork Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DW-003 | Daywork Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DR-004 | Daywork Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DR-004 | Daywork Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-ND-005 | Notice of Delay to Progress | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-ND-005 | Notice of Delay to Progress | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-LE-006 | Loss and Expense Notification | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-LE-006 | Loss and Expense Notification | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-RQ-007 | RFI and Technical Query Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-RQ-007 | RFI and Technical Query Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-KD-008 | Contract Summary and Key Dates | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-KD-008 | Contract Summary and Key Dates | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-FA-009 | Final Account Reconciliation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-FA-009 | Final Account Reconciliation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Building Regulations dutyholders
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CO-003 | Completion Notice and Client Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CO-003 | Completion Notice and Client Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CH-005 | Change of Dutyholder Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CH-005 | Change of Dutyholder Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | D0 | 2026-09-13 | Draft — not approved | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Higher-risk buildings
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-BSA-CC-001 | HRB Change Control Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CC-001 | HRB Change Control Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MR-004 | HRB Occurrence Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MR-004 | HRB Occurrence Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-005 | HRB Construction Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-005 | HRB Construction Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Employer records
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-HR-RW-001 | Right to Work Check Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-RW-001 | Right to Work Check Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-YP-005 | Young Person Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-YP-005 | Young Person Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Blank forms
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MS-002 | Method Statement — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MS-002 | Method Statement — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-CO-004 | COSHH Assessment — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-CO-004 | COSHH Assessment — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Company policies
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PQ-QP-001 | Quality Policy and Management System Scope | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-QP-001 | Quality Policy and Management System Scope | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EN-002 | Environmental Policy Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EN-002 | Environmental Policy Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-BS-007 | Building Safety Competence Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-BS-007 | Building Safety Competence Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-WB-009 | Whistleblowing Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-WB-009 | Whistleblowing Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CY-013 | Cyber Security Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CY-013 | Cyber Security Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-RM-016 | Risk Management Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-RM-016 | Risk Management Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Health and safety audits
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
CAS evidence records
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-MR-009 | Annual Management Review | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-MR-009 | Annual Management Review | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Trade admin
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-TA-QU-001 | Builder's Quotation | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-QU-001 | Builder's Quotation | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-CC-003 | Completion Certificate for the Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-CC-003 | Completion Certificate for the Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VQ-002 | Variation Quotation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VQ-002 | Variation Quotation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DW-003 | Daywork Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DW-003 | Daywork Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PL-004 | Pay Less Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PL-004 | Pay Less Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Building contracts
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-AGR-DC-001 | Building Contract — Domestic Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-DC-001 | Building Contract — Domestic Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SC-003 | Subcontract Agreement | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SC-003 | Subcontract Agreement | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Homeowner toolkit
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-HM-BR-002 | Project Brief and Scope of Works | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BR-002 | Project Brief and Scope of Works | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-QC-004 | Quote Request and Comparison | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-QC-004 | Quote Request and Comparison | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CH-007 | Changes and Extra Costs Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CH-007 | Changes and Extra Costs Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-JD-008 | Job Diary for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-JD-008 | Job Diary for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-GR-010 | Guarantees and Certificates Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-GR-010 | Guarantees and Certificates Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PW-011 | Party Wall Notice Pack | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PW-011 | Party Wall Notice Pack | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BL-013 | Letters to Your Builder | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BL-013 | Letters to Your Builder | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Consultant licence — twelve months, multiple clients
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-PTW-HW-001 | Hot Works Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-HW-001 | Hot Works Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FW-002 | Fire Watch Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-FW-002 | Fire Watch Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-003 | General Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-GP-003 | General Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-CS-004 | Confined Space Entry Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EX-005 | Excavation & Permit to Dig | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-WH-006 | Work at Height Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-WH-006 | Work at Height Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RF-007 | Roof Work Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-RF-007 | Roof Work Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LO-008 | Lifting Operations Permit | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-LO-008 | Lifting Operations Permit | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PE-009 | Permit to Enter | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-PE-009 | Permit to Enter | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EL-010 | Electrical Permit to Work | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EL-010 | Electrical Permit to Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-PTW-EI-011 | Electrical Isolation Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-RG-012 | Permit Register | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-RG-012 | Permit Register | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AP-013 | Permit Application Form | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AP-013 | Permit Application Form | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-XP-014 | Cross-Permit Conflicting Works Check | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SU-015 | Permit Suspension Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SU-015 | Permit Suspension Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-HB-016 | Permit Hand-Back Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-GT-017 | Gas Test & Atmospheric Monitoring Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SH-018 | Permit Shift Handover Record | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AA-019 | Authorised Person Appointment Certificate | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-SM-020 | Authorisation Scope Matrix | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D0 | 2026-08-07 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | D1 | 2026-08-10 | Draft — not approved | |
| KD-SYS-AU-021 | Permit System Audit Checklist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-001 | Electrical Containment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-002 | Electrical First-Fix Wiring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-003 | Electrical Second Fix and Accessories | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-004 | Distribution Boards and Switchgear — Dead Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-005 | Electrical Testing, Inspection and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-006 | Data and Low-Voltage Systems Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-007 | Fire Alarm and Emergency Lighting Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-008 | Temporary Site Electrics | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-001 | Metal Stud Partitions and Wall Linings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-002 | Suspended Ceilings — MF and Grid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-003 | Tape and Jointing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-003 | Tape and Jointing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-004 | Solid Plastering and Skimming | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DL-005 | Internal Rendering | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DL-005 | Internal Rendering | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-001 | First-Fix Carpentry | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-002 | Second-Fix Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-003 | Fire Door Installation and Remediation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-004 | Kitchen and Fitted-Furniture Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-005 | Timber Floor Laying and Sanding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-001 | Soft Strip of Internal Finishes and Fittings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-002 | Structural Demolition — Machine | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-003 | Hand Demolition and Hard Strip | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-004 | Concrete Breaking, Bursting and Crushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-005 | Cutting and Removal of Structural Openings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-006 | Temporary Works Interface During Demolition | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-DM-007 | Asbestos Interface — Stop-Work and Discovery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-001 | Pipework Installation — Heating and Domestic | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-002 | Soldered and Brazed Pipework | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-003 | Sanitaryware and Fixtures Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-004 | Ductwork Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-004 | Ductwork Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-005 | Plant and Equipment Installation — Plant Rooms | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-006 | Pressure Testing and Flushing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-007 | Gas Pipework Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-008 | Refrigerant Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-008 | Refrigerant Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ME-009 | Mechanical Commissioning and Balancing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-001 | Excavation and Trenching | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-001 | Excavation and Trenching | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-002 | Foundations and Pile Caps | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-003 | Drainage Installation and Connections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-004 | Service Trenches and Ducting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-005 | Compaction, Hardcore and Sub-Bases | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-006 | Kerbing, Paving and Slabbing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GW-007 | Reduced-Dig and Contaminated Ground | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-001 | In-Situ Concrete Pours | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-002 | Formwork Erection and Striking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-003 | Reinforcement Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-004 | Power Floating and Surface Finishing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-005 | Screeding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CF-005 | Screeding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-001 | Blockwork and Brickwork — New Build | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-002 | Alterations and Toothing into Existing Structures | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-003 | Repointing and Brick Repairs | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-004 | Stone Masonry Fixing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-BM-005 | Lintel and Padstone Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-001 | Steel Frame Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-001 | Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-002 | Secondary Steelwork and Infill Members | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-003 | On-Site Welding and Hot Cutting of Steel | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-004 | Balustrades, Handrails and Architectural Metalwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ST-005 | Staircase Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-ST-005 | Staircase Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-001 | Tube and Fitting Scaffold — Erection, Alteration, Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-002 | System Scaffold — Erection and Dismantle | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-003 | Mobile Tower Assembly and Use | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-004 | Edge Protection Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-004 | Edge Protection Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-005 | Loading Bays and Gantries | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SC-006 | Temporary Roof Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-001 | Flat Roofing — Built-Up Felt and Torch-On | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-002 | Flat Roofing — Single-Ply and Cold-Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-003 | Pitched Roofing — Tiling and Slating | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-004 | Metal Profile and Standing Seam Roofing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-005 | Roof Repairs and Inspections | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-006 | Rooflight Replacement and Fragile-Surface Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-RO-007 | Gutters, Fascias and Rainwater Goods | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-001 | Rainscreen and Panel Cladding Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-002 | Curtain Walling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-002 | Curtain Walling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-003 | Render and External Wall Insulation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-004 | Facade Cleaning and Spray-Applied Coatings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-CL-005 | Remedial Cladding Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-001 | Sheet Vinyl and Safety Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-002 | Carpet and Carpet Tiles | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-003 | Resin and Self-Levelling Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-004 | Wall and Floor Tiling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FL-005 | Raised Access Floors | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FL-005 | Raised Access Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-001 | Internal Decoration — New Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-002 | Redecoration of Existing Surfaces | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-003 | Spray Application — Internal | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-003 | Spray Application — Internal | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-004 | External Decoration at Height | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-004 | External Decoration at Height | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PD-005 | Intumescent Coating Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-001 | Window and Door Replacement | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-001 | Window and Door Replacement | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-002 | Structural and Overhead Glazing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-003 | Internal Glazed Partitions | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-004 | Film Application and Manifestations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-GL-005 | Emergency Glazing and Boarding | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-001 | Fire-Stopping and Penetration Sealing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-002 | Fire Barrier Installation — Cavities and Voids | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-003 | Fire Door Remediation — Specialist | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-004 | Sprinkler and Suppression Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-FP-005 | Dry and Wet Riser Work | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-001 | Telehandler Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-001 | Telehandler Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-002 | MEWP Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-002 | MEWP Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-003 | Crane Lift Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-003 | Crane Lift Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-004 | Plant Delivery, Loading and Unloading | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-PL-005 | Small Plant and Power Tools | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-001 | Fencing and Hoarding Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-002 | Soft Landscaping and Planting | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-003 | Tree Works Interface | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-003 | Tree Works Interface | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-004 | Car Park Surfacing and Line Marking | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-EW-005 | Street Furniture and Signage Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-001 | Builders' Clean and Sparkle Clean | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-002 | Waste Management and Skip Exchanges | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-003 | Materials Distribution and Hoist Operations | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-004 | Traffic Marshalling and Vehicle Movements | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D0 | 2026-08-09 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | D1 | 2026-08-10 | Draft — not approved | |
| KD-RAMS-SL-005 | Winter Working and Adverse Weather | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-001 | External Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-001 | External Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-002 | Internal Wall Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-002 | Internal Wall Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-003 | Loft and Roof Void Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-004 | Cold and Warm Roof Insulation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-IN-005 | Thermal Insulation to Pipework and Ductwork | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-001 | Driven and Preformed Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-002 | Bored and CFA Piling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-002 | Bored and CFA Piling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-003 | Underpinning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-003 | Underpinning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-004 | Retaining Structures and Ground Anchors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PS-005 | Dewatering and Groundwater Control | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-001 | Timber Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-001 | Timber Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-002 | Light Steel Frame Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-003 | Volumetric and Modular Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-MC-004 | Structural Insulated Panels and Cassettes | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-001 | Passenger and Goods Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-002 | Platform and Home Lift Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LV-003 | Construction Hoist Erection and Dismantling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-001 | Industrial Door and Shutter Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-002 | Automatic Door Installation and Commissioning | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DS-003 | Blind, Louvre and Solar Shading Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-001 | Kitchen and Bathroom Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-002 | Worktop Templating and Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-003 | Commercial Kitchen Equipment Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-FF-004 | Storage, Shelving and Racking Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-001 | Access and Raised Floor Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-002 | Acoustic Floor and Isolation Systems | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-AF-003 | Screeding — Sand Cement and Liquid | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-001 | Concrete Cutting and Drilling | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-002 | Structural Concrete Repair | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-002 | Structural Concrete Repair | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CR-003 | Resin and Grout Injection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CR-003 | Resin and Grout Injection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-001 | Damp Proof Course Installation and Remedial | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-DP-002 | Timber Treatment and Wood Preservation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-001 | Suspended Access — Cradle and BMU | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-002 | Rope Access Working | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-002 | Rope Access Working | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-HA-003 | Steeplejack and Chimney Works | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-001 | Lightning Protection Installation and Testing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-002 | Sign Installation — Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-LP-003 | Sign Installation — Non-Illuminated | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-001 | External Rendering — Hand Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-002 | External Rendering — Machine Applied | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-003 | Resin and Specialist Coatings to Floors | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-001 | Demountable Partition Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-001 | Demountable Partition Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-002 | Operable and Moveable Wall Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PT-003 | Glass Partition and Internal Screen Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CJ-006 | Trussed Rafter and Roof Structure Erection | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-CF-006 | Beam and Block and Precast Concrete Flooring | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-010 | Mechanical Ventilation with Heat Recovery — Dwellings | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-011 | Underfloor Heating Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-ME-012 | Air Source Heat Pump Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-009 | EV Charge Point Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D1 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D2 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | D3 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-EL-010 | Solar PV and Roof-Integrated Panels | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-GL-006 | New Build Window and External Door Installation | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-PD-006 | Solvent-Based Finishes to Joinery | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-SL-006 | Plot Distribution by Telehandler — Housing | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | D0 | 2026-08-11 | Draft — not approved | |
| KD-RAMS-RN-004 | Mastic and Sealant Application | A0 | 2026-08-27 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-001 | Inspection and Test Plan — Package Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-002 | Hold-Point Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-002 | Hold-Point Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-003 | Inspection Request | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-003 | Inspection Request | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-004 | Benchmark and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-005 | Material and Sample Approval Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-005 | Material and Sample Approval Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-006 | Environmental Conditions Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-006 | Environmental Conditions Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-007 | Non-Conformance Report | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-007 | Non-Conformance Report | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-008 | Non-Conformance Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-008 | Non-Conformance Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-009 | Handover of Work Area — Trade to Trade | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-010 | Subcontractor Quality Self-Certification | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-011 | Quality System Audit Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-011 | Quality System Audit Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SYS-012 | Photo Evidence Log | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-SYS-012 | Photo Evidence Log | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SC-001 | Scaffold Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SC-001 | Scaffold Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EX-002 | Excavation Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EX-002 | Excavation Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LE-003 | Lifting Equipment and Accessories Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PL-004 | Plant Pre-Use Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HR-005 | Harness and Lanyard Inspection Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LD-006 | Ladder and Stepladder Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-LD-006 | Ladder and Stepladder Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TW-007 | Mobile Tower Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TE-008 | Temporary Electrics Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FS-009 | Fire Safety Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-FS-009 | Fire Safety Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WS-010 | Weekly Site Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-WS-010 | Weekly Site Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-SU-011 | Site Set-Up and Welfare Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TM-012 | Traffic Management Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-TM-012 | Traffic Management Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EP-013 | Emergency Procedures Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-EP-013 | Emergency Procedures Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-HV-014 | Hand-Arm Vibration Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-NS-015 | Noise Exposure Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-NS-015 | Noise Exposure Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-MH-016 | Manual Handling Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-CO-017 | COSHH Register and Assessment Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-PP-018 | Protecting the Public Inspection Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AR-019 | Site Inspection Action Register | D0 | 2026-08-28 | Draft — not approved | |
| KD-INS-AR-019 | Site Inspection Action Register | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-TL-022 | Permit to Load and Strike — Temporary Works | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-FI-023 | Fire Alarm and Detection Isolation Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SI-024 | Sprinkler and Suppression Impairment Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-PT-025 | Pressure Test Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-PT-025 | Pressure Test Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-GP-026 | Gas Purge and Commissioning Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-EN-027 | Permit to Energise | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-EN-027 | Permit to Energise | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-SC-028 | Permit to Cut or Core Structure | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-MI-029 | Mechanical Isolation and Lock-Off Certificate | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-RA-030 | Controlled Area Permit — Ionising Radiation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OH-031 | Work Near Overhead Power Lines Permit | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-LW-032 | Live Electrical Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | D0 | 2026-08-28 | Draft — not approved | |
| KD-PTW-OO-033 | Out-of-Hours and Lone Working Authorisation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-001 | Propping and Needling for Structural Openings | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-002 | Façade Retention and Structural Propping Schemes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-TW-003 | Back-Propping and Formwork Support — Suspended Slabs | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-001 | Below-Ground Waterproofing — Sheet and Liquid Membranes | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-002 | Internal Tanking and Cavity Drain Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WP-003 | Podium, Balcony and Wet-Room Waterproofing | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-001 | Pre-Commission Flushing and Chlorination of Water Systems | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-WH-002 | Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-001 | Gas Pipework Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-002 | Commercial Gas — Strength and Tightness Testing and Purging | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-GS-003 | Gas Appliance Installation and Commissioning | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-001 | Medical Gas Pipeline Installation and Alteration | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-MG-002 | Medical Gas Works in Occupied Clinical Areas — Interface and Isolation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-001 | Lead-Lined Board and Lead Sheet Shielding Installation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-RS-002 | Works to Existing Shielded Rooms — Openings, Services and Reinstatement | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-001 | Lead Paint Survey and Sampling | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-LD-002 | Lead Paint Removal and Safe Preparation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-001 | Removal of Asbestos Cement Products | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-002 | Removal of Textured Coatings and Floor Tiles | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | D0 | 2026-08-28 | Draft — not approved | |
| KD-RAMS-AS-003 | Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D0 | 2026-08-27 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | D1 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-001 | Internal Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-002 | Redecoration of Existing Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-004 | Spray Application Internal — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-008 | New Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-009 | Redecoration of Joinery and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-010 | Fire Doors and Frames Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-014 | Radiators and Internal Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-015 | Floor Paints and Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-017 | Intumescent Coatings to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-020 | Masonry Paint to External Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-025 | External Joinery Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-027 | External Ferrous Metalwork Painting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | D0 | 2026-08-28 | Draft — not approved | |
| KD-QA-PD-100 | Decoration Package — ITP Cover Sheet | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-003 | Textured and Acoustic Ceilings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-005 | Wallcoverings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-006 | Hygienic Wall Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-007 | Dry-Lined and Jointed Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-011 | Clear Finishes to Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-012 | Staircases, Handrails and Balustrades Decoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-013 | Fitted Furniture and Panelling Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-016 | Internal Line Marking and Floor Signage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-018 | Fire-Retardant Coatings to Timber and Boards — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-019 | Performance Coatings — Anti-Graffiti and Anti-Microbial — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-021 | Redecoration of External Render and Masonry — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-022 | External Spray Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-023 | Breathable Coatings to Traditional and Heritage Substrates — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-024 | Anti-Carbonation Coatings to Concrete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-026 | Timber Cladding and Decking Finishes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-028 | Galvanised, Aluminium and uPVC Surfaces — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-029 | Structural Steel Protective Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-032 | Playground and Sports Surface Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-033 | Lead Paint — Survey, Removal and Clearance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-034 | Asbestos-Suspect Textured Coatings — Check and Stop Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-035 | Damp, Salts and Biological Growth — Diagnosis Before Coating | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PD-103 | Colour and Batch Schedule | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PD-103 | Colour and Batch Schedule | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-001 | Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-002 | Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-003 | Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-004 | Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FP-005 | Fire Door Surveys and Remediation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-001 | Damp and Timber — Diagnosis and Specification of Treatment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-002 | Damp-Proofing and Treatment Application — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DP-003 | Timber Treatment and Guarantee — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-001 | Structural Approval and Scanning Before Cutting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-002 | Concrete Repair — Break-Out, Reinforcement, Mortar and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CR-003 | Resin Anchors and Post-Installed Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-001 | Scaffold Handover and Weekly Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-002 | Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-003 | Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SA-004 | Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BS-001 | Balustrades and Glass Balustrades — Fixings, Heights and Load Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-001 | Asbestos Enclosure and Smoke Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-002 | Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-AR-003 | Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-001 | Air-Tightness Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-002 | Sound Test Readiness and Result — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-003 | Thermal Imaging Survey — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-004 | Snagging and De-Snagging — Room by Room — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-005 | Pre-Handover Inspection — Client Walk — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-006 | Handover Evidence Checklist — Certificates, Tests, O&M and Golden Thread — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-007 | Pest Control and Final Clean at Handover — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CO-008 | Defects-Period Inspection — Record | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-001 | Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-002 | Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-003 | Insulation, Vapour Seal and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-004 | Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-005 | Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-006 | Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-007 | Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-008 | Sanitaryware and Second Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-009 | Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-010 | Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-011 | Commissioning and Balancing — Witness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ME-012 | Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-001 | Containment — Trays, Trunking, Conduit, Supports and Fire-Stopping — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-002 | Cable Installation and Identification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-003 | Distribution Boards and Switchgear — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-004 | Dead Testing and Live Testing (BS 7671) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-005 | Lighting — Levels and Emergency Lighting Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-006 | Fire Alarm — Cause-and-Effect, Loop Tests and Commissioning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-007 | Data, AV, Security, Access Control and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-008 | EV Charging — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-009 | Solar PV and Renewables — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EL-010 | Lightning Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-001 | Sprinklers — Hangers, Pressure Test and Flow Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-002 | Dry and Wet Risers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-003 | Smoke Vents, AOVs and Fire Curtains — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FS-004 | Fire Suppression — Gas and Kitchen Systems — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-001 | BMS Point-to-Point and Functional Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BC-002 | BMS Integration and Client Demonstration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-001 | Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-002 | Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-003 | Clean Rooms and Pressure Regimes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MG-004 | Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-001 | Lift Shaft and Pit Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-002 | Guide Alignment and Car Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-003 | Lift Safety Tests and Handover Certification — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-LV-004 | Hoists and Platform Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-001 | Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-002 | Witness Test Record — Generic — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CX-003 | Integrated Systems Test — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-001 | Metal Framing and Deflection Heads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-002 | Services in the Wall and Pattresses — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-003 | Insulation and Acoustic Infill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-004 | Boarding — Layers and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-005 | Fire-Stopping at Heads and Services — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-006 | Taping, Jointing and Finish Level — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-007 | Skim and Float — Flatness — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DL-008 | Dry Lining on Dabs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-001 | Demountable and Glazed Partitions — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PT-002 | Fire and Acoustic Wall Completion — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-001 | Ceiling Void Close-Out — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-002 | Ceiling Grid — Level and Hangers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-003 | Ceiling Tiles and Access Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CE-004 | Raised Access Floor — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-001 | Screed — Substrate, DPM, UFH, Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-002 | Screed Moisture and Cure — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SC-003 | Levelling Compounds and Preparation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-001 | Floor Substrate Acceptance — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-002 | Wall and Floor Tiling — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-003 | Vinyl and Safety Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-004 | Carpet and Carpet Tiles — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-005 | Timber and Engineered Flooring — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-006 | Resin, Terrazzo and Specialist Floors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FL-007 | Entrance Matting and Thresholds — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-001 | Doors, Frames and Ironmongery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-002 | Fire Doors — Installation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-003 | Skirtings, Architraves and Trims — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-004 | Timber Staircases and Balustrades — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-005 | Kitchens and Worktops — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-001 | Roller Shutters and Industrial Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-002 | Automatic Doors — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DS-003 | Steel and Security Doorsets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-001 | Fitted Furniture and Joinery Units — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-002 | IPS Panels, Cubicles and Lockers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-003 | Wall Protection and Handrails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-004 | Blinds, Curtains and Tracks — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-005 | Signage and Wayfinding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-006 | Racking, Mezzanines and Storage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-FF-007 | Loose Furniture and Equipment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-001 | Movement and Perimeter Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-002 | Wet-Area and Sanitary Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MS-003 | Fire-Rated Joints and Linear Gaps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-001 | Thermal Insulation — Continuity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-002 | Air Barrier — Laps and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-IN-003 | Acoustic Works — Floors and Seals — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-001 | Pre-Strip Survey and Services Isolation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-002 | Structural Protection and Propping in Place — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-003 | Salvage, Retained Items and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-DM-004 | Strip-Out Complete — Area Handover — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-001 | Temporary Works Erected to Design — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-002 | Temporary Works In-Use Inspection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-TW-003 | Permit to Strike or Dismantle — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-001 | Setting Out and Levels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-002 | Excavation and Formation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-003 | Backfill and Compaction — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-004 | Foundations — Trench and Pad — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-005 | Ground-Floor Slab and DPM — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-006 | Below-Ground Drainage — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-007 | Below-Ground Services and Ducts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GW-008 | Drainage Testing and CCTV — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-001 | Pile Setting Out and Working Platform — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-002 | Pile Installation Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-003 | Pile Cut-Off and Integrity Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-004 | Pile Caps and Ground Beams — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-PS-005 | Underpinning — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-001 | Substrate Acceptance for Membranes — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-002 | Membrane Laps, Details and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-WP-003 | Integrity Test and Protection Before Backfill — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-001 | Formwork — Line, Level, Ties and Release Agent — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-002 | Reinforcement — Cover, Laps, Spacers and Cast-Ins — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-003 | Pour Card — Mix, Slump, Cubes, Placing and Vibration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-004 | Curing and Protection — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-005 | Striking and Finished Surface — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CF-006 | Post-Tensioning and Stressing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SF-001 | Reinforcement to Bending Schedule — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-001 | Fabrication Release and Delivery — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-002 | Erection — Alignment, Plumb and Bolting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-003 | Site Welding — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-004 | Holding-Down Bolts and Base Grouting — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-005 | Metal Decking and Shear Studs — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-ST-006 | Secondary Steel — Lintels, Stairs and Mezzanines — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-001 | Setting Out, DPC and First Lifts — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-002 | Cavity Wall — Ties, Insulation, Trays, Weeps and Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-003 | Bond, Plumb, Line, Joints and Movement Joints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-004 | Lintels, Bearings and Restraints — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-005 | Internal Blockwork — Fire and Acoustic Walls — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-006 | Stone Masonry, Cast Stone and Restoration — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-BM-007 | Brick Slips and Brick-Faced Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-001 | Precast Delivery, Bearings and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-002 | Timber Frame Erection — Sole Plates, Holding-Down and Breather Membrane — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-003 | Volumetric Modules and Pod Placement — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-MC-004 | SIPs and CLT Panels — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-006 | Floor Joists, Strutting and Notching — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-007 | Roof Carcass and Trusses — Bracing and Restraint Straps — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-008 | Stud Walls and Door Linings — First Fix — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CJ-009 | Timber Moisture and Treatment Record — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-001 | Roof Deck and Vapour Control Layer — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-002 | Flat Roof — Insulation, Membrane, Laps, Upstands and Outlets — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-003 | Pitched Roof — Underlay, Battens, Tiles and Fixings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-004 | Flashings, Abutments and Lead Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-005 | Green and Blue Roof Build-Up — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-006 | Liquid-Applied Roof Coatings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RO-007 | Rooflights, Vents and Penetrations — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-001 | Setting Out, Brackets and Rails — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-002 | Insulation, Cavity Barriers and Fire-Stopping in the Cavity — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-003 | Panel Installation — Rainscreen, Composite and Timber — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-004 | Curtain Walling and Structural Glazing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-CL-005 | Sealing, Interfaces and Water Testing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-001 | Substrate, Beads and Mesh — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-002 | Render Coats, Curing and Finish — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-RN-003 | External Wall Insulation — Fixings, Fire Barriers and Base Coat — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-001 | Opening Preparation, DPCs and Cavity Closers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-002 | Window and Door Frame Installation — Fixings, Packers and Sealing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-003 | Glazing — Glass Specification, Marks, Drainage and Beads — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-GL-004 | Window Films, Manifestation and Adjustment — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-001 | Kerbs, Edgings and Sub-Base — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-002 | Paving, Tactiles and Accessible Gradients — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-003 | Asphalt and Macadam Surfacing — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-004 | Fencing, Gates and Barriers — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-005 | Soft Landscaping — Soils, Planting, Tree Pits and Irrigation — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-006 | Car Park and Road Line Marking — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-EW-007 | Playground and Sports Surfaces and Markings — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-001 | Site Set-Up, Hoarding and Welfare — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-002 | Protection of Finished Work — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | D0 | 2026-08-29 | Draft — not approved | |
| KD-QA-SL-003 | Builder's Clean and Sparkle Clean — Quality Inspection Checklist | A0 | 2026-08-29 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-001 | Retail Strip-Out Within a Trading Environment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-002 | Shopfront and Entrance Screen Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-003 | Counters, Fixtures and Racking Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-004 | Interior Fit-Out Joinery and Wall Linings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-SF-005 | Signage and Branding Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-001 | Tree Felling — Ground-Based | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-002 | Climbing Operations and Sectional Dismantling | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-003 | Tree Work from MEWPs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-004 | Chipping and Processing Arisings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-AB-005 | Stump Grinding | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-AB-005 | Stump Grinding | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-001 | Water-Fed Pole Cleaning from the Ground | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-002 | Rope Access Window and Facade Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-003 | MEWP and Cradle Window Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-004 | Internal and Low-Level Glazing Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-WK-005 | Facade Soft Washing and Render Cleaning | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-001 | Kitchen Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-002 | Kitchen Installation — Units, Worktops and Appliances | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-003 | Bathroom Strip-Out and Removal | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-004 | Bathroom Installation — Sanitaryware and Wet Areas | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-KB-005 | Worktop Templating and Stone Fitting | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-001 | Containment and Cable Basket Installation | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-002 | Structured Cabling Installation and Termination | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-003 | Comms Room and Cabinet Build | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-004 | Optical Fibre Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-004 | Optical Fibre Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-DC-005 | External Ducts and Chamber Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-001 | Reactive Maintenance Call-Outs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-002 | Planned Fabric Maintenance and Repairs | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-003 | Gutter Clearing and Roofline Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-004 | Minor Plumbing and Drainage Maintenance | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D0 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | D1 | 2026-08-31 | Draft — not approved | |
| KD-RAMS-PM-005 | Void Property Works and Pre-Let Refurbishment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AS-019 | COSHH Assessment — Asbestos — Non-Licensed Work | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CD-020 | COSHH Assessment — Demolition and Breaking-Out Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FC-021 | COSHH Assessment — Fibre Cement Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MD-022 | COSHH Assessment — MDF and Engineered Board Dust | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PU-023 | COSHH Assessment — Two-Pack Polyurethane Coatings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PR-024 | COSHH Assessment — Polyester and Fibreglass Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AC-025 | COSHH Assessment — Acrylic and MMA Resins | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RA-026 | COSHH Assessment — Resin Anchors and Chemical Fixings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BP-027 | COSHH Assessment — Bituminous Paints and Primers | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-WP-028 | COSHH Assessment — Wood Preservatives and Treatments | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BA-029 | COSHH Assessment — Brick Acid and Masonry Cleaners | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PL-030 | COSHH Assessment — Plaster and Render | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SC-031 | COSHH Assessment — Screeds and Self-Levelling Compounds | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-TA-032 | COSHH Assessment — Tile Adhesives and Grouts | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CA-033 | COSHH Assessment — Contact Adhesives | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-MO-034 | COSHH Assessment — Mould Release Agents and Form Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-FS-035 | COSHH Assessment — Fire-Stopping and Intumescent Products | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-IN-036 | COSHH Assessment — Insulation Boards — PIR, PUR and Polystyrene | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-SO-037 | COSHH Assessment — Soldering Flux and Solder | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CO-038 | COSHH Assessment — Cutting and Threading Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-HO-039 | COSHH Assessment — Hydraulic and Lubricating Oils | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-RF-040 | COSHH Assessment — Refrigerant Gases | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-AE-041 | COSHH Assessment — Adhesive and Solvent Aerosol Sprays | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-VF-042 | COSHH Assessment — Wood Stains, Varnishes and Floor Finishes | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-PH-043 | COSHH Assessment — Pesticides and Herbicides | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-BD-044 | COSHH Assessment — Bird and Rodent Droppings | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LI-045 | COSHH Assessment — Lime Mortars and Hydrated Lime | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-LG-046 | COSHH Assessment — Legionella in Water Systems | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-DM-047 | COSHH Assessment — Damp, Mould and Fungal Spores | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | D0 | 2026-09-01 | Draft — not approved | |
| KD-COSHH-CM-048 | COSHH Assessment — Carbon Monoxide from Engines and Heaters | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SI-001 | Site Signing-In and Attendance Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VR-002 | Visitor Register and Briefing Acknowledgement | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IR-003 | Induction Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IR-003 | Induction Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TC-004 | Training and Competence Matrix | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TC-004 | Training and Competence Matrix | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FW-005 | Fit-to-Work and Emergency Contact Declaration | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NS-006 | New Starter and Young or Vulnerable Person Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RR-007 | RAMS Review and Acceptance Form | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RB-008 | RAMS Briefing and Acceptance Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PS-009 | Subcontractor Pre-Start Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-CC-010 | Contractor Insurance and Accreditation Schedule | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SO-011 | Safety Observation and RAMS Spot-Check Card | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SN-012 | Site Instruction and Stop-Work Notice | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-SD-013 | Site Diary | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-SD-013 | Site Diary | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DC-014 | Start-of-Shift Site Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-VI-015 | Verbal Instruction Confirmation | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DL-016 | Delivery and Materials Received Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-PR-017 | Plant on Site Register and Hire Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-TW-018 | Temporary Works Register and Design Check Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IS-019 | Services Isolation Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IS-019 | Services Isolation Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-KA-020 | Key and Access Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-KA-020 | Key and Access Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WT-021 | Waste Transfer and Skip Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FL-022 | Fuel, Oil and Spill Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NM-023 | Noise, Dust and Vibration Monitoring Log | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-WX-024 | Weather and Adverse Conditions Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-025 | Accident Book Entry | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-AB-025 | Accident Book Entry | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-NR-026 | Incident and Near-Miss Report | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-IV-027 | Investigation and Corrective Action Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-RD-028 | RIDDOR Decision Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-RD-028 | RIDDOR Decision Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FA-029 | First-Aid Needs Assessment and Kit Check | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-FD-030 | Fire Drill and Alarm Test Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-EB-031 | Emergency Arrangements Board Sheet | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-MT-032 | Progress and Health-and-Safety Meeting Record | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DR-033 | Drawing and Document Control Register | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DR-033 | Drawing and Document Control Register | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | D0 | 2026-09-01 | Draft — not approved | |
| KD-SITE-DM-034 | Demobilisation and Site Close Checklist | A0 | 2026-09-01 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-RA-001 | Construction Phase Fire Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FP-002 | Construction Phase Fire Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-FM-003 | Fire Marshal Appointment and Duties | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-HR-004 | Hot Works Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-HR-004 | Hot Works Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-ER-005 | Fire Point and Escape Route Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-AR-006 | Arson and Security Risk Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TA-007 | Temporary Accommodation Fire Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-FIRE-TF-008 | Timber Frame and Combustible Structure Fire Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-AP-001 | Temporary Works Coordinator and Supervisor Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DB-002 | Temporary Works Design Brief | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DB-002 | Temporary Works Design Brief | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CA-003 | Temporary Works Category Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CA-003 | Temporary Works Category Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-DC-004 | Design Check Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-DC-004 | Design Check Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-IL-005 | Temporary Works Inspection Before Loading or Use | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-CC-006 | Temporary Works Change Control Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-CC-006 | Temporary Works Change Control Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | D0 | 2026-09-02 | Draft — not approved | |
| KD-TW-RS-007 | Temporary Works Removal and Strike Release | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CL-001 | Lift Plan — Crane Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-GL-002 | Lift Plan — Generic Repetitive Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AP-003 | Appointed Person, Lifting Supervisor and Slinger-Signaller Appointment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-CS-004 | Crane Set-Up and Ground Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-AC-005 | Lifting Accessories Pre-Use Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-EZ-006 | Exclusion Zone and Load Path Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-LIFT-LR-007 | Lifting Operation Record and Hook-Time Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-TP-001 | Site Traffic Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-TP-001 | Site Traffic Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-DM-002 | Delivery Management Plan and Booking Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-BM-003 | Banksman and Vehicle Marshal Appointment and Briefing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-VR-004 | Site Speed and Vehicle Rules Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-PI-005 | Public Interface Plan — Schools, Shops and Occupied Buildings | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TM-RV-006 | Reversing and Restricted Visibility Control Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-SW-001 | Site Waste Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SW-001 | Site Waste Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-RR-002 | Environmental Risk Register and Aspects Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-DN-003 | Dust and Noise Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-WP-004 | Water Pollution Prevention Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-ET-005 | Ecology and Tree Protection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-SR-006 | Spill Response Plan and Drill Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ENV-IR-007 | Environmental Incident Report | D0 | 2026-09-02 | Draft — not approved | |
| KD-ENV-IR-007 | Environmental Incident Report | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-HS-001 | Health Surveillance Register and Programme | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HS-001 | Health Surveillance Register and Programme | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-HV-002 | HAVS Risk Assessment by Tool and Task | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-NA-003 | Noise Risk Assessment by Activity | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RP-004 | RPE Selection and Face-Fit Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-SK-005 | Skin Surveillance and Dermatitis Check Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-DA-006 | Drug and Alcohol Policy Statement and Testing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LW-007 | Lone Working Risk Assessment | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-LW-007 | Lone Working Risk Assessment | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-OH-RF-008 | Occupational Health Referral and Fitness Certificate Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FA-020 | Fall-Arrest Anchor and Eyebolt Inspection Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HO-021 | Construction Hoist Daily Check and Weekly Inspection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TC-022 | Tower Crane Weekly Inspection and Wind Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MC-023 | Mobile Crane Pre-Use and Set-Up Check | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-MW-024 | MEWP Pre-Use Inspection and Familiarisation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AT-025 | Attachments and Forks Thorough-Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-FF-026 | Formwork and Falsework Pre-Pour Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-ES-027 | Excavation Support Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-ES-027 | Excavation Support Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-CS-028 | Confined-Space Equipment Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-CS-028 | Confined-Space Equipment Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-GD-029 | Gas Detector Bump-Test and Calibration Log | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PE-030 | PPE Issue and Replacement Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WF-031 | Welfare Facilities Weekly Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-EG-032 | Edge Protection and Guardrail Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-HF-033 | Hoarding and Fencing Boundary Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-WH-034 | Water Hygiene Log — Temporary Supplies | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-TR-035 | Temporary Works Removal Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-RA-036 | Roof Access and Fragile-Surface Inspection Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-AW-037 | Abrasive Wheel and Cartridge-Operated Tool Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-PA-038 | Portable Appliance Inspection and Test Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-SL-039 | Site Lighting and Emergency Lighting Test Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-INS-LV-040 | LEV and On-Tool Extraction Examination Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-006 | Built-Up and Composite Metal Cladding — Liner, Spacer, Insulation, Outer Sheet and Fasteners — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-007 | Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-008 | SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-CL-009 | Copings, Cappings, Soffits and Louvres — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-004 | Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-005 | Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-006 | Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-DS-007 | Escape Doors and Final Exits — Panic Hardware, Electric Locking and Alarm Release — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-008 | Street Furniture, Bollards, Cycle Stands and Signs — Foundations and Fixing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-009 | Lighting Columns, Feeder Pillars and External Ducts — Foundations, Ducts and Alignment — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-010 | Ironwork in Paved Surfaces — Covers, Gullies, Frames and Levels — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-EW-011 | Resin-Bound and Resin-Bonded Surfacing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-009 | SuDS — Attenuation Tanks, Crates, Soakaways and Permeable Sub-Base — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-010 | Manholes and Inspection Chambers — Bases, Benching, Rings, Steps and Covers — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-011 | Interceptors, Separators, Pumping Stations and Below-Ground Tanks — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-GW-012 | Ground Gas and Radon Protection — Membrane, Venting and Verification — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-006 | Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-FP-007 | Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-004 | Render Repair and Re-Rendering of Existing Walls — Survey, Removal, Making Good and New Coats — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RN-005 | Lime Render — Traditional and Heritage Walls — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-008 | Single-Ply Membrane — Fastening Pattern, Welds and Peel Tests — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-009 | Metal Standing Seam and Profiled Metal Roofing — Halters, Seams, Expansion and Terminations — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-010 | Reinforced Bitumen Membranes — Built-Up Felt Roofing — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-011 | Gutters, Rainwater Outlets and Overflows — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-RO-012 | Terraces and Balconies — Membrane, Drainage, Pedestals, Thresholds and Balustrade Fixings — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-004 | Type C Cavity Drainage Membrane — Membrane, Channels, Sumps and Pumps — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-QA-WP-005 | Type B Integral Waterproofing — Waterbars, Kickers, Construction Joints and Crack Control — Quality Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LF-001 | Safe System of Work — Replacing a Light Fitting | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-KF-002 | Safe System of Work — Fitting a Kitchen | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LL-003 | Safe System of Work — Laying Laminate Flooring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PR-004 | Safe System of Work — Plastering a Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BS-005 | Safe System of Work — Fitting a Bathroom Suite | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-WR-006 | Safe System of Work — Replacing a Window | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CU-007 | Safe System of Work — Installing a Consumer Unit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-HD-008 | Safe System of Work — Hanging a Door | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-TW-009 | Safe System of Work — Tiling a Wet Room | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PT-010 | Safe System of Work — Painting an Exterior at Low Level from a Tower | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GU-011 | Safe System of Work — Fitting Guttering from a Platform | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-LI-012 | Safe System of Work — Installing Loft Insulation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PA-013 | Safe System of Work — Laying a Patio | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-GF-014 | Safe System of Work — Erecting a Garden Fence | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BL-015 | Safe System of Work — Boarding a Loft | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-BF-016 | Safe System of Work — Fitting a Boiler Flue | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CW-017 | Safe System of Work — Chasing Walls for Cables | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-CD-018 | Safe System of Work — Core Drilling a Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-PW-019 | Safe System of Work — Pressure Washing a Facade at Ground Level | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | D0 | 2026-09-02 | Draft — not approved | |
| KD-SSW-DW-020 | Safe System of Work — Small Demolition of a Non-Load-Bearing Wall | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RO-001 | Health and Safety Responsibilities and Organisation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-RA-002 | Risk Assessment and Method Statement Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AR-003 | Accident, Incident and RIDDOR Reporting Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-TC-004 | Training, Competence and Induction Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-SC-005 | Subcontractor Selection and Control Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CC-006 | Consultation and Communication Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MA-007 | Monitoring, Inspection and Audit Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PP-008 | PPE Provision and Maintenance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-MH-009 | Manual Handling Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-MH-009 | Manual Handling Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WH-010 | Work at Height Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WH-010 | Work at Height Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PE-011 | Plant and Work Equipment Arrangements — PUWER and LOLER | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-CS-012 | COSHH and Hazardous Substances Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-AS-013 | Asbestos Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-AS-013 | Asbestos Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FE-014 | Fire and Emergency Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-FA-015 | First Aid Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-FA-015 | First Aid Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-OH-016 | Occupational Health and Health Surveillance Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-WF-017 | Welfare Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-WF-017 | Welfare Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-YN-018 | Young, New and Expectant Workers Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-EW-019 | Environmental and Waste Arrangements | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HSA-PR-020 | Health and Safety Policy Review and Objectives Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BC-001 | Inspection and Test Plan — BMS and Controls | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BS-002 | Inspection and Test Plan — Balustrades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-BM-003 | Inspection and Test Plan — Bricklaying and Masonry | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CJ-004 | Inspection and Test Plan — Carpentry and Joinery First Fix | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CE-005 | Inspection and Test Plan — Ceilings and Access Floors | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CL-006 | Inspection and Test Plan — Cladding and Façades | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CF-007 | Inspection and Test Plan — Concrete and Formwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-CR-008 | Inspection and Test Plan — Concrete Cutting and Repair | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DP-009 | Inspection and Test Plan — Damp and Preservation | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PD-010 | Inspection and Test Plan — Decoration | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DM-011 | Inspection and Test Plan — Demolition and Strip-Out | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DS-012 | Inspection and Test Plan — Doors and Shutters | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EL-013 | Inspection and Test Plan — Electrical | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-EW-014 | Inspection and Test Plan — External Works and Landscaping | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FS-015 | Inspection and Test Plan — Fire Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FF-016 | Inspection and Test Plan — Fitted Furniture and FF&E | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FL-017 | Inspection and Test Plan — Flooring and Tiling | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GL-018 | Inspection and Test Plan — Glazing and Windows | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-GW-019 | Inspection and Test Plan — Groundworks and Civils | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MG-020 | Inspection and Test Plan — Healthcare Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-IN-021 | Inspection and Test Plan — Insulation and Airtightness | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-LV-022 | Inspection and Test Plan — Lifts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MS-023 | Inspection and Test Plan — Mastic and Sealant | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ME-024 | Inspection and Test Plan — Mechanical Services | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PT-025 | Inspection and Test Plan — Partitions | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-FP-026 | Inspection and Test Plan — Passive Fire Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-PS-027 | Inspection and Test Plan — Piling and Substructure | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-DL-028 | Inspection and Test Plan — Plastering and Drylining | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-MC-029 | Inspection and Test Plan — Precast, Timber Frame and MMC | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RN-030 | Inspection and Test Plan — Render and External Finishes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-RO-031 | Inspection and Test Plan — Roofing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SC-032 | Inspection and Test Plan — Screed | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SJ-033 | Inspection and Test Plan — Second-Fix Joinery | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-SF-034 | Inspection and Test Plan — Steel Fixing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-ST-035 | Inspection and Test Plan — Structural Steel and Metalwork | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | D0 | 2026-09-02 | Draft — not approved | |
| KD-ITP-WP-036 | Inspection and Test Plan — Waterproofing and Tanking | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-PC-001 | Practical Completion Inspection Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-PC-001 | Practical Completion Inspection Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-HC-002 | Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OM-003 | O&M Manual Contents Schedule and Compilation Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-BU-004 | Building User Guide | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-BU-004 | Building User Guide | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CE-005 | Commissioning Completion Certificate — Electrical Installation and Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-CM-006 | Commissioning Completion Certificate — Mechanical and Water Systems | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-FS-007 | Fire and Life-Safety Systems Handover Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-TR-008 | Client Training and Demonstration Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-TR-008 | Client Training and Demonstration Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-MR-009 | Meter Readings, Utilities and Services Handover Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-WR-010 | Warranty, Guarantee and Certificate Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-OW-011 | Outstanding Works Schedule at Practical Completion | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HO-ED-012 | End of Defects Period Inspection and Making-Good Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-WH-001 | Work at Height Rescue Plan — Harness and Fall Arrest | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-MW-002 | MEWP Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-MW-002 | MEWP Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CS-003 | Confined Space Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CS-003 | Confined Space Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-EX-004 | Excavation and Trench Collapse Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-CR-005 | Crane Operator and Tower Crane Cab Rescue Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-RES-DR-006 | Rescue Drill and Rehearsal Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RA-001 | Point-of-Work Risk Assessment (POWRA) | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-PB-002 | Daily Pre-Task Briefing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-DR-003 | Dynamic Risk Assessment Card | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-LM-004 | Last-Minute Risk Assessment Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-TC-005 | Task Change and Stop-and-Reassess Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POW-RG-006 | POWRA Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-POW-RG-006 | POWRA Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-RG-001 | Asbestos Register — Site Copy | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-RG-001 | Asbestos Register — Site Copy | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-MP-002 | Asbestos Management Plan | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-MP-002 | Asbestos Management Plan | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-SB-003 | Refurbishment and Demolition Survey Brief and Scope | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-NL-004 | Non-Licensed Asbestos Work Assessment and Notification Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-EH-005 | Asbestos Worker Exposure and Health Record Index | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-ASB-HO-006 | Asbestos Removal Handover and Reoccupation Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EC-002 | Emergency Contacts and Assembly Point Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FA-003 | First-Aiders and First-Aid Equipment Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-FN-004 | Fire Action Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-FN-004 | Fire Action Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PP-005 | PPE Requirements Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PP-005 | PPE Requirements Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-SN-006 | Statutory Notices Display Checklist | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-PB-007 | Permits in Force Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-PB-007 | Permits in Force Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-TR-008 | Site Traffic and Pedestrian Rules Board | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-DU-009 | Delivery and Unloading Instructions Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WF-010 | Welfare Facilities Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WF-010 | Welfare Facilities Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-IN-011 | Induction Required — Report to the Site Office | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-EZ-012 | Exclusion Zone — Lifting Operation or Demolition in Progress | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-HP-013 | Hearing Protection Zone Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-RA-014 | Restricted Area — Permit Required, Authorised Persons Only | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | D0 | 2026-09-02 | Draft — not approved | |
| KD-NOT-WH-015 | Working Hours and Considerate Site Notice | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-EX-001 | 360° Excavator — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-TH-002 | Telehandler — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DU-003 | Forward-Tipping Dumper — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-RO-004 | Ride-On Roller — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-FL-007 | Counterbalance Forklift — Weekly Operator Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-GL-008 | Generator and Site Lighting Tower — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-CP-009 | Compressor and Pneumatic Tools — Weekly Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-SV-010 | Site Vehicles and Vans — Weekly Driver Check Sheet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-OA-011 | Plant Operator Authorisation and Competence Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-PLT-DQ-012 | Plant Defect Report and Quarantine Tag Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-AP-001 | Authorised Person and Competent Person Appointment Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-LV-002 | LV Permit to Work and Limitation of Access Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-MG-003 | Medical Gas Pipeline Systems Permit to Work | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-CV-004 | Critical Ventilation Isolation and Reinstatement Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-WS-005 | Water Systems Work Authorisation and Flushing Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-IC-006 | Infection Control Risk Assessment and Permit | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-FS-007 | Fire Safety Impact Assessment — Occupied Healthcare Building | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | D0 | 2026-09-02 | Draft — not approved | |
| KD-HTM-HB-008 | Ward and Department Handback Certificate | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PQ-001 | Subcontractor Pre-Qualification Questionnaire | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-HS-002 | Health and Safety Conditions of Subcontract | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-AR-003 | Approved Subcontractor Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-AR-003 | Approved Subcontractor Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-IE-004 | Subcontractor Insurance and Accreditation Expiry Register | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-PR-005 | Subcontractor Performance Review and Scoring | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | D0 | 2026-09-02 | Draft — not approved | |
| KD-SUB-SP-006 | Subcontractor Start-Up Pack Issue Record | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-001 | Mortar Mixing — Cement, Lime and Admixtures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-002 | Wind Stability of New and Free-Standing Masonry | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-003 | Strain from Repetitive Brick and Block Laying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-004 | Bricklaying in Cold, Wet and Hot Weather | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-BR-005 | Using Working Platforms for Bricklaying | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-001 | Hardwood and Sensitising Timber Dust Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-002 | Circular Saws — Guards, Blades and Kickback | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-003 | Pneumatic and Powder-Actuated Fastening Tools | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-004 | Working Preservative-Treated Timber | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CA-005 | Kneeling and Overhead Fixing in Joinery | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-001 | Facade Bracket Anchors and Proof Testing | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-002 | Mast Climbing Work Platforms — Facade Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-003 | Site Water Testing of Facades and Windows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-004 | Cutting Out Failed Facade Movement-Joint Sealants | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CL-005 | Temporary Weather Protection of Facades | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-001 | Falsework Monitoring During the Pour | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-002 | Thermal Protection of Pours | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-002 | Thermal Protection of Pours | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-003 | Concrete Pump Set-Up and Boom Placement | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-004 | Projecting Reinforcement — Impalement Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-CN-005 | Concrete Sampling and Cube Making | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-001 | Pre-Demolition Hazardous Strip | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-002 | Demolition Next to Retained Structures | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-003 | Demolition Dust Suppression and Monitoring | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-004 | Hand Dismantling of Pitched Timber Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-DM-005 | Loading Out Demolition Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-DM-005 | Loading Out Demolition Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-001 | Arc Flash — Switching Energised LV Switchgear | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-002 | Work On or Near Live Low-Voltage Conductors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-003 | Heavy Cable Pulling — Winched and Riser Pulls | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EL-004 | First Energisation and Live-Status Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-001 | Work Within Root Protection Areas | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-001 | Work Within Root Protection Areas | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-002 | Topsoil and Subsoil Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-003 | Soakaways and Infiltration Crates | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-004 | Compactor and Breaker Noise and Vibration | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-EX-005 | Night Working and Lighting Towers | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-EX-005 | Night Working and Lighting Towers | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-001 | Fire-Stopping Products — Fume and Skin Exposure | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-002 | Plural-Component Spraying of Fire Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-003 | Opening Up Fire-Stopping for Inspection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-004 | Air-Leakage Testing — Fan Pressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FP-005 | Fire-Stopping Inspection — Risers and Voids | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-001 | Mixing Cementitious and Epoxy Adhesives and Grouts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-002 | MMA Resin Flooring — Vapour and Odour Control | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-003 | Uplift of Old Floor Tiles and Bitumen Adhesive | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-004 | Anti-Slip Treatment of Hard Floors | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-FO-005 | Substrate Moisture Testing and Surface DPMs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-001 | Toughened and Laminated Glass Handling | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-002 | Glazing Sealants, Primers and Solvent Cleaners | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-003 | Fixing Window Frames — Anchors and Restraint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-004 | High-Rise Glazing Repairs by Rope Access | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GL-005 | Planned Removal of Broken Glass and Glass Waste | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-001 | Trial Pits and Plate Bearing Tests | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-002 | Confined Space Entry — Manholes and Ducts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-003 | High-Pressure Water Jetting and Hydrodemolition | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-004 | Underground Fuel Tank Removal | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-GW-005 | Pumping Out Flooded Excavations and Basements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-001 | Forklift and Pallet Truck Operation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-002 | Hazardous Waste Identification and Storage | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-003 | Cleaning in Confined Spaces | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-004 | Acid and Solvent Cleaning | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-LG-005 | Clean-Down of Settled Dust | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-001 | Pressure Vessel Isolation and Depressurisation | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-002 | Refrigerant Recovery, Evacuation and Charging | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-003 | Hand-Arm Vibration — Drilling and Cutting | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-004 | Heavy Pipework Supports, Anchors and Bellows | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-MP-005 | Legionella Control from First Fill to Handover | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-001 | Two-Pack Epoxy and Polyurethane Coatings | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-002 | Spray Painting — Respiratory Protection | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-003 | Overcoating Sound Lead Paint | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-004 | Chemical Paint Stripping | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-004 | Chemical Paint Stripping | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PA-005 | Rope Access Painting and Coating | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PA-005 | Rope Access Painting and Coating | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-001 | Slinging, Rigging and Load Security | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-002 | Signalling for Lifts and Plant Movements | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-003 | Ground Bearing Checks and Outrigger Mat Set-Up | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-004 | MEWP Emergency Lowering and Rescue | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-PL-005 | Lifting Accessory Pre-Use Inspection and Quarantine | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-001 | Loading Out and Storing Materials on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-002 | Hot Bitumen Boilers and Pour-and-Roll Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-003 | Primers, Adhesives and Liquid Coatings on Roofs | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-004 | Noise from Roofing Tools and Plant | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-RF-005 | Weather Stop Rules for Roof Work | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-001 | Cantilever, Truss-Out and Hung Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-002 | Rescue of Casualties from Scaffolds | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-003 | Loading Materials onto Scaffold Lifts | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-004 | Scaffolding Work in High Winds, Storms and Ice | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | D0 | 2026-09-11 | Draft — not approved | |
| KD-RA-SC-005 | Scaffold Alterations While in Use | A0 | 2026-09-11 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-AP-001 | Interim Payment Application | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-AP-001 | Interim Payment Application | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-DN-002 | Payee's Notice in Default | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-DN-002 | Payee's Notice in Default | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PN-003 | Payment Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PN-003 | Payment Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PL-004 | Pay Less Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PL-004 | Pay Less Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-SN-005 | Notice of Intention to Suspend Performance | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-PT-006 | Payment Dates Tracker | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-PT-006 | Payment Dates Tracker | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-LP-007 | Late Payment Interest and Compensation Claim | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PAY-RR-008 | Retention Register and Release Request | D0 | 2026-09-12 | Draft — not approved | |
| KD-PAY-RR-008 | Retention Register and Release Request | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-VR-001 | Subcontractor Verification Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-VR-001 | Subcontractor Verification Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-PD-002 | Payment and Deduction Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-PD-002 | Payment and Deduction Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-CIS-MP-003 | Monthly Payments and Materials Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VR-001 | Variation and Change Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VR-001 | Variation and Change Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-VQ-002 | Variation Quotation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-VQ-002 | Variation Quotation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DW-003 | Daywork Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DW-003 | Daywork Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-DR-004 | Daywork Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-DR-004 | Daywork Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-ND-005 | Notice of Delay to Progress | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-ND-005 | Notice of Delay to Progress | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-LE-006 | Loss and Expense Notification | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-LE-006 | Loss and Expense Notification | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-RQ-007 | RFI and Technical Query Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-RQ-007 | RFI and Technical Query Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-KD-008 | Contract Summary and Key Dates | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-KD-008 | Contract Summary and Key Dates | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CA-FA-009 | Final Account Reconciliation | D0 | 2026-09-12 | Draft — not approved | |
| KD-CA-FA-009 | Final Account Reconciliation | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-AP-001 | Building Regulations Dutyholder Appointments | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CS-002 | Dutyholder Competence Declaration | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CO-003 | Completion Notice and Client Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CO-003 | Completion Notice and Client Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-DS-004 | Dutyholder Completion Statements — PC and PD | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CH-005 | Change of Dutyholder Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BR-CH-005 | Change of Dutyholder Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DR-013 | Design Risk Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DR-013 | Design Risk Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DD-015 | Designer's Duties Checklist | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DD-015 | Designer's Duties Checklist | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CC-001 | HRB Change Control Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CC-001 | HRB Change Control Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CA-002 | HRB Change Assessment and Notification Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MS-003 | HRB Occurrence Reporting System and Report Form | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-MR-004 | HRB Occurrence Log | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-MR-004 | HRB Occurrence Log | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-005 | HRB Construction Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-005 | HRB Construction Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G2-006 | HRB Competence Declaration and Change Control Plan | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-G3-007 | HRB Completion Declarations and Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | D0 | 2026-09-12 | Draft — not approved | |
| KD-BSA-CL-008 | HRB Completion Checklist and Handover Receipt | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-RW-001 | Right to Work Check Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-RW-001 | Right to Work Check Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-AL-002 | Annual Leave and Holiday Pay Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-WT-003 | Working Time Record and 48-Hour Opt-Out | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-NM-004 | New or Expectant Mother Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-YP-005 | Young Person Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-YP-005 | Young Person Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-HR-DS-006 | Display Screen Equipment Workstation Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RA-001 | Risk Assessment — Blank with 5×5 Matrix | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MS-002 | Method Statement — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MS-002 | Method Statement — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-RM-003 | RAMS — Blank Combined for Small Jobs | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-CO-004 | COSHH Assessment — Blank | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-CO-004 | COSHH Assessment — Blank | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | D0 | 2026-09-12 | Draft — not approved | |
| KD-BL-MX-005 | 5×5 Risk Matrix and Scoring Guide | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-QP-001 | Quality Policy and Management System Scope | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-QP-001 | Quality Policy and Management System Scope | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EN-002 | Environmental Policy Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EN-002 | Environmental Policy Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-ED-003 | Equality, Diversity and Inclusion Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-MS-004 | Modern Slavery Policy and Supply Chain Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-AB-005 | Anti-Bribery and Corruption Policy | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-DP-006 | Data Protection Policy and Site Worker Privacy Notice | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-BS-007 | Building Safety Competence Statement | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-BS-007 | Building Safety Competence Statement | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | D0 | 2026-09-12 | Draft — not approved | |
| KD-PQ-EI-008 | Pre-Qualification Evidence Index | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-SA-001 | Site Health and Safety Audit — Scored | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-CM-002 | Company Health and Safety Management Audit | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | D0 | 2026-09-12 | Draft — not approved | |
| KD-AUD-AP-003 | Audit Programme and Results Summary | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-PF-009 | Premises Fire Risk Assessment | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | D0 | 2026-09-12 | Draft — not approved | |
| KD-FIRE-DS-010 | DSEAR Assessment — Flammable Substances | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | D0 | 2026-09-12 | Draft — not approved | |
| KD-INS-SN-041 | Safety Net Handover and Inspection Record | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-006 | Work Near Overhead Power Lines | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-007 | Tower Crane Erection and Dismantling | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-008 | Site Dumper Operations | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-008 | Site Dumper Operations | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-PL-009 | Excavator Operations — 360-Degree | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-GW-008 | Work Over or Near Water | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-GW-008 | Work Over or Near Water | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | D0 | 2026-09-12 | Draft — not approved | |
| KD-RAMS-SC-007 | Safety Net Rigging, Inspection and Striking | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-WB-009 | Whistleblowing Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-WB-009 | Whistleblowing Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-TE-010 | Tax Evasion and Fraud Prevention Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-AH-011 | Anti-Bullying and Harassment Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-DI-012 | DPIA and Individual Rights Request Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CY-013 | Cyber Security Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CY-013 | Cyber Security Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-ES-014 | ESG and Carbon Reduction Plan | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-SS-015 | Subcontractor Selection Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-RM-016 | Risk Management Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-RM-016 | Risk Management Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-CN-017 | Complaints and Non-Conformance Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-IW-018 | Illegal Working Prevention Procedure | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | D0 | 2026-09-13 | Draft — not approved | |
| KD-PQ-MH-019 | Health, Wellbeing and Fatigue Policy | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-EM-001 | CAS Evidence Map and Submission Tracker | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-TC-002 | Time-Critical Documents and Review Calendar | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-AS-003 | Accident Statistics and Enforcement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-HA-004 | Competent Adviser Appointment and Advice Log | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-PB-005 | Policy Briefing and Acknowledgement Record | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-CM-006 | Competence Management Procedure and TNA | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-SV-007 | Supervision Structure and Supervision Matrix | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-LU-008 | Legal and Technical Updates Register | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-MR-009 | Annual Management Review | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-MR-009 | Annual Management Review | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | D0 | 2026-09-13 | Draft — not approved | |
| KD-CAS-ND-010 | Declarations and Not-Applicable Statements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-CD-021 | CDM Dutyholder Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HSA-SA-022 | Site Security Arrangements | D0 | 2026-09-13 | Draft — not approved | |
| KD-HSA-SA-022 | Site Security Arrangements | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | D0 | 2026-09-13 | Draft — not approved | |
| KD-BR-CB-006 | Client Building Safety Duties Brief | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-QU-001 | Builder's Quotation | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-QU-001 | Builder's Quotation | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-IN-002 | Invoice — CIS and VAT Reverse Charge | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-CC-003 | Completion Certificate for the Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-CC-003 | Completion Certificate for the Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | D0 | 2026-09-13 | Draft — not approved | |
| KD-TA-WG-004 | Workmanship Guarantee Certificate | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | D0 | 2026-09-13 | Draft — not approved | |
| KD-SITE-AB-035 | First-Aid and Injury Record Book | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-LG-009 | Legionella Risk Assessment — Water Systems | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-ST-010 | Work-Related Stress Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | D0 | 2026-09-13 | Draft — not approved | |
| KD-OH-MH-011 | Manual Handling Risk Assessment | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-DC-001 | Building Contract — Domestic Customer | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-DC-001 | Building Contract — Domestic Customer | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SW-002 | Small Works Contract — Business Client | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-AGR-SC-003 | Subcontract Agreement | D0 | 2026-09-13 | Draft — not approved | |
| KD-AGR-SC-003 | Subcontract Agreement | A0 | 2026-09-13 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-LR-001 | Homeowner's Legal Responsibilities Checklist | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-LR-001 | Homeowner's Legal Responsibilities Checklist | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BR-002 | Project Brief and Scope of Works | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BR-002 | Project Brief and Scope of Works | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BC-003 | Builder Checks Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BC-003 | Builder Checks Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-QC-004 | Quote Request and Comparison | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-QC-004 | Quote Request and Comparison | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CC-005 | Contract Checklist for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PS-006 | Payment Schedule and Receipts Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-CH-007 | Changes and Extra Costs Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-CH-007 | Changes and Extra Costs Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-JD-008 | Job Diary for Homeowners | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-JD-008 | Job Diary for Homeowners | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-SN-009 | Snag List and Handover — Home Improvements | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-SN-009 | Snag List and Handover — Home Improvements | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-GR-010 | Guarantees and Certificates Record | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-GR-010 | Guarantees and Certificates Record | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-PW-011 | Party Wall Notice Pack | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-PW-011 | Party Wall Notice Pack | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-LC-012 | Letter Before Claim — Building Work | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-HM-BL-013 | Letters to Your Builder | D0 | 2026-09-14 | Draft — not approved | |
| KD-HM-BL-013 | Letters to Your Builder | A0 | 2026-09-14 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-001 | Construction Phase Plan | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D2 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-PI-003 | Pre-Construction Information | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-HF-004 | Health and Safety File | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-NA-005 | Notification Assessment and Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-AP-006 | Duty-holder Appointments | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-IN-009 | Site Induction Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | D0 | 2026-08-31 | Draft — not approved | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | D1 | 2026-08-31 | Draft — not approved | |
| KD-PTW-WW-034 | Work Over or Near Water Permit | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | D0 | 2026-08-31 | Draft — not approved | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | D1 | 2026-08-31 | Draft — not approved | |
| KD-PTW-AD-035 | Asbestos Disturbance Area Permit | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-POL-001 | Health and Safety Policy | D0 | 2026-08-31 | Draft — not approved | |
| KD-POL-001 | Health and Safety Policy | D1 | 2026-08-31 | Draft — not approved | |
| KD-POL-001 | Health and Safety Policy | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-RS-001 | COSHH Assessment — Silica Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WD-002 | COSHH Assessment — Wood Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-GP-003 | COSHH Assessment — Plasterboard Dust | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CC-004 | COSHH Assessment — Cement and Wet Concrete | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-EP-005 | COSHH Assessment — Epoxy Resins and Hardeners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-IS-006 | COSHH Assessment — Isocyanates | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SV-007 | COSHH Assessment — Solvents and Thinners | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BT-008 | COSHH Assessment — Bitumen and Torch-On Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-WF-009 | COSHH Assessment — Welding Fume | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LD-010 | COSHH Assessment — Lead at Work | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-DE-011 | COSHH Assessment — Diesel Exhaust Emissions | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-FU-012 | COSHH Assessment — Petrol and Diesel | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LP-013 | COSHH Assessment — LPG | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-CL-014 | COSHH Assessment — Cleaning Chemicals | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-MW-015 | COSHH Assessment — Mineral Wool Fibres | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-SM-016 | COSHH Assessment — Sealants and Foams | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-LM-017 | COSHH Assessment — Aerosol Paints | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D0 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | D1 | 2026-08-31 | Draft — not approved | |
| KD-COSHH-BW-018 | COSHH Assessment — Sewage and Drains | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
Toolbox talks
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AW-022 | Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CT-023 | Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CA-024 | Toolbox Talk — Cable Avoidance — Scan, Mark, Hand-Dig | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ME-025 | Toolbox Talk — MEWPs — The Basket Is Not a Lift | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HA-026 | Toolbox Talk — Harness and Lanyard — Check It Like Your Life Depends on It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DA-027 | Toolbox Talk — Drugs and Alcohol — Not on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DR-028 | Toolbox Talk — Driving for Work — The Van Is Your Most Dangerous Tool | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-TW-029 | Toolbox Talk — Temporary Works — Do Not Touch the Props | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-PW-030 | Toolbox Talk — Permits to Work — What the Piece of Paper Is For | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-MP-031 | Toolbox Talk — Mobile Phones — The Head-Down Walk | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RF-032 | Toolbox Talk — Plant Refuelling — Fire, Fumes and the Drain | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-DE-033 | Toolbox Talk — Dermatitis and Skin Care — Hands That Last a Career | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GC-034 | Toolbox Talk — Gas Cylinders — Upright, Outside, Handled Like They Can Kill | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-YW-035 | Toolbox Talk — Young and New Workers — Look Out for Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LW-036 | Toolbox Talk — Lone Working — Who Knows Where You Are | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-NW-037 | Toolbox Talk — Working Near Water — Falling In Is the Easy Part | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-OH-038 | Toolbox Talk — Overhead Power Lines — You Do Not Have to Touch Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-CS-039 | Toolbox Talk — Confined Spaces — What Counts | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HT-040 | Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-EY-041 | Toolbox Talk — Eye Protection — Worn on the Face, Not the Helmet | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HP-042 | Toolbox Talk — Hearing Protection — Worn Properly or Not at All | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RP-043 | Toolbox Talk — RPE and Face Fit — The Seal Is the Protection | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SM-044 | Toolbox Talk — Sheet Materials — Plasterboard, Ply and the Wind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SR-045 | Toolbox Talk — Excavators — Stay Out of the Swing | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-RV-046 | Toolbox Talk — Reversing Vehicles and Banksmen — Nobody Reverses Blind | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AT-047 | Toolbox Talk — Mobile Access Towers — Built Right, Used Right | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HS-048 | Toolbox Talk — Hot Surfaces, Steam and Pressure — Live Until Proved Not | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-GE-049 | Toolbox Talk — Generators and Temporary Supplies — Earth It, Test It, Leave It Alone | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FR-050 | Toolbox Talk — Fragile Roofs — You Fall Through, Not Off | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FD-051 | Toolbox Talk — Fire Doors and Compartmentation — Why You Do Not Prop Them | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-BD-052 | Toolbox Talk — Board Dust — Plasterboard, MDF and the Fine Stuff | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-LE-053 | Toolbox Talk — Leptospirosis and Biological Hazards — What the Rats Left | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-AF-054 | Toolbox Talk — Asbestos — What to Do If You Find Something | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-HY-055 | Toolbox Talk — Hygiene and Hand Washing — What You Carry Home | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-FA-056 | Toolbox Talk — Accidents and First Aid — What Happens on This Site | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SP-057 | Toolbox Talk — Spill Response — Stop It, Contain It, Report It | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-SF-058 | Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-WI-059 | Toolbox Talk — Wind — When the Lift and the Sheet Wait | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | D0 | 2026-09-02 | Draft — not approved | |
| KD-TBT-ES-060 | Toolbox Talk — End of Shift — Made Safe, Locked Up | A0 | 2026-09-02 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WH-001 | Toolbox Talk — Working at Height — The Rules That Keep You Alive | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LA-002 | Toolbox Talk — Ladders and Stepladders | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SC-003 | Toolbox Talk — Scaffolds — Using Them Without Wrecking Them | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MH-004 | Toolbox Talk — Manual Handling — Your Back Has No Spare | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-DU-005 | Toolbox Talk — Construction Dust — The Slow Killer | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NO-006 | Toolbox Talk — Noise — Deaf Is Forever | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HV-007 | Toolbox Talk — Hand-Arm Vibration — White Fingers Do Not Come Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-CO-008 | Toolbox Talk — COSHH Basics — Read the Tin, Then the Sheet | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-AS-009 | Toolbox Talk — Asbestos Awareness — Where It Hides | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-FS-010 | Toolbox Talk — Fire on Site — Minutes, Not Hours | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-HW-011 | Toolbox Talk — Hot Works — The Fire Starts After You Leave | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EL-012 | Toolbox Talk — Electricity on Site — 110V, Leads and What Bites | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PL-013 | Toolbox Talk — Plant and Pedestrians — Seen or Squashed | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-LO-014 | Toolbox Talk — Lifting and Slinging — Beneath the Load Is Nowhere | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-EX-015 | Toolbox Talk — Excavations and Buried Services — The Ground Fights Back | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-ST-016 | Toolbox Talk — Slips, Trips and Housekeeping — The Boring Ones Break Bones | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-WE-017 | Toolbox Talk — Welfare, Heat and Weather — Look After the Machine | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-PP-018 | Toolbox Talk — PPE — Last Line, Worn Right | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-MW-019 | Toolbox Talk — Mental Health — Look Out for Each Other | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-NM-020 | Toolbox Talk — Near Misses — The Free Warnings | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D0 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | D1 | 2026-08-31 | Draft — not approved | |
| KD-TBT-SI-021 | Toolbox Talk — Silica — The Dust With a Number | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. |
Bundle
CDM 2015
| Reference | Document | Rev | Issued | Note | Approved by |
|---|---|---|---|---|---|
| KD-CDM-DR-013 | Design Risk Register | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DR-013 | Design Risk Register | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DI-014 | Designer's Risk Information Sheet | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DD-015 | Designer's Duties Checklist | D0 | 2026-09-12 | Draft — not approved | |
| KD-CDM-DD-015 | Designer's Duties Checklist | A0 | 2026-09-12 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-001 | Construction Phase Plan | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | D2 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-001 | Construction Phase Plan | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CP-002 | Construction Phase Plan — Small Works | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-PI-003 | Pre-Construction Information | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-PI-003 | Pre-Construction Information | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-HF-004 | Health and Safety File | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-HF-004 | Health and Safety File | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-NA-005 | Notification Assessment and Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-NA-005 | Notification Assessment and Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-AP-006 | Duty-holder Appointments | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-AP-006 | Duty-holder Appointments | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-CD-007 | Client CDM Duties — Brief and Acknowledgement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SK-008 | Skills, Knowledge and Experience Assessment | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-IN-009 | Site Induction Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-IN-009 | Site Induction Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-SR-010 | Site Rules — Display Edition | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-WC-011 | Worker Consultation and Briefing Record | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D0 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | D1 | 2026-08-31 | Draft — not approved | |
| KD-CDM-DC-012 | Domestic Client Projects — Reg 7 Notice and Agreement | A0 | 2026-08-31 | Author — director, UK principal contractor, SMSTS. Not an independent review. |