Bundles · Lifting and plant
Temporary works
The temporary works documents BS 5975-1:2024 expects a contractor to hold — appointments, the design brief, category assessment, design check certificate, inspection before loading, change control and the strike release.
Page one of the first three documents in the bundle. Orange helmet: usually slinger-signallers. Helmet colours vary from site to site; this is a common convention, not a legal standard.
What is in it
7 documents in 1 section. Open a section, jump to one, or filter across all of them.
Jump to a section · 1
Temporary works 7 documents
- KD-TW-AP-001 Temporary Works Coordinator and Supervisor Appointment 2 pages · 68 guided fields
- KD-TW-DB-002 Temporary Works Design Brief 3 pages · 70 guided fields
- KD-TW-CA-003 Temporary Works Category Assessment 2 pages · 36 guided fields
- KD-TW-DC-004 Design Check Certificate 2 pages · 70 guided fields
- KD-TW-IL-005 Temporary Works Inspection Before Loading or Use 2 pages · 61 guided fields
- KD-TW-CC-006 Temporary Works Change Control Record 2 pages · 67 guided fields
- KD-TW-RS-007 Temporary Works Removal and Strike Release 2 pages · 36 guided fields