The complete library · CDM 2015 documents

KD-CDM-PI-003

Pre-Construction Information

The client-side pack: the arrangements, the information already held — asbestos, services, ground — the residual design risks, and the file expectations, issued to every designer and contractor being considered.

2 pages · 59 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.

Statutory basis, cited on the form

  • CDM 2015 regs 4(4) and 11
  • HSE L153 (Managing health and safety in construction, 2015)

What it is not

It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".

Format

AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.

This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.

More in CDM 2015 documents

14 documents