Quality inspection checklists · Piling & Substructure · Piling and substructure quality checklists
KD-QA-PS-003
Pile Cut-Off and Integrity Testing — Quality Inspection Checklist
Cut-off level, position and verticality measured and integrity results accepted BEFORE any cap is built · one sheet per pile group
4 pages · 186 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- SPERW (3rd edition, 2016) (ICE Specification for Piling and Embedded Retaining Walls)
- BRE BR 470 (2004) (working platforms for tracked plant)
- the delivery ticket)
- making and curing cubes)
- CDM 2015 regs 22(4), 24 and 25(4)
- NHBC Standards 2024 Chapters 4 to 7 (4.4 raft, pile, pier and beam foundations)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 5975-1:2024 (temporary works — the working platform and underpinning support)
- BS 8004:2015 (foundations — underpinning)
- BS EN 13670:2009 (execution of concrete structures)
- BS 8500-1:2023 and BS 8500-2:2023 (specifying concrete
- BS EN 12350-2:2019 and BS EN 12390-2:2019 (slump test
- HSG47 (3rd edition, 2014)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Piling and substructure quality checklists
4 documents
More for piling & substructure.
5 rams · 5 quality inspection checklists · 4 permits to work · 2 site inspection records