Quality inspection checklists · Modern Methods of Construction · Precast, timber frame and MMC quality checklists

KD-QA-MC-001

Precast Delivery, Bearings and Fixings — Quality Inspection Checklist

Bearing lengths measured, fixings made and grout cured BEFORE the units carry load · one sheet per unit group or level

4 pages · 211 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.

Statutory basis, cited on the form

Guidance and standards relied on

These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.

  • BS EN 13670:2009 (execution of concrete structures — precast bearings and grouting)
  • BS 5975-1:2024 (temporary works — erection stability and propping)
  • BS 8215:1991 (damp-proof courses)
  • BS 8000-0:2014 (workmanship — general principles)

What it is not

It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".

Format

AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.

This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.

More in Precast, timber frame and MMC quality checklists

3 documents

More for modern methods of construction.

4 rams · 4 quality inspection checklists · 3 permits to work · 2 site inspection records

Everything for modern methods of construction