Quality inspection checklists · Concrete & Formwork · Concrete and formwork quality checklists
KD-QA-CF-004
Curing and Protection — Quality Inspection Checklist
Cure method, duration and weather — the days after the pour that decide the strength · one sheet per pour
4 pages · 181 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- the delivery ticket)
- making and curing cubes)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS EN 13670:2009 (execution of concrete structures)
- BS 8500-1:2023 and BS 8500-2:2023 (specifying concrete
- BS EN 12350-2:2019 and BS EN 12390-2:2019 (slump test
- BS 8666:2020 (scheduling, dimensioning, cutting and bending of reinforcement)
- BS 7973-1:2001 and BS 7973-2:2001 (spacers and chairs)
- BS 5975-1:2024 and BS 5975-2:2024 (falsework — management and design)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Concrete and formwork quality checklists
5 documents
More for concrete & formwork.
6 rams · 7 quality inspection checklists · 3 permits to work · 5 topic rams