Commissioning Completion Certificate — Electrical Installation and Systems
The certificate that closes the electrical package at handover: the Electrical Installation Certificate and its schedules, the other electrical certificates the building needs, the labelling and identification checks, the outstanding items and the signatures of installer, contractor and client witness.
2 pages · 123 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 2 — click to enlarge
Read all 2 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- IET Guidance Note 3
- Electricity at Work Regulations 1989 reg 4(1)
- Building Regulations 2010
- G98
- IET Code of Practice for Electric Vehicle Charging Equipment Installation
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 7671:2018+A4:2026
- BS EN 62305-3:2011
- BS EN 62446-1:2016
- BS EN 50174-2:2018
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Handover and completion
11 documents