KD-RES-CR-005
Crane Operator and Tower Crane Cab Rescue Plan
The cab rescue plan for a tower crane, and the cab section for a mobile crane: the radio check that is the alarm, the climb by a team clipped to the mast fall-arrest system, the descent kit and the anchor the supplier identifies, the wind limit written in from the crane data, the hire company and the fire and rescue service told and not relied on, the people trained and practised on this kit.
2 pages · 93 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 2 — click to enlarge
Read all 2 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- LOLER 1998 reg 8
- Work at Height Regulations 2005 reg 4(2)
- MHSWR 1999 reg 8
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Rescue plans
5 documents