Bundles · Quality and handover
Handover and completion
From the contractor’s own completion walk to the certificate that closes the defects period — the handover set a client’s representative expects on the day.
Page one of the first three documents in the bundle. Blue helmet: usually visitors and technical staff. Helmet colours vary from site to site; this is a common convention, not a legal standard.
What is in it
12 documents in 1 section. Open a section, jump to one, or filter across all of them.
Jump to a section · 1
Handover and completion 12 documents
- KD-HO-PC-001 Practical Completion Inspection Checklist 2 pages · 125 guided fields
- KD-HO-HC-002 Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule 2 pages · 202 guided fields
- KD-HO-OM-003 O&M Manual Contents Schedule and Compilation Checklist 2 pages · 145 guided fields
- KD-HO-BU-004 Building User Guide 3 pages · 99 guided fields
- KD-HO-CE-005 Commissioning Completion Certificate — Electrical Installation and Systems 2 pages · 123 guided fields
- KD-HO-CM-006 Commissioning Completion Certificate — Mechanical and Water Systems 2 pages · 128 guided fields
- KD-HO-FS-007 Fire and Life-Safety Systems Handover Certificate 2 pages · 206 guided fields
- KD-HO-TR-008 Client Training and Demonstration Record 2 pages · 117 guided fields
- KD-HO-MR-009 Meter Readings, Utilities and Services Handover Record 2 pages · 164 guided fields
- KD-HO-WR-010 Warranty, Guarantee and Certificate Register 2 pages · 220 guided fields
- KD-HO-OW-011 Outstanding Works Schedule at Practical Completion 2 pages · 155 guided fields
- KD-HO-ED-012 End of Defects Period Inspection and Making-Good Certificate 2 pages · 171 guided fields