KD-BSA-CL-008
HRB Completion Checklist and Handover Receipt
The completion certificate application checklist: every item reg 40(1) and 40(2) requires with a status, a reference and an owner — then the reg 38 handover of the BFLO information and the specified golden thread information, the relevant person's notice acknowledging receipt, and the joint statement reg 40(1)(f) requires.
4 pages · 157 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 regs 31, 38, 40 and 44
- Regulatory Reform (Fire Safety) Order 2005 art 3
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Higher-risk buildings
7 documents