RAMS · Modern Methods of Construction
KD-RAMS-MC-003
Volumetric and Modular Installation
Reception and set-down, craning into position, stitching modules together, and connection of services between modules.
3 pages · 134 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- HSWA 1974 s.2(2)(a)
- MHSWR 1999 regs 3 and 5
- LOLER 1998 regs 8 and 9
- PUWER 1998
- Work at Height Regulations 2005
- Manual Handling Operations Regulations 1992
- COSHH 2002 (panel dusts, sealants and treatments)
- CDM 2015 regs 13 and 15
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 5975-1:2024 (temporary works management — erection stability and bracing sequence)
- BS 7121-1:2016 (craned panel and module lifts)
- HSE HSG168 (3rd edition, 2022) and the Joint Code of Practice, 10th edition (2022) incorporating Amendment 2 (2025) (fire during construction)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Modern Methods of Construction
3 documents
More for modern methods of construction.
4 rams · 4 quality inspection checklists · 3 permits to work · 2 site inspection records