KD-HM-SN-009
Snag List and Handover — Home Improvements
A free, complete end-of-job pack for home improvements (not new-build homes): what to look at room by room, a 30-line snag list (room, snag, photo, agreed fix date, fixed on, checked by you), and a handover checklist in the order a homeowner needs it — the final account, snags, site and keys; gas and electrical certificates; competent person scheme and building control certificates; the builder's guarantee, any insurance-backed guarantee and product guarantees; manuals and other documents. Says what signing means, to read any form the builder asks you to sign, and when the six-year time limit runs from.
4 pages · 269 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Statutory basis, cited on the form
- Consumer Rights Act 2015 ss.49 and 57
- Building Regulations 2010 regs 17 and 20
- Limitation Act 1980 s.5
What it is not
It is not legal advice, it is not insurance, and it cannot make a builder or a neighbour do anything. It explains what the law in England and Wales says and gives you a clear record. For free advice on your own situation, ring the Citizens Advice consumer helpline on 0808 223 1133.
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Homeowner toolkit
12 documents