Quality inspection checklists · Plastering & Drylining · Plastering and drylining quality checklists
KD-QA-DL-007
Skim and Float — Flatness — Quality Inspection Checklist
Gypsum skim to plasterboard and float-and-set to masonry · background, key, coats, thickness and NHBC 9.1 flatness.
4 pages · 188 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Approved Document B (fire safety), 2019 edition as amended
- Approved Document E (resistance to the passage of sound), 2003 edition as amended
- NHBC Standards 2024 Chapter 9.1 and 2023 Chapter 9.2
- Building Safety Act 2022 (golden thread)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 8212:1995 (dry lining and partitioning using gypsum plasterboard)
- BS 8000-8:1994 (workmanship — plasterboard partitions and dry linings)
- BS 8000-10:1995 (workmanship — plastering and rendering)
- BS EN 13914-2:2016 (internal plastering)
- BS EN 520:2004+A1:2009 (gypsum plasterboards — board types and marking)
- BS 5234-1:1992 and BS 5234-2:1992 (partitions — duty grades)
- BS EN 1364-1:2015 (fire resistance tests — walls)
- BS EN 1366-3:2021 and BS EN 1366-4:2021 (fire resistance tests — penetration seals and linear joint seals)
- BS 9999:2017 (fire safety in buildings — compartmentation)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Plastering and drylining quality checklists
7 documents
More for plastering & drylining.
5 rams · 12 quality inspection checklists · 1 permits to work · 2 site inspection records