RAMS · Doors, Shutters & Openings
KD-RAMS-DS-002
Automatic Door Installation and Commissioning
Header and drive, leaves, sensors, activation and manual release, through to the recorded force and sensor tests.
3 pages · 134 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- HSWA 1974 s.2(2)(a)
- MHSWR 1999 regs 3 and 5
- PUWER 1998 (the installed door as work equipment — guarding, controls and stopping)
- Work at Height Regulations 2005
- LOLER 1998 reg 8 (lifting curtains, barrels and leaves)
- Manual Handling Operations Regulations 1992
- COSHH 2002
- CDM 2015 regs 13 and 15
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Doors, Shutters & Openings
2 documents
More for doors, shutters & openings.
3 rams · 7 quality inspection checklists · 2 permits to work