KD-ITP-IN-021
Inspection and Test Plan — Insulation and Airtightness
The inspection and test plan for an insulation and airtightness package: materials, insulation continuity, vapour control, thermal bridging details, the air barrier line, penetrations, air test readiness and result, floating floors, absorbers and seals, sound test readiness and result, thermal imaging and the golden-thread record, with the intervention columns and the checklist each stage records on.
2 pages · 193 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 2 — click to enlarge
Read all 2 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- ISO 9001:2015 clauses 8.5.1, 8.6 and 8.7
- Building Regulations 2010 reg 7(1)
- ATTMA Technical Standard L1
- Approved Document L
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 8000-0:2014
- BS EN ISO 9972:2015
- BS EN ISO 16283
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Inspection and test plans
35 documents