KD-RAMS-PS-005
Dewatering and Groundwater Control
Well point systems, deep wells and sump pumping, including discharge routing, monitoring and settlement observation.
3 pages · 139 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- HSWA 1974 s.2(2)(a)
- MHSWR 1999 regs 3 and 5
- CDM 2015 reg 22(4) and reg 24 (excavation inspection and reports)
- reg 25(4)
- PUWER 1998
- LOLER 1998 regs 8 and 9
- Work at Height Regulations 2005
- Manual Handling Operations Regulations 1992
- COSHH 2002
- CDM 2015 regs 13 and 15
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Piling & Substructure
4 documents
More for piling & substructure.
5 rams · 5 quality inspection checklists · 4 permits to work · 2 site inspection records