Structural Protection and Propping in Place — Quality Inspection Checklist
Propping, needling and protection to the retained structure · erected to the design and loaded only on the permit · one sheet per propping scheme
4 pages · 189 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- CDM 2015 regs 20 and 25 (demolition arrangements in writing
- energy distribution installations)
- CAR 2012
- EPA 1990 s.34 (Environmental Protection Act 1990 — duty of care as respects waste)
- Hazardous Waste (England and Wales) Regulations 2005
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Demolition and strip-out quality checklists
3 documents
More for demolition & strip-out.
7 rams · 4 quality inspection checklists · 7 permits to work · 4 site inspection records · 5 topic rams