Bundles · Quality and handover
Higher-risk buildings
The records the higher-risk building procedure asks of the client, principal contractor and principal designer, from Gateway 2 to the completion application.
Page one of the first three documents in the bundle. Blue helmet: usually visitors and technical staff. Helmet colours vary from site to site; this is a common convention, not a legal standard.
What is in it
8 documents in 1 section. Open a section, jump to one, or filter across all of them.
Jump to a section · 1
Higher-risk buildings 8 documents
- KD-BSA-CC-001 HRB Change Control Log 3 pages · 289 guided fields
- KD-BSA-CA-002 HRB Change Assessment and Notification Record 4 pages · 137 guided fields
- KD-BSA-MS-003 HRB Occurrence Reporting System and Report Form 4 pages · 89 guided fields
- KD-BSA-MR-004 HRB Occurrence Log 3 pages · 365 guided fields
- KD-BSA-G2-005 HRB Construction Control Plan 4 pages · 128 guided fields
- KD-BSA-G2-006 HRB Competence Declaration and Change Control Plan 4 pages · 98 guided fields
- KD-BSA-G3-007 HRB Completion Declarations and Notice 3 pages · 62 guided fields
- KD-BSA-CL-008 HRB Completion Checklist and Handover Receipt 4 pages · 157 guided fields