Permits to work · Extended permits · used by 3 trades
KD-PTW-FI-023
Fire Alarm and Detection Isolation Permit
Isolating detectors, zones or a panel for hot, dusty or ceiling works — the interim precautions, the time limit, the restoration test; healthcare variant noted.
3 pages · 76 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Regulatory Reform (Fire Safety) Order 2005 arts 13 and 17
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Extended permits
11 documents
More permits to work.
This document is used by 3 trades: Electrical, Fire Protection, Site Management & Quality System.