Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist

The gate before any commissioning starts · every system installed, tested and cleaned with the certificate references, permanent power and water on, the building closed up, the programme, the instruments and the people in place.

4 pages · 194 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.

Statutory basis, cited on the form

Guidance and standards relied on

These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.

  • BS EN 12599:2012 (ventilation for buildings — test procedures and measurement methods for handing over)
  • BS 5839-1:2025 (fire detection and fire alarm systems for buildings — non-domestic premises)
  • BS 7273-4:2015 (actuation of release mechanisms for doors)
  • BS 7346-8:2013 (components for smoke control systems — code of practice)
  • BS 5266-1:2016 (emergency lighting — code of practice for the emergency lighting of premises)
  • BS 7671:2018+A4:2026 (IET Wiring Regulations, 18th edition, Amendment 4)

What it is not

It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".

Format

AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.

This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.

More in Commissioning records

2 documents

More quality inspection checklists.

This document is used by 3 trades: Electrical, Mechanical, Plumbing & HVAC, Site Management & Quality System.

All quality inspection checklists