Quality inspection checklists · Site Management & Quality System · Close-out records
KD-QA-CO-002
Sound Test Readiness and Result — Record
Before the sound test — separating walls and floors complete with their finishes and flanking details · tests by a registered tester on the room pairs the regime requires, results against the performance standard, remedial and retest.
4 pages · 186 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Approved Document E — Building Regulations 2010 (resistance to the passage of sound — pre-completion testing)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS EN ISO 16283-1 and BS EN ISO 16283-2 (field measurement of airborne and impact sound insulation)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Close-out records
7 documents
More for site management & quality system.
23 quality inspection checklists · 32 permits to work · 19 site inspection records