The complete library · CDM 2015 documents
KD-CDM-DR-013
Design Risk Register
The designer's design risk register: each element and hazard, who is at risk, how the design eliminated, reduced or controlled it, why further reduction was not reasonably practicable, the residual risk, the information passed to the principal designer, contractors and the health and safety file, and its status.
3 pages · 267 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- CDM 2015 reg 9(2) and (3)
- MHSWR 1999 Schedule 1
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in CDM 2015 documents
14 documents