Quality inspection checklists · Cladding & Facades · Cladding and façades quality checklists
KD-QA-CL-007
Unitised Curtain Walling — Units, Hooking-On, Stack Joints and Closure — Quality Inspection Checklist
Factory-made units hung on surveyed brackets, stack and vertical joints closed with the system's gaskets and splices, every unit's serial and condition recorded · one sheet per elevation or floor
5 pages · 222 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 5 — click to enlarge
Read all 5 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- CWCT Standard for systemised building envelopes (2006) and Standard test methods for building envelopes (2005)
- Building Regulations 2010 reg 7(2) (combustible materials in external walls)
- Approved Document B (2019 edition as amended)
- HRB Procedures Regulations 2023 (Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 regs 18–26 — change control)
- NHBC Standards 2024 Chapters 4 to 7 (6.9 curtain walling and cladding)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 8539:2012 (post-installed anchors)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Cladding and façades quality checklists
8 documents
More for cladding & facades.
5 rams · 9 quality inspection checklists · 3 permits to work · 2 site inspection records · 5 topic rams