Quality inspection checklists · Insulation · Insulation and airtightness quality checklists
KD-QA-IN-001
Thermal Insulation — Continuity — Quality Inspection Checklist
Insulation to walls, floors, roofs and services zones · type, thickness, continuity at junctions, fixings, vapour control layer · hold before closing.
4 pages · 194 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Approved Document L (conservation of fuel and power), 2021 edition as amended
- Approved Document E (resistance to the passage of sound), 2003 edition as amended
- Approved Document B (fire safety), 2019 edition as amended
- NHBC Standards 2024 Chapter 9.1 and 2023 Chapter 9.2
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 5250:2021 (management of moisture in buildings)
- BS EN ISO 9972:2015 (air permeability of buildings — fan pressurisation method)
- BS EN ISO 16283-1:2014 and BS EN ISO 16283-2:2020 (field measurement of airborne and impact sound insulation)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Insulation and airtightness quality checklists
2 documents
More for insulation.
5 rams · 3 quality inspection checklists · 1 permits to work