Topic RAMS · Flooring & Tiling · Flooring & Tiling topic
KD-RA-FO-003
Uplift of Old Floor Tiles and Bitumen Adhesive
Obtaining and checking the asbestos information for the floors, the hold point before uplift, uplift of coverings and removal of adhesive once confirmed…
4 pages · 149 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- HSWA 1974 s.2(2)(a)
- MHSWR 1999 regs 3 and 5
- CAR 2012
- COSHH 2002
- DSEAR 2002 (flammable adhesive removers)
- PUWER 1998
- Hazardous Waste (England and Wales) Regulations 2005
- Environmental Protection Act 1990 s.34
- CDM 2015 regs 13 and 15
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Flooring & Tiling topic
4 documents
More for flooring & tiling.
5 rams · 10 quality inspection checklists · 1 permits to work · 2 site inspection records · 5 topic rams