The full manual handling risk assessment for one site handling operation — plasterboard, blocks, kerbs, drums, glazing units, doors, pipe, cable drums — in the reg 4 order: mechanical aids considered and why any was rejected, HSE's lifting, carrying and pushing and pulling filters as a first sort (not safe limits) with the triggers for a detailed assessment, the Schedule 1 factors as the assessment sections with a 5×5 rating, team lifts, an attached MAC or RAPP score and its limits, the controls, the weight and heaviest-side information and training given, actions, review triggers and the briefing record.
6 pages · 232 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 6 — click to enlarge
Read all 6 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Manual Handling Operations Regulations 1992 regs 2, 4 and 5 and Schedule 1
- MHSWR 1999 reg 3
- HSWA 1974 s.2
- L23 (Fourth edition, 2016)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- HSE INDG143 (rev4, 2020)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.