HRB Change Control Log
The change control log the principal contractor must keep on higher-risk building work: one line per controlled change carrying every particular reg 19(2) requires — who recorded it, the change, the reasons, the classification, the advice sought, the agreed documents revised and the compliance explanation — with the submission, the outcome and the golden thread copy.
3 pages · 289 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 regs 18, 19, 26, 27, 29 and 31
- Building Regulations 2010 Part 2A
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.