RAMS · Carpentry & Joinery

KD-RAMS-CJ-001

First-Fix Carpentry

Timber studwork, floor joisting and coverings, cut roof carpentry to the engineer's design, strutting, noggins and sheathing, including temporary works interfaces.

3 pages · 143 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.

Permits this work normally needs

The RAMS answers how the work is done safely; the permit authorises it in that place, on that day. This document cross-references:

Statutory basis, cited on the form

Guidance and standards relied on

These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.

  • EH40/2005 (2020) workplace exposure limits — hardwood dust a carcinogen
  • BS 5975-1:2024 (temporary works — roof bracing until the structure is stable)

What it is not

It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".

Format

AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.

This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.