Bundles · Health and safety
Fire safety on site
The construction phase fire risk assessment, the fire plan, the fire marshal appointment, the hot works register and the checklists an insurer's Joint Code expects to see on site.
Page one of the first three documents in the bundle. Green helmet: usually safety advisers and new starters. Helmet colours vary from site to site; this is a common convention, not a legal standard.
What is in it
10 documents in 1 section. Open a section, jump to one, or filter across all of them.
Jump to a section · 1
Fire safety on site 10 documents
- KD-FIRE-RA-001 Construction Phase Fire Risk Assessment 3 pages · 243 guided fields
- KD-FIRE-FP-002 Construction Phase Fire Plan 3 pages · 134 guided fields
- KD-FIRE-FM-003 Fire Marshal Appointment and Duties 1 page · 32 guided fields
- KD-FIRE-HR-004 Hot Works Register 2 pages · 140 guided fields
- KD-FIRE-ER-005 Fire Point and Escape Route Inspection Checklist 2 pages · 82 guided fields
- KD-FIRE-AR-006 Arson and Security Risk Checklist 2 pages · 73 guided fields
- KD-FIRE-TA-007 Temporary Accommodation Fire Checklist 2 pages · 59 guided fields
- KD-FIRE-TF-008 Timber Frame and Combustible Structure Fire Control Sheet 2 pages · 103 guided fields
- KD-FIRE-PF-009 Premises Fire Risk Assessment 4 pages · 310 guided fields
- KD-FIRE-DS-010 DSEAR Assessment — Flammable Substances 5 pages · 344 guided fields