KD-RAMS-DL-001
Metal Stud Partitions and Wall Linings
Setting out, fixing track and stud, first and second side boarding, insulation, pattresses and openings, including acoustic and fire-rated systems installed…
3 pages · 144 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 3 — click to enlarge
Read all 3 pages first — watermarked sample, no email Before you submit: the checklist
Permits this work normally needs
The RAMS answers how the work is done safely; the permit authorises it in that place, on that day. This document cross-references:
Statutory basis, cited on the form
- HSWA 1974 s.2(2)(a)
- MHSWR 1999 regs 3 and 5
- Manual Handling Operations Regulations 1992
- COSHH 2002 (plaster, cement and dust exposure)
- Work at Height Regulations 2005
- PUWER 1998
- CDM 2015 regs 13 and 15
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Plastering & Drylining
4 documents
More for plastering & drylining.
5 rams · 12 quality inspection checklists · 1 permits to work · 2 site inspection records