Quality inspection checklists · Site Management & Quality System · Close-out records
KD-QA-CO-001
Air-Tightness Test Readiness and Result — Record
Before the air test — envelope complete, every penetration sealed, temporary seals listed · the test by a registered tester, the result against the design figure, remedial and retest.
4 pages · 190 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Approved Document L — Building Regulations 2010 (conservation of fuel and power — air permeability testing)
- ATTMA Technical Standard L1 (measuring the air permeability of building envelopes)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS EN ISO 9972:2015 (determination of air permeability of buildings — fan pressurisation method)
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Close-out records
7 documents
More for site management & quality system.
23 quality inspection checklists · 32 permits to work · 19 site inspection records