Quality inspection checklists · Cladding & Facades · Cladding and façades quality checklists

KD-QA-CL-008

SFS Infill Walls and Sheathing Board — Frame, Fixings and Sheathing Before the Membrane — Quality Inspection Checklist

Light-gauge steel infill walls between floors · head and base tracks fixed to the engineer's detail, studs at centres, deflection head, sheathing board closed as the tested build-up before the breather membrane · one sheet per elevation or floor

4 pages · 207 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.

Statutory basis, cited on the form

Guidance and standards relied on

These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.

  • BS 8539:2012 (post-installed anchors)

What it is not

It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".

Format

AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.

This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.

More in Cladding and façades quality checklists

8 documents

Everything for cladding & facades