The bundles

One complete system per hazard.

1095 documents · 151,706 guided fields across the range. Approved for issue by the author and on sale; not independently reviewed, and every document says so.

Sorted by the helmet colour of the people who usually need them. Helmet colours vary from site to site. This is a common convention, not a legal standard.

£499+ VAT

40 bundles below, plus the complete library above

£129+ VAT Permit to Work Suite The complete permit-to-work system — 10 core permits plus registers, appointments, isolation and audit. A process, not a pile of forms. Includes: Core permits, Electrical safety documents, Registers and system documents, Appointments, competence and audit, Extended permits 33 documents plus the user manual · 2,873 guided fields £399+ VAT RAMS Risk assessments & method statements — the everyday site submission, structured and referenced. Every trade that appears on a building, from the first dig to handover. Includes: Electrical trade RAMS, Plastering & Drylining RAMS, Carpentry & Joinery RAMS, Demolition & Strip-Out RAMS, Mechanical, Plumbing & HVAC RAMS… 220 documents · 28,962 guided fields £149+ VAT New build housing — the complete set Every document in the eleven housing packs, from opening the site up to handing the plot over — assembled for plot-based new build work. Includes: External Works & Landscaping RAMS, Site Logistics & Cleaning RAMS, Electrical trade RAMS, Plant & Lifting RAMS, Groundworks & Civils RAMS… 58 documents · 7,611 guided fields £299+ VAT Quality inspection Inspection checklists and the quality system around them — hold points where work gets covered up, benchmarks, non-conformances, photo evidence. One sheet per area, ticked as you walk. Includes: Quality system documents, Decoration quality checklists, Passive fire protection quality checklists, Damp and preservation quality checklists, Concrete cutting and repair quality checklists… 265 documents · 53,822 guided fields £69+ VAT Site inspection records The inspection records the law says a site must keep — scaffolds every seven days, excavations every shift, lifting equipment, plant, harnesses, ladders, temporary electrics, fire, the weekly walk-round — each with its legal driver printed on the form. Includes: Site inspection records 41 documents · 4,493 guided fields £29+ VAT COSHH assessments Forty-eight guided substance assessments — silica, wood dust, cement, epoxies, isocyanates, solvents, welding fume, lead, asbestos, resins, refrigerants, legionella and the rest of what a site actually breathes and touches. Includes: COSHH substance assessments 48 documents · 1,200 guided fields £59+ VAT Site forms Thirty-five site forms and registers — the signing-in sheet, the visitor book, the RAMS review, the diary, deliveries, plant, temporary works, isolations, the accident book, near misses, meetings and the close-out — the site file a main contractor actually runs on. Includes: Site forms 35 documents · 3,806 guided fields £79+ VAT Safe systems of work Twenty one-page safe systems of work for the jobs a sole trader or small firm gets asked for "a method statement" on — kitchens, bathrooms, flooring, windows, consumer units, patios, fences. Includes: Safe systems of work 20 documents · 847 guided fields £39+ VAT Fire safety on site The construction phase fire risk assessment, the fire plan, the fire marshal appointment, the hot works register and the checklists an insurer's Joint Code expects to see on site. Includes: Fire safety on site 10 documents · 1,520 guided fields £39+ VAT Temporary works The temporary works documents BS 5975-1:2024 expects a contractor to hold — appointments, the design brief, category assessment, design check certificate, inspection before loading, change control and the strike release. Includes: Temporary works 7 documents · 408 guided fields £39+ VAT Lifting operations The lift plan behind the lifting permit — crane lifts and repetitive lifts, the appointed person and slinger-signaller appointments, crane set-up and ground checks, accessory pre-use checks, the exclusion zone and the hook-time log. Includes: Lifting operations 7 documents · 812 guided fields £29+ VAT Traffic management and the public The site traffic management plan CDM 2015 regulation 27 requires, with the delivery management plan, the banksman appointment, segregation checks, the public interface plan and the reversing controls. Includes: Traffic management 6 documents · 538 guided fields £39+ VAT Environmental management The site waste management plan, the environmental risk register, the dust and noise management plan, water pollution prevention, ecology and tree protection, the spill drill and the environmental incident report — the plans a planning condition and a client's consultant ask for. Includes: Environmental management 7 documents · 1,180 guided fields £49+ VAT Occupational health The occupational health system a small contractor is asked to show — the surveillance register, HAVS and noise assessments, the RPE face-fit register, skin checks, the drug and alcohol policy and testing record, lone working, work-related stress, manual handling and legionella risk assessments, and the referral record. Includes: Occupational health 11 documents · 2,032 guided fields £129+ VAT Health and safety arrangements The written health and safety arrangements a CHAS, SafeContractor, Constructionline or SMAS assessment asks for, one per topic, each pointing to the records that evidence it. Includes: Health and safety arrangements 22 documents · 970 guided fields £149+ VAT Inspection and test plans The ITP for every trade package — the plan of hold points, witness points and records that the quality checklists are the evidence for. Includes: Inspection and test plans 36 documents · 7,388 guided fields £69+ VAT Handover and completion From the contractor’s own completion walk to the certificate that closes the defects period — the handover set a client’s representative expects on the day. Includes: Handover and completion 12 documents · 1,855 guided fields £39+ VAT Rescue plans Planning for emergencies is a duty before the work starts, not a call to 999 afterwards — the six plans a site is asked to show. Includes: Rescue plans 6 documents · 554 guided fields £25+ VAT Point-of-work risk assessment The RAMS is the plan. The POWRA is the check that the plan matches the workface today — six one-page sheets for the phone or the clipboard. Includes: Point-of-work risk assessment 6 documents · 445 guided fields £39+ VAT Asbestos management The dutyholder’s asbestos documents under the Control of Asbestos Regulations 2012 — register, plan, survey brief, NNLW decision, records, handover. Includes: Asbestos management 6 documents · 802 guided fields £29+ VAT Site notices and boards The notices a site displays — large type, the names and numbers filled in, printed and laminated on the day. They supplement the prescribed safety signs and never replace them. Includes: Site notices and boards 14 documents · 435 guided fields £39+ VAT Plant daily checks The pre-use check the operator actually makes, one sheet per machine type for the week, and the records that sit behind it. Includes: Plant daily checks 10 documents · 875 guided fields £129+ VAT Healthcare estates The estates control documents a contractor meets on an NHS site — the permits, authorisations and assessments the Health Technical Memoranda expect, written for the contractor’s side. Includes: Healthcare estates 8 documents · 754 guided fields £39+ VAT Subcontractor management How a principal contractor checks a subcontractor before the order and manages them after it — the six office documents behind the site forms. Includes: Subcontractor management 6 documents · 1,028 guided fields £199+ VAT Topic RAMS Narrow RAMS for one task or hazard at a time — the risks a trade RAMS only touches on, each with its own hazards, controls and sequence of work. Includes: Bricklaying & Masonry topic RAMS, Carpentry & Joinery topic RAMS, Cladding & Facades topic RAMS, Concrete & Formwork topic RAMS, Demolition & Strip-Out topic RAMS… 84 documents · 12,059 guided fields £49+ VAT Payment notices The Construction Act notices and trackers for getting paid and paying on time — each one says what it does, when it is due, and where your contract changes the answer. Includes: Payment notices 8 documents · 1,093 guided fields £19+ VAT CIS records The contractor’s side of the Construction Industry Scheme on paper — who was verified, what was paid and deducted, and the statement each subcontractor is owed. Includes: CIS records 3 documents · 696 guided fields £59+ VAT Contract administration The registers, forms and notices the commercial side of a job runs on — variations, daywork, delay, loss and expense, RFIs, the contract summary and the final account. Includes: Contract administration 9 documents · 1,778 guided fields £29+ VAT Building Regulations dutyholders The Building Regulations Part 2A paperwork for work that is not higher-risk — appointments, competence, and the signed statements that go with the completion notice. Includes: Building Regulations dutyholders 6 documents · 496 guided fields £99+ VAT Higher-risk buildings The records the higher-risk building procedure asks of the client, principal contractor and principal designer, from Gateway 2 to the completion application. Includes: Higher-risk buildings 8 documents · 1,325 guided fields £39+ VAT Employer records The records every construction employer keeps and most small firms do not — right to work, holiday, working time, new and expectant mothers, young people and screen users. Includes: Employer records 6 documents · 1,066 guided fields £9+ VAT Blank forms Guided blank forms for the job no pre-written RAMS covers — risk assessment with a 5×5 matrix, method statement, small-job RAMS and COSHH. Includes: Blank forms 5 documents · 552 guided fields £99+ VAT Company policies The company policies pre-qualification asks for beyond health and safety, written to be kept rather than filed — and the index that keeps them current. Includes: Company policies 19 documents · 2,408 guided fields £39+ VAT Health and safety audits Scored audits that go further than the weekly inspection, with critical items that fail an audit whatever the score. Includes: Health and safety audits 3 documents · 687 guided fields £49+ VAT CAS evidence records The records behind a Common Assessment Standard submission — the question-by-question evidence map, the renewal calendar, and the records assessors most often find missing. Includes: CAS evidence records 10 documents · 4,234 guided fields £19+ VAT Trade admin The paperwork that goes to the customer, from the first price to the guarantee — quotation, invoice, variation quotation, daywork sheet, pay less notice, completion certificate and workmanship guarantee. Includes: Trade admin, Contract administration, Payment notices 7 documents · 877 guided fields £29+ VAT Building contracts Plain-English contracts for small building work — a homeowner contract with its cancellation form, a small works contract for a business client, and a subcontract agreement. Includes: Building contracts 3 documents · 420 guided fields £22.80inc VAT Homeowner toolkit The homeowner's side of a building job, from the first brief to the letters for when something goes wrong — written for homeowners in England and Wales. Includes: Homeowner toolkit 10 documents · 2,255 guided fields £19+ VAT Toolbox talks Sixty talks written to be spoken — height, dust, noise, plant, fire, asbestos awareness, mental health, near misses — each with the questions that make it a conversation and the record that it happened. Includes: Toolbox talks 60 documents · 2,460 guided fields £89+ VAT CDM 2015 The CDM 2015 paperwork for both sides of the appointment — the construction phase plan and its small-works edition, pre-construction information, the health and safety file, and the duty-holder records in one bundle. Includes: CDM 2015 documents 15 documents · 1,177 guided fields
For health and safety advisers · a licence, not a bundle

Consultant licence — twelve months, multiple clients

Every document in the library, licensed for twelve months to a health and safety adviser or consultancy to adapt and issue for the clients it acts for — the one licence on the site that is not one business, one purchase.

See what the licence covers
£899+ VAT

One payment. Every future revision free.

  1. 1

    Choose a bundle or a document

    A complete system for the hazard you're working, or a single document — search the range.

  2. 2

    Adapt it to your site

    Guided fillable PDFs; your competent person scores the risks and signs it off.

  3. 3

    Keep it, updated

    When the law changes and we revise, your documents update at no charge.