KD-ITP-SC-032
Inspection and Test Plan — Screed
The inspection and test plan for a screed package: substrate, DPM, insulation and edge strip, underfloor heating pipes and pressure test, datums and thickness, materials and mix, the pour and curing, drying conditions, the relative humidity test, first heating, flatness, levelling compounds and release for the finish, with the intervention columns and the checklist each stage records on.
2 pages · 182 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 2 — click to enlarge
Read all 2 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- ISO 9001:2015 clauses 8.5.1, 8.6 and 8.7
- Building Regulations 2010 reg 7(1)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 8000-0:2014
- BS 8204
- BS EN 1264-4:2021
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Inspection and test plans
35 documents