KD-BSA-G2-006
HRB Competence Declaration and Change Control Plan
The client's competence declaration for the principal designer, the principal contractor and every other person appointed, with the statements Schedule 1 paragraph 1 prescribes — and the change control plan setting out how changes are identified, assessed, decided, recorded, notified and the plan kept under review.
4 pages · 98 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 4 — click to enlarge
Read all 4 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 Schedule 1 paras 1 and 3 and regs 18 and 19
- Building Regulations 2010 regs 11D to 11H
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.
More in Higher-risk buildings
7 documents