KD-ITP-SF-034
Inspection and Test Plan — Steel Fixing
The inspection and test plan for a steel-fixing package: bending schedule and drawings current, delivery against the schedule, storage, fixing to the drawing, cover by spacers and chairs, laps and anchorages, couplers, starters and cast-ins, stability, cleanliness and release, and the post-pour cover check, with the intervention columns and the checklist each stage records on.
2 pages · 171 fillable fields · works in Adobe Reader, Preview, Chrome, or on a phone — or complete it online in your browser and download the finished document.
Page 1 of 2 — click to enlarge
Read all 2 pages first — watermarked sample, no email Before you submit: the checklist
Statutory basis, cited on the form
- ISO 9001:2015 clauses 8.5.1, 8.6 and 8.7
- Building Regulations 2010 reg 7(1)
Guidance and standards relied on
These are not law. HSE guidance carries no statutory force in itself, British Standards and NASC technical guidance are industry documents, and the Joint Code of Practice is an insurers' code. They are what the document is built to — and where a court would look for the standard of the reasonable contractor.
- BS 8000-0:2014
- BS 8666:2020
- BS 7973-1:2001 and BS 7973-2:2001
- BS EN 13670:2009
What it is not
It is not a completed document and it is not health and safety advice. You must adapt it to your site and have a competent person complete and sign it off. See why we don't say "compliant".
Format
AcroForm fillable PDF. Every field has a tooltip. Tab order follows the reading order. Works on desktop and mobile, in Adobe and non-Adobe readers.
This revision was prepared against legislation current at 10 August 2026. Revision A0. Check kubitdocs.com/revisions for the current revision before use.