Provisions the documents cite: regs 3, 5 (incl. 5(2)); regs 3(3) and 3(4) (review; young persons), 6 (health surveillance), 7 (competent assistance), 8 (serious and imminent danger), 13 (capabilities and training), 16 to 19 (new and expectant mothers; young persons)
What it requires
reg 3 — assess the risk. reg 5 — plan, organise, control, monitor and review the arrangements; record them with five or more employees. reg 5(2) is one root of the written lift plan.
The instrument itself: https://www.legislation.gov.uk/uksi/1999/3242. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: cited from the primary source.
- Watched by: legislation.gov.uk Changes to Legislation tab.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 391 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Arboriculture & Tree Work RAMS
- Chipping and Processing Arisings
- Climbing Operations and Sectional Dismantling
- Stump Grinding
- Tree Felling — Ground-Based
- Tree Work from MEWPs
Asbestos — Non-Licensed Work RAMS
- Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation
- Removal of Asbestos Cement Products
- Removal of Textured Coatings and Floor Tiles
Blank forms
- 5×5 Risk Matrix and Scoring Guide
- Method Statement — Blank
- RAMS — Blank Combined for Small Jobs
- Risk Assessment — Blank with 5×5 Matrix
Bricklaying & Masonry RAMS
- Alterations and Toothing into Existing Structures
- Blockwork and Brickwork — New Build
- Lintel and Padstone Installation
- Repointing and Brick Repairs
- Stone Masonry Fixing
Bricklaying & Masonry topic RAMS
- Bricklaying in Cold, Wet and Hot Weather
- Mortar Mixing — Cement, Lime and Admixtures
- Strain from Repetitive Brick and Block Laying
- Using Working Platforms for Bricklaying
- Wind Stability of New and Free-Standing Masonry
CAS evidence records
- Annual Management Review
- Competence Management Procedure and TNA
- Competent Adviser Appointment and Advice Log
- Legal and Technical Updates Register
CDM 2015 documents
Carpentry & Joinery RAMS
- Fire Door Installation and Remediation
- First-Fix Carpentry
- Kitchen and Fitted-Furniture Installation
- Second-Fix Joinery
- Timber Floor Laying and Sanding
- Trussed Rafter and Roof Structure Erection
Carpentry & Joinery topic RAMS
- Circular Saws — Guards, Blades and Kickback
- Hardwood and Sensitising Timber Dust Exposure
- Kneeling and Overhead Fixing in Joinery
- Pneumatic and Powder-Actuated Fastening Tools
- Working Preservative-Treated Timber
Cladding & Facades RAMS
- Curtain Walling
- Facade Cleaning and Spray-Applied Coatings
- Rainscreen and Panel Cladding Installation
- Remedial Cladding Replacement
- Render and External Wall Insulation Systems
Cladding & Facades topic RAMS
- Cutting Out Failed Facade Movement-Joint Sealants
- Facade Bracket Anchors and Proof Testing
- Mast Climbing Work Platforms — Facade Use
- Site Water Testing of Facades and Windows
- Temporary Weather Protection of Facades
Company policies
Concrete & Formwork RAMS
- Beam and Block and Precast Concrete Flooring
- Formwork Erection and Striking
- In-Situ Concrete Pours
- Power Floating and Surface Finishing
- Reinforcement Fixing
- Screeding
Concrete & Formwork topic RAMS
- Concrete Pump Set-Up and Boom Placement
- Concrete Sampling and Cube Making
- Falsework Monitoring During the Pour
- Projecting Reinforcement — Impalement Protection
- Thermal Protection of Pours
Concrete Cutting, Drilling & Repair RAMS
Core permits
Damp, Timber & Preservation RAMS
Data Cabling & Telecoms RAMS
- Comms Room and Cabinet Build
- Containment and Cable Basket Installation
- External Ducts and Chamber Works
- Optical Fibre Works
- Structured Cabling Installation and Termination
Demolition & Strip-Out RAMS
- Asbestos Interface — Stop-Work and Discovery
- Concrete Breaking, Bursting and Crushing
- Cutting and Removal of Structural Openings
- Hand Demolition and Hard Strip
- Soft Strip of Internal Finishes and Fittings
- Structural Demolition — Machine
- Temporary Works Interface During Demolition
Demolition & Strip-Out topic RAMS
- Demolition Dust Suppression and Monitoring
- Demolition Next to Retained Structures
- Hand Dismantling of Pitched Timber Roofs
- Loading Out Demolition Waste
- Pre-Demolition Hazardous Strip
Doors, Shutters & Openings RAMS
- Automatic Door Installation and Commissioning
- Blind, Louvre and Solar Shading Installation
- Industrial Door and Shutter Installation
Electrical topic RAMS
- Arc Flash — Switching Energised LV Switchgear
- First Energisation and Live-Status Control
- Heavy Cable Pulling — Winched and Riser Pulls
- Work On or Near Live Low-Voltage Conductors
Employer and policy documents
Employer records
Extended permits
- Asbestos Disturbance Area Permit
- Out-of-Hours and Lone Working Authorisation
- Work Over or Near Water Permit
External Works & Landscaping RAMS
- Car Park Surfacing and Line Marking
- Fencing and Hoarding Erection
- Soft Landscaping and Planting
- Street Furniture and Signage Installation
- Tree Works Interface
External Works & Landscaping topic RAMS
- Compactor and Breaker Noise and Vibration
- Night Working and Lighting Towers
- Soakaways and Infiltration Crates
- Topsoil and Subsoil Handling
- Work Within Root Protection Areas
Fire Protection RAMS
- Dry and Wet Riser Work
- Fire Barrier Installation — Cavities and Voids
- Fire Door Remediation — Specialist
- Fire-Stopping and Penetration Sealing
- Sprinkler and Suppression Installation
Fire Protection topic RAMS
- Air-Leakage Testing — Fan Pressurisation
- Fire-Stopping Inspection — Risers and Voids
- Fire-Stopping Products — Fume and Skin Exposure
- Opening Up Fire-Stopping for Inspection
- Plural-Component Spraying of Fire Coatings
Fire safety on site
Fitted Furniture & Equipment RAMS
- Commercial Kitchen Equipment Installation
- Kitchen and Bathroom Installation
- Storage, Shelving and Racking Installation
- Worktop Templating and Installation
Flooring & Tiling RAMS
- Carpet and Carpet Tiles
- Raised Access Floors
- Resin and Self-Levelling Floors
- Sheet Vinyl and Safety Flooring
- Wall and Floor Tiling
Flooring & Tiling topic RAMS
- Anti-Slip Treatment of Hard Floors
- MMA Resin Flooring — Vapour and Odour Control
- Mixing Cementitious and Epoxy Adhesives and Grouts
- Substrate Moisture Testing and Surface DPMs
- Uplift of Old Floor Tiles and Bitumen Adhesive
Gas Installation RAMS
- Commercial Gas — Strength and Tightness Testing and Purging
- Gas Appliance Installation and Commissioning
- Gas Pipework Installation and Alteration
Glazing & Windows RAMS
- Emergency Glazing and Boarding
- Film Application and Manifestations
- Internal Glazed Partitions
- New Build Window and External Door Installation
- Structural and Overhead Glazing
- Window and Door Replacement
Glazing & Windows topic RAMS
- Fixing Window Frames — Anchors and Restraint
- Glazing Sealants, Primers and Solvent Cleaners
- High-Rise Glazing Repairs by Rope Access
- Planned Removal of Broken Glass and Glass Waste
- Toughened and Laminated Glass Handling
Groundworks & Civils RAMS
- Compaction, Hardcore and Sub-Bases
- Drainage Installation and Connections
- Excavation and Trenching
- Foundations and Pile Caps
- Kerbing, Paving and Slabbing
- Reduced-Dig and Contaminated Ground
- Service Trenches and Ducting
- Work Over or Near Water
Groundworks & Civils topic RAMS
- Confined Space Entry — Manholes and Ducts
- High-Pressure Water Jetting and Hydrodemolition
- Pumping Out Flooded Excavations and Basements
- Trial Pits and Plate Bearing Tests
- Underground Fuel Tank Removal
Health and safety arrangements
- Accident, Incident and RIDDOR Reporting Arrangements
- Asbestos Arrangements
- CDM Dutyholder Arrangements
- COSHH and Hazardous Substances Arrangements
- Health and Safety Policy Review and Objectives Record
- Health and Safety Responsibilities and Organisation
- Manual Handling Arrangements
- Monitoring, Inspection and Audit Arrangements
- Occupational Health and Health Surveillance Arrangements
- Plant and Work Equipment Arrangements — PUWER and LOLER
- Risk Assessment and Method Statement Arrangements
- Subcontractor Selection and Control Arrangements
- Training, Competence and Induction Arrangements
- Work at Height Arrangements
- Young, New and Expectant Workers Arrangements
Health and safety audits
- Audit Programme and Results Summary
- Company Health and Safety Management Audit
- Site Health and Safety Audit — Scored
Healthcare estates
- Authorised Person and Competent Person Appointment Record
- Critical Ventilation Isolation and Reinstatement Record
- Infection Control Risk Assessment and Permit
- Medical Gas Pipeline Systems Permit to Work
Insulation RAMS
- Cold and Warm Roof Insulation
- External Wall Insulation
- Internal Wall Insulation
- Loft and Roof Void Insulation
- Thermal Insulation to Pipework and Ductwork
Kitchen & Bathroom Installation RAMS
- Bathroom Installation — Sanitaryware and Wet Areas
- Bathroom Strip-Out and Removal
- Kitchen Installation — Units, Worktops and Appliances
- Kitchen Strip-Out and Removal
- Worktop Templating and Stone Fitting
Lead Paint RAMS
Lifting operations
Lifts & Vertical Transport RAMS
- Construction Hoist Erection and Dismantling
- Passenger and Goods Lift Installation
- Platform and Home Lift Installation
Lightning Protection & Signage RAMS
- Lightning Protection Installation and Testing
- Sign Installation — Illuminated
- Sign Installation — Non-Illuminated
Mechanical, Plumbing & HVAC RAMS
- Air Source Heat Pump Installation
- Ductwork Installation
- Gas Pipework Interface
- Mechanical Commissioning and Balancing
- Mechanical Ventilation with Heat Recovery — Dwellings
- Pipework Installation — Heating and Domestic
- Plant and Equipment Installation — Plant Rooms
- Pressure Testing and Flushing
- Refrigerant Systems
- Sanitaryware and Fixtures Installation
- Soldered and Brazed Pipework
- Underfloor Heating Installation
Mechanical, Plumbing & HVAC topic RAMS
- Hand-Arm Vibration — Drilling and Cutting
- Heavy Pipework Supports, Anchors and Bellows
- Legionella Control from First Fill to Handover
- Pressure Vessel Isolation and Depressurisation
- Refrigerant Recovery, Evacuation and Charging
Medical Gas Pipeline Systems RAMS
- Medical Gas Pipeline Installation and Alteration
- Medical Gas Works in Occupied Clinical Areas — Interface and Isolation
Modern Methods of Construction RAMS
- Light Steel Frame Erection
- Structural Insulated Panels and Cassettes
- Timber Frame Erection
- Volumetric and Modular Installation
Occupational health
- Drug and Alcohol Policy Statement and Testing Record
- HAVS Risk Assessment by Tool and Task
- Health Surveillance Register and Programme
- Legionella Risk Assessment — Water Systems
- Lone Working Risk Assessment
- Manual Handling Risk Assessment
- Noise Risk Assessment by Activity
- Occupational Health Referral and Fitness Certificate Record
- Work-Related Stress Risk Assessment
Painting & Decorating RAMS
- External Decoration at Height
- Internal Decoration — New Surfaces
- Intumescent Coating Application
- Redecoration of Existing Surfaces
- Solvent-Based Finishes to Joinery
- Spray Application — Internal
Painting & Decorating topic RAMS
- Chemical Paint Stripping
- Overcoating Sound Lead Paint
- Rope Access Painting and Coating
- Spray Painting — Respiratory Protection
- Two-Pack Epoxy and Polyurethane Coatings
Partitions & Internal Screens RAMS
- Demountable Partition Installation
- Glass Partition and Internal Screen Installation
- Operable and Moveable Wall Installation
Piling & Substructure RAMS
- Bored and CFA Piling
- Dewatering and Groundwater Control
- Driven and Preformed Piling
- Retaining Structures and Ground Anchors
- Underpinning
Plant & Lifting RAMS
- Crane Lift Interface
- Excavator Operations — 360-Degree
- MEWP Operations
- Plant Delivery, Loading and Unloading
- Site Dumper Operations
- Small Plant and Power Tools
- Telehandler Operations
- Tower Crane Erection and Dismantling
- Work Near Overhead Power Lines
Plant & Lifting topic RAMS
- Ground Bearing Checks and Outrigger Mat Set-Up
- Lifting Accessory Pre-Use Inspection and Quarantine
- MEWP Emergency Lowering and Rescue
- Signalling for Lifts and Plant Movements
- Slinging, Rigging and Load Security
Plastering & Drylining RAMS
- Internal Rendering
- Metal Stud Partitions and Wall Linings
- Solid Plastering and Skimming
- Suspended Ceilings — MF and Grid
- Tape and Jointing
Point-of-work risk assessment
- Daily Pre-Task Briefing Record
- Dynamic Risk Assessment Card
- Last-Minute Risk Assessment Checklist
- Point-of-Work Risk Assessment (POWRA)
- Task Change and Stop-and-Reassess Record
Property Maintenance RAMS
- Gutter Clearing and Roofline Maintenance
- Minor Plumbing and Drainage Maintenance
- Planned Fabric Maintenance and Repairs
- Reactive Maintenance Call-Outs
- Void Property Works and Pre-Let Refurbishment
Radiation Shielding RAMS
- Lead-Lined Board and Lead Sheet Shielding Installation
- Works to Existing Shielded Rooms — Openings, Services and Reinstatement
Raised & Acoustic Floors RAMS
- Access and Raised Floor Installation
- Acoustic Floor and Isolation Systems
- Screeding — Sand Cement and Liquid
Render & External Finishes RAMS
- External Rendering — Hand Applied
- External Rendering — Machine Applied
- Mastic and Sealant Application
- Resin and Specialist Coatings to Floors
Rescue plans
- Confined Space Rescue Plan
- Crane Operator and Tower Crane Cab Rescue Plan
- Excavation and Trench Collapse Rescue Plan
- MEWP Rescue Plan
- Rescue Drill and Rehearsal Record
- Work at Height Rescue Plan — Harness and Fall Arrest
Roofing RAMS
- Flat Roofing — Built-Up Felt and Torch-On
- Flat Roofing — Single-Ply and Cold-Applied
- Gutters, Fascias and Rainwater Goods
- Metal Profile and Standing Seam Roofing
- Pitched Roofing — Tiling and Slating
- Roof Repairs and Inspections
- Rooflight Replacement and Fragile-Surface Work
Roofing topic RAMS
- Hot Bitumen Boilers and Pour-and-Roll Work
- Loading Out and Storing Materials on Roofs
- Noise from Roofing Tools and Plant
- Primers, Adhesives and Liquid Coatings on Roofs
- Weather Stop Rules for Roof Work
Safe systems of work
- Safe System of Work — Boarding a Loft
- Safe System of Work — Chasing Walls for Cables
- Safe System of Work — Core Drilling a Wall
- Safe System of Work — Erecting a Garden Fence
- Safe System of Work — Fitting Guttering from a Platform
- Safe System of Work — Fitting a Bathroom Suite
- Safe System of Work — Fitting a Boiler Flue
- Safe System of Work — Fitting a Kitchen
- Safe System of Work — Hanging a Door
- Safe System of Work — Installing Loft Insulation
- Safe System of Work — Installing a Consumer Unit
- Safe System of Work — Laying Laminate Flooring
- Safe System of Work — Laying a Patio
- Safe System of Work — Painting an Exterior at Low Level from a Tower
- Safe System of Work — Plastering a Room
- Safe System of Work — Pressure Washing a Facade at Ground Level
- Safe System of Work — Replacing a Light Fitting
- Safe System of Work — Replacing a Window
- Safe System of Work — Small Demolition of a Non-Load-Bearing Wall
- Safe System of Work — Tiling a Wet Room
Scaffolding & Access RAMS
- Edge Protection Installation
- Loading Bays and Gantries
- Mobile Tower Assembly and Use
- Safety Net Rigging, Inspection and Striking
- System Scaffold — Erection and Dismantle
- Temporary Roof Installation
- Tube and Fitting Scaffold — Erection, Alteration, Dismantle
Scaffolding & Access topic RAMS
- Cantilever, Truss-Out and Hung Scaffolds
- Loading Materials onto Scaffold Lifts
- Rescue of Casualties from Scaffolds
- Scaffold Alterations While in Use
- Scaffolding Work in High Winds, Storms and Ice
Shopfitting & Retail Fit-Out RAMS
- Counters, Fixtures and Racking Installation
- Interior Fit-Out Joinery and Wall Linings
- Retail Strip-Out Within a Trading Environment
- Shopfront and Entrance Screen Installation
- Signage and Branding Installation
Site Logistics & Cleaning RAMS
- Builders' Clean and Sparkle Clean
- Materials Distribution and Hoist Operations
- Plot Distribution by Telehandler — Housing
- Traffic Marshalling and Vehicle Movements
- Waste Management and Skip Exchanges
- Winter Working and Adverse Weather
Site Logistics & Cleaning topic RAMS
- Acid and Solvent Cleaning
- Clean-Down of Settled Dust
- Cleaning in Confined Spaces
- Forklift and Pallet Truck Operation
- Hazardous Waste Identification and Storage
Site forms
- Fit-to-Work and Emergency Contact Declaration
- Incident and Near-Miss Report
- Investigation and Corrective Action Record
- New Starter and Young or Vulnerable Person Check
- RAMS Review and Acceptance Form
Specialist Access & High Level RAMS
Structural Steel & Metalwork RAMS
- Balustrades, Handrails and Architectural Metalwork
- On-Site Welding and Hot Cutting of Steel
- Secondary Steelwork and Infill Members
- Staircase Installation
- Steel Frame Erection
Subcontractor management
Temporary Works RAMS
- Back-Propping and Formwork Support — Suspended Slabs
- Façade Retention and Structural Propping Schemes
- Propping and Needling for Structural Openings
Temporary works
Toolbox talks
- Toolbox Talk — Drugs and Alcohol — Not on This Site
- Toolbox Talk — Lone Working — Who Knows Where You Are
- Toolbox Talk — Mental Health — Look Out for Each Other
- Toolbox Talk — Near Misses — The Free Warnings
- Toolbox Talk — PPE — Last Line, Worn Right
- Toolbox Talk — Stress and Fatigue — Tired People Make the Mistakes
- Toolbox Talk — Young and New Workers — Look Out for Them
Water Hygiene RAMS
- Legionella Control Works — Outlet Flushing, TMV Servicing and Tank Cleaning
- Pre-Commission Flushing and Chlorination of Water Systems
Waterproofing & Tanking RAMS
- Below-Ground Waterproofing — Sheet and Liquid Membranes
- Internal Tanking and Cavity Drain Systems
- Podium, Balcony and Wet-Room Waterproofing