Provisions the documents cite: reg 2 (manual handling operations; load; self-employed), reg 4(1)(a) (avoid), reg 4(1)(b)(i)–(iii) (assess having regard to Schedule 1; reduce to the lowest level reasonably practicable; information on weight and heaviest side), reg 4(2) (review), reg 4(3) (individual factors), reg 5 (employees), Schedule 1 (factors and questions)
What it requires
reg 4(1)(a) — each employer, so far as reasonably practicable, avoids the need for employees to undertake manual handling operations at work that involve a risk of their being injured. Where that is not reasonably practicable, the employer (i) makes a suitable and sufficient assessment of all such operations, having regard to the factors in column 1 of Schedule 1 and considering the questions in column 2; (ii) takes appropriate steps to reduce the risk of injury to the lowest level reasonably practicable; and (iii) takes appropriate steps to give those employees general indications and, where reasonably practicable, precise information on the weight of each load and the heaviest side of any load whose centre of gravity is not positioned centrally (reg 4(1)(b)). The assessment is reviewed if there is reason to suspect it is no longer valid or there has been a significant change in the operations, and changed where needed (reg 4(2)). In deciding whether there is a risk and what steps to take, regard is had in particular to the employee's physical suitability; clothing, footwear or other personal effects; knowledge and training; the results of the risk assessment under reg 3 of the Management of Health and Safety at Work Regulations 1999; whether the employee is in a group identified as especially at risk; and the results of any health surveillance (reg 4(3)). Schedule 1 factors and questions: the tasks (holding or manipulating loads at a distance from the trunk; twisting, stooping or reaching upwards; excessive lifting or lowering or carrying distances; excessive pushing or pulling; risk of sudden movement of loads; frequent or prolonged physical effort; insufficient rest or recovery; a rate of work imposed by a process); the loads (heavy; bulky or unwieldy; difficult to grasp; unstable or with contents likely to shift; sharp, hot or otherwise potentially damaging); the working environment (space constraints preventing good posture; uneven, slippery or unstable floors; variations in level of floors or work surfaces; extremes of temperature or humidity; ventilation problems or gusts of wind; poor lighting); individual capability (unusual strength, height etc.; a hazard to those who might reasonably be considered pregnant or to have a health problem; special information or training needed); and other factors (movement or posture hindered by personal protective equipment or clothing). Employees make full and proper use of any system of work provided under reg 4(1)(b)(ii) (reg 5). Manual handling operations means any transporting or supporting of a load — including lifting, putting down, pushing, pulling, carrying or moving — by hand or bodily force, and a load includes a person or an animal; the employer's duties also apply to a relevant self-employed person in respect of themselves (reg 2). The Regulations set no numerical weight limits; the figures in HSE L23's risk filters are for deciding which tasks need a more detailed assessment.
The instrument itself: https://www.legislation.gov.uk/uksi/1992/2793. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: read in full at the primary source.
- Watched by: check for amendment, withdrawal or a new edition at each monthly horizon scan.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 183 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Arboriculture & Tree Work RAMS
- Chipping and Processing Arisings
- Climbing Operations and Sectional Dismantling
- Stump Grinding
- Tree Felling — Ground-Based
- Tree Work from MEWPs
Bricklaying & Masonry RAMS
- Alterations and Toothing into Existing Structures
- Blockwork and Brickwork — New Build
- Lintel and Padstone Installation
- Repointing and Brick Repairs
- Stone Masonry Fixing
Bricklaying & Masonry topic RAMS
Carpentry & Joinery RAMS
- Fire Door Installation and Remediation
- First-Fix Carpentry
- Kitchen and Fitted-Furniture Installation
- Second-Fix Joinery
- Timber Floor Laying and Sanding
- Trussed Rafter and Roof Structure Erection
Carpentry & Joinery topic RAMS
Cladding & Facades RAMS
- Curtain Walling
- Facade Cleaning and Spray-Applied Coatings
- Rainscreen and Panel Cladding Installation
- Remedial Cladding Replacement
- Render and External Wall Insulation Systems
Cladding & Facades topic RAMS
Concrete & Formwork RAMS
- Beam and Block and Precast Concrete Flooring
- Formwork Erection and Striking
- In-Situ Concrete Pours
- Power Floating and Surface Finishing
- Reinforcement Fixing
- Screeding
Concrete & Formwork topic RAMS
Concrete Cutting, Drilling & Repair RAMS
Damp, Timber & Preservation RAMS
Data Cabling & Telecoms RAMS
- Comms Room and Cabinet Build
- Containment and Cable Basket Installation
- External Ducts and Chamber Works
- Optical Fibre Works
- Structured Cabling Installation and Termination
Demolition & Strip-Out topic RAMS
Doors, Shutters & Openings RAMS
- Automatic Door Installation and Commissioning
- Blind, Louvre and Solar Shading Installation
- Industrial Door and Shutter Installation
Electrical topic RAMS
Electrical trade RAMS
External Works & Landscaping RAMS
- Car Park Surfacing and Line Marking
- Fencing and Hoarding Erection
- Soft Landscaping and Planting
- Street Furniture and Signage Installation
- Tree Works Interface
External Works & Landscaping topic RAMS
Fire Protection topic RAMS
Fitted Furniture & Equipment RAMS
- Commercial Kitchen Equipment Installation
- Kitchen and Bathroom Installation
- Storage, Shelving and Racking Installation
- Worktop Templating and Installation
Flooring & Tiling RAMS
- Carpet and Carpet Tiles
- Raised Access Floors
- Resin and Self-Levelling Floors
- Sheet Vinyl and Safety Flooring
- Wall and Floor Tiling
Flooring & Tiling topic RAMS
Glazing & Windows RAMS
- Emergency Glazing and Boarding
- Film Application and Manifestations
- Internal Glazed Partitions
- New Build Window and External Door Installation
- Structural and Overhead Glazing
- Window and Door Replacement
Glazing & Windows topic RAMS
Groundworks & Civils RAMS
- Compaction, Hardcore and Sub-Bases
- Drainage Installation and Connections
- Excavation and Trenching
- Foundations and Pile Caps
- Kerbing, Paving and Slabbing
- Reduced-Dig and Contaminated Ground
- Service Trenches and Ducting
Health and safety arrangements
Insulation RAMS
- Cold and Warm Roof Insulation
- External Wall Insulation
- Internal Wall Insulation
- Loft and Roof Void Insulation
- Thermal Insulation to Pipework and Ductwork
Kitchen & Bathroom Installation RAMS
- Bathroom Installation — Sanitaryware and Wet Areas
- Bathroom Strip-Out and Removal
- Kitchen Installation — Units, Worktops and Appliances
- Kitchen Strip-Out and Removal
- Worktop Templating and Stone Fitting
Lifts & Vertical Transport RAMS
- Construction Hoist Erection and Dismantling
- Passenger and Goods Lift Installation
- Platform and Home Lift Installation
Lightning Protection & Signage RAMS
- Lightning Protection Installation and Testing
- Sign Installation — Illuminated
- Sign Installation — Non-Illuminated
Mechanical, Plumbing & HVAC RAMS
- Air Source Heat Pump Installation
- Ductwork Installation
- Gas Pipework Interface
- Mechanical Commissioning and Balancing
- Mechanical Ventilation with Heat Recovery — Dwellings
- Pipework Installation — Heating and Domestic
- Plant and Equipment Installation — Plant Rooms
- Pressure Testing and Flushing
- Refrigerant Systems
- Sanitaryware and Fixtures Installation
- Soldered and Brazed Pipework
- Underfloor Heating Installation
Mechanical, Plumbing & HVAC topic RAMS
Modern Methods of Construction RAMS
- Light Steel Frame Erection
- Structural Insulated Panels and Cassettes
- Timber Frame Erection
- Volumetric and Modular Installation
Occupational health
Partitions & Internal Screens RAMS
- Demountable Partition Installation
- Glass Partition and Internal Screen Installation
- Operable and Moveable Wall Installation
Piling & Substructure RAMS
- Bored and CFA Piling
- Dewatering and Groundwater Control
- Driven and Preformed Piling
- Retaining Structures and Ground Anchors
- Underpinning
Plant & Lifting topic RAMS
Plastering & Drylining RAMS
- Internal Rendering
- Metal Stud Partitions and Wall Linings
- Solid Plastering and Skimming
- Suspended Ceilings — MF and Grid
- Tape and Jointing
Property Maintenance RAMS
- Gutter Clearing and Roofline Maintenance
- Minor Plumbing and Drainage Maintenance
- Planned Fabric Maintenance and Repairs
- Reactive Maintenance Call-Outs
- Void Property Works and Pre-Let Refurbishment
Radiation Shielding RAMS
- Lead-Lined Board and Lead Sheet Shielding Installation
- Works to Existing Shielded Rooms — Openings, Services and Reinstatement
Raised & Acoustic Floors RAMS
- Access and Raised Floor Installation
- Acoustic Floor and Isolation Systems
- Screeding — Sand Cement and Liquid
Render & External Finishes RAMS
- External Rendering — Hand Applied
- External Rendering — Machine Applied
- Mastic and Sealant Application
- Resin and Specialist Coatings to Floors
Roofing RAMS
- Flat Roofing — Built-Up Felt and Torch-On
- Flat Roofing — Single-Ply and Cold-Applied
- Gutters, Fascias and Rainwater Goods
- Metal Profile and Standing Seam Roofing
- Pitched Roofing — Tiling and Slating
- Roof Repairs and Inspections
- Rooflight Replacement and Fragile-Surface Work
Roofing topic RAMS
Safe systems of work
- Safe System of Work — Fitting a Bathroom Suite
- Safe System of Work — Fitting a Kitchen
- Safe System of Work — Hanging a Door
- Safe System of Work — Laying a Patio
Scaffolding & Access RAMS
- Edge Protection Installation
- Loading Bays and Gantries
- Mobile Tower Assembly and Use
- System Scaffold — Erection and Dismantle
- Temporary Roof Installation
- Tube and Fitting Scaffold — Erection, Alteration, Dismantle
Scaffolding & Access topic RAMS
Shopfitting & Retail Fit-Out RAMS
- Counters, Fixtures and Racking Installation
- Interior Fit-Out Joinery and Wall Linings
- Retail Strip-Out Within a Trading Environment
- Shopfront and Entrance Screen Installation
- Signage and Branding Installation
Site Logistics & Cleaning RAMS
- Builders' Clean and Sparkle Clean
- Materials Distribution and Hoist Operations
- Plot Distribution by Telehandler — Housing
- Traffic Marshalling and Vehicle Movements
- Waste Management and Skip Exchanges
- Winter Working and Adverse Weather