By trade · Mechanical, Plumbing & HVAC

47 documents · 5 document sets

Mechanical, Plumbing & HVAC.

47 documents for the trade: 12 RAMS, 21 quality inspection checklists, 7 permits to work, 2 site inspection records, 5 . Each opens to its own page with the first page shown in full.

Helmet colours vary from site to site. This is a common convention, not a legal standard.

The Mechanical, Plumbing & HVAC trade pack

£129the whole page — 47 documents, £503 bought one at a time · ex VAT, added at checkout

Every document in this pack is approved for issue by its author — a director of a UK principal contractor, forty years in the industry, SMSTS. None has been independently reviewed, and each says so. Every future revision is free. Why we don’t say “compliant”.

RAMS12

One document per activity rather than one per trade, so what you send describes the work you are actually doing.

£19 each all 220 RAMS for £399 See the bundle

Quality inspection checklists21

Walked and ticked on site, one sheet per area. Hold points where the work gets covered up; one named reviewer releases them; the client signs once at the end.

£7 each all 265 quality inspection checklists for £299 See the bundle

BMS Point-to-Point and Functional Testing — Quality Inspection Checklist preview KD-QA-BC-001

BMS Point-to-Point and Functional Testing

4 pages · 204 guided fields · £7
BMS Integration and Client Demonstration — Quality Inspection Checklist preview KD-QA-BC-002

BMS Integration and Client Demonstration

4 pages · 190 guided fields · £7
Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist preview KD-QA-CX-001

Commissioning Readiness — Power, Water and Systems Complete

4 pages · 194 guided fields · £7
Witness Test Record — Generic — Quality Inspection Checklist preview KD-QA-CX-002

Witness Test Record — Generic

4 pages · 188 guided fields · £7
Integrated Systems Test — Quality Inspection Checklist preview KD-QA-CX-003

Integrated Systems Test

4 pages · 199 guided fields · £7
Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist preview KD-QA-MG-001

Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01)

4 pages · 215 guided fields · £7
Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist preview KD-QA-MG-002

Radiation Shielding — Lead-Lined Boards and Doors

4 pages · 200 guided fields · £7
Clean Rooms and Pressure Regimes — Quality Inspection Checklist preview KD-QA-MG-003

Clean Rooms and Pressure Regimes

4 pages · 211 guided fields · £7
Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist preview KD-QA-MG-004

Nurse Call, Bed-Head Services and Pendants

4 pages · 190 guided fields · £7
Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist preview KD-QA-ME-001

Pipework First Fix — Routes, Supports, Sleeves and Identification

5 pages · 250 guided fields · £7
Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist preview KD-QA-ME-002

Pressure Testing — Water, Heating and Gas-Free Systems

4 pages · 200 guided fields · £7
Insulation, Vapour Seal and Identification — Quality Inspection Checklist preview KD-QA-ME-003

Insulation, Vapour Seal and Identification

4 pages · 203 guided fields · £7
Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist preview KD-QA-ME-004

Ductwork — Supports, Joints, Fire Dampers and Access

5 pages · 226 guided fields · £7
Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist preview KD-QA-ME-005

Ductwork Cleanliness and Leakage Testing

4 pages · 191 guided fields · £7
Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist preview KD-QA-ME-006

Plant Installation — Bases, Vibration Isolation and Connections

4 pages · 212 guided fields · £7
Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist preview KD-QA-ME-007

Underfloor Heating — Loops and Pressure Test

4 pages · 194 guided fields · £7
Sanitaryware and Second Fix — Quality Inspection Checklist preview KD-QA-ME-008

Sanitaryware and Second Fix

4 pages · 203 guided fields · £7
Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist preview KD-QA-ME-009

Water Hygiene — Flushing, Chlorination and L8 Records

4 pages · 195 guided fields · £7
Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist preview KD-QA-ME-010

Gas Installation — Tightness, Purge and Commissioning

4 pages · 193 guided fields · £7
Commissioning and Balancing — Witness — Quality Inspection Checklist preview KD-QA-ME-011

Commissioning and Balancing — Witness

4 pages · 211 guided fields · £7
Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist preview KD-QA-ME-012

Cold Rooms, Catering and Specialist Plant

4 pages · 191 guided fields · £7

Permits to work7

The permits this trade works under. Issued by whoever runs the site — if that is you, the full suite has the registers and appointments that go with them.

£9 each all 35 permits to work for £129 See the bundle

Site inspection records2

The registers this trade keeps or feeds. Fillable, dated, and yours to keep.

£10 each all 41 site inspection records for £69 See the bundle

Topic RAMS5

The registers this trade keeps or feeds. Fillable, dated, and yours to keep.

What these documents are built on.

Every instrument below is in the legislation register with the date it was checked. The documents print the clause they rely on.

Law

  • HSWA 1974 s.2(2)(a)
  • MHSWR 1999 regs 3 and 5
  • PUWER 1998
  • Manual Handling Operations Regulations 1992
  • Work at Height Regulations 2005
  • COSHH 2002
  • CDM 2015 regs 13 and 15
  • CIBSE Commissioning Codes (C automatic controls
  • M commissioning management)
  • Building Regulations 2010 (commissioning of fixed building services) and Approved Document L
  • CIBSE Commissioning Codes (M commissioning management
  • A air distribution
  • W water distribution
  • C automatic controls)
  • BSRIA BG 49/2015 — Commissioning Air Systems
  • BSRIA BG 2/2010 — Commissioning Water Systems
  • BSRIA BG 29/2021 — Pre-Commission Cleaning of Pipework Systems
  • IRR 2017 — Ionising Radiations Regulations 2017
  • Part 3:2019 test methods)
  • Water Regs 1999 — the Water Supply (Water Fittings) Regulations 1999
  • BESA DW/144 (2013) — specification for sheet metal ductwork
  • BESA DW/143 (2013) — practical guide to ductwork leakage testing
  • BESA DW/145 (2010) — installation of fire and smoke dampers
  • BESA TR/19 — internal cleanliness of ventilation systems
  • CIBSE Commissioning Codes
  • GSIUR 1998 — Gas Safety (Installation and Use) Regulations 1998
  • IGEM/UP/1 Edition 3 — strength testing, tightness testing and direct purging of industrial and commercial gas installations
  • IGEM/UP/2 — installation pipework on industrial and commercial premises
  • PSSR 2000 — Pressure Systems Safety Regulations 2000
  • F-Gas — Fluorinated Greenhouse Gases Regulations 2015
  • Building Regulations 2010 (commissioning of fixed building services) and Approved Document L (2021 edition), Approved Document F (2021 edition), Approved Document H
  • DSEAR 2002 reg 6(8) and Schedule 1 paragraph 6
  • PUWER 1998 reg 19
  • PUWER 1998 reg 4
  • GS4
  • Gas Safety (Installation and Use) Regulations 1998 regs 3 and 22
  • IGEM/UP/1 Edition 3
  • Regulatory Reform (Fire Safety) Order 2005 art 17
  • Confined Spaces Regulations 1997 reg 4(2)
  • Electricity at Work Regulations 1989 regs 4, 12 and 13
  • Manual Handling Operations Regulations 1992 reg 4
  • COSHH 2002 regs 6 and 7
  • Pressure Systems Safety Regulations 2000
  • Fluorinated Greenhouse Gases Regulations 2015
  • DSEAR 2002
  • Environmental Protection Act 1990 s.34
  • Hazardous Waste (England and Wales) Regulations 2005
  • Control of Vibration at Work Regulations 2005
  • HSE L140
  • RIDDOR 2013 reg 8
  • Control of Noise at Work Regulations 2005
  • CAR 2012
  • LOLER 1998
  • HSWA 1974 s.2(2)(a) and s.3
  • Water Supply (Water Fittings) Regulations 1999

Guidance and standards

  • BS 7671:2018+A4:2026
  • BS EN 12599:2012
  • BS 5839-1:2025
  • BS 7273-4:2015
  • BS 7346-8:2013
  • BS 5266-1:2016
  • HTM 02-01 (2006) — medical gas pipeline systems, Parts A and B
  • HTM 03-01 (2021) — specialised ventilation for healthcare premises, Parts A and B
  • HTM 08-03 (2013) — bedhead services
  • HTM 04-01 (2016) — safe water in healthcare premises
  • BS EN ISO 14644 (cleanrooms and associated controlled environments — Part 1:2015 classification
  • BS 1710:2014
  • BS 5970:2012
  • BS 8558:2015
  • BS EN 806-4:2010
  • BS EN 1264-4:2021
  • ACOP L8 (4th edition, 2013) — Legionnaires' disease. The control of legionella bacteria in water systems
  • HSG274 Part 2 (2014) — the control of legionella bacteria in hot and cold water systems
  • Joint Code of Practice, Fire Prevention on Construction Sites, 10th edition (2022) incorporating Amendment 2
  • HSG253
  • BS EN 12845:2015+A1:2019 clause 20
  • ACOP L101
  • BS 7671:2018+A4:2026 Part 6
  • EH40/2005
  • HSE HSG253
  • BS 8539:2012
  • ACOP L8 (4th edition, 2013) and HSE HSG274 Part 2

Other trades.

This trade's RAMS also have their own page: Mechanical and plumbing RAMS template.

All 48 trades By document type