HSE HSG168 — Fire safety in construction (3rd edition, 2022)

Provisions the documents cite: paras 118–132 (hot works; permit-to-work systems at 127–132)

What it requires

Design out hot works where possible; where unavoidable, manage under a formal PTW system (para 127). Para 129 lists what a hot-work permit should contain (location and nature of work, time and duration, permit validity limits, precautions before/during/after, alarm procedure, person in control, person authorising and closing). Fire-watch expectations: continuous watch for at least an hour after hot work ends plus a further check two hours after, and hot works complete two hours before end of the working day. Higher-risk buildings: hot works justified to the PD/PC and run under a strict PC-controlled PTW system.

The instrument itself: https://www.hse.gov.uk/pubns/books/hsg168.htm. The summary above is our plain-English reading, not the text of the instrument — always work from the source.

How this entry is kept current

  • Citation status: read in full at the primary source.
  • Watched by: page hash + edition check.
  • Source last checked by the automated scan: 2026-09-01.

Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.

The 24 documents that cite it

Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.

Cladding & Facades topic RAMS

Fire safety on site

Health and safety arrangements

Healthcare estates

Modern Methods of Construction RAMS

Roofing topic RAMS

Site forms

Site inspection records

Site notices and boards

Toolbox talks