Provisions the documents cite: reg 19; regs 4, 5, 6 and 9 (suitability, maintenance, inspection, training)
What it requires
Suitable means of isolation from all sources of energy, clearly identifiable and readily accessible, with measures so reconnection does not expose anyone to risk.
The instrument itself: https://www.legislation.gov.uk/uksi/1998/2306. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: cited from the primary source.
- Watched by: legislation.gov.uk Changes to Legislation tab.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 185 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Access and lifting inspection checklists
- Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist
- Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist
- Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist
- Scaffold Handover and Weekly Inspection — Quality Inspection Checklist
Arboriculture & Tree Work RAMS
- Chipping and Processing Arisings
- Climbing Operations and Sectional Dismantling
- Stump Grinding
- Tree Felling — Ground-Based
- Tree Work from MEWPs
Bricklaying & Masonry topic RAMS
Carpentry & Joinery RAMS
- Fire Door Installation and Remediation
- First-Fix Carpentry
- Kitchen and Fitted-Furniture Installation
- Second-Fix Joinery
- Timber Floor Laying and Sanding
- Trussed Rafter and Roof Structure Erection
Carpentry & Joinery topic RAMS
- Circular Saws — Guards, Blades and Kickback
- Kneeling and Overhead Fixing in Joinery
- Pneumatic and Powder-Actuated Fastening Tools
Cladding & Facades topic RAMS
Concrete & Formwork RAMS
- Beam and Block and Precast Concrete Flooring
- Formwork Erection and Striking
- In-Situ Concrete Pours
- Power Floating and Surface Finishing
- Reinforcement Fixing
- Screeding
Concrete & Formwork topic RAMS
Concrete Cutting, Drilling & Repair RAMS
Damp, Timber & Preservation RAMS
Doors, Shutters & Openings RAMS
- Automatic Door Installation and Commissioning
- Blind, Louvre and Solar Shading Installation
- Industrial Door and Shutter Installation
Electrical safety documents
Electrical topic RAMS
Extended permits
External Works & Landscaping RAMS
- Car Park Surfacing and Line Marking
- Fencing and Hoarding Erection
- Soft Landscaping and Planting
- Street Furniture and Signage Installation
- Tree Works Interface
External Works & Landscaping topic RAMS
- Compactor and Breaker Noise and Vibration
- Night Working and Lighting Towers
- Work Within Root Protection Areas
Fire Protection topic RAMS
Fitted Furniture & Equipment RAMS
- Commercial Kitchen Equipment Installation
- Kitchen and Bathroom Installation
- Storage, Shelving and Racking Installation
- Worktop Templating and Installation
Flooring & Tiling RAMS
- Carpet and Carpet Tiles
- Raised Access Floors
- Resin and Self-Levelling Floors
- Sheet Vinyl and Safety Flooring
- Wall and Floor Tiling
Flooring & Tiling topic RAMS
- Anti-Slip Treatment of Hard Floors
- Mixing Cementitious and Epoxy Adhesives and Grouts
- Substrate Moisture Testing and Surface DPMs
- Uplift of Old Floor Tiles and Bitumen Adhesive
Gas Installation RAMS
- Commercial Gas — Strength and Tightness Testing and Purging
- Gas Appliance Installation and Commissioning
- Gas Pipework Installation and Alteration
Glazing & Windows RAMS
- Emergency Glazing and Boarding
- Film Application and Manifestations
- Internal Glazed Partitions
- New Build Window and External Door Installation
- Structural and Overhead Glazing
- Window and Door Replacement
Groundworks & Civils topic RAMS
Health and safety arrangements
Lifting operations
Lifts & Vertical Transport RAMS
- Construction Hoist Erection and Dismantling
- Passenger and Goods Lift Installation
- Platform and Home Lift Installation
Lifts and vertical transport quality checklists
- Guide Alignment and Car Installation — Quality Inspection Checklist
- Hoists and Platform Lifts — Quality Inspection Checklist
- Lift Safety Tests and Handover Certification — Quality Inspection Checklist
- Lift Shaft and Pit Acceptance — Quality Inspection Checklist
Lightning Protection & Signage RAMS
- Lightning Protection Installation and Testing
- Sign Installation — Illuminated
- Sign Installation — Non-Illuminated
Mechanical, Plumbing & HVAC RAMS
- Air Source Heat Pump Installation
- Ductwork Installation
- Gas Pipework Interface
- Mechanical Commissioning and Balancing
- Mechanical Ventilation with Heat Recovery — Dwellings
- Pipework Installation — Heating and Domestic
- Plant and Equipment Installation — Plant Rooms
- Pressure Testing and Flushing
- Refrigerant Systems
- Sanitaryware and Fixtures Installation
- Soldered and Brazed Pipework
- Underfloor Heating Installation
Mechanical, Plumbing & HVAC topic RAMS
- Heavy Pipework Supports, Anchors and Bellows
- Pressure Vessel Isolation and Depressurisation
- Refrigerant Recovery, Evacuation and Charging
Medical Gas Pipeline Systems RAMS
- Medical Gas Pipeline Installation and Alteration
- Medical Gas Works in Occupied Clinical Areas — Interface and Isolation
Modern Methods of Construction RAMS
- Light Steel Frame Erection
- Structural Insulated Panels and Cassettes
- Timber Frame Erection
- Volumetric and Modular Installation
Partitions & Internal Screens RAMS
- Demountable Partition Installation
- Glass Partition and Internal Screen Installation
- Operable and Moveable Wall Installation
Piling & Substructure RAMS
- Bored and CFA Piling
- Dewatering and Groundwater Control
- Driven and Preformed Piling
- Retaining Structures and Ground Anchors
- Underpinning
Plant & Lifting RAMS
- Crane Lift Interface
- Excavator Operations — 360-Degree
- MEWP Operations
- Plant Delivery, Loading and Unloading
- Site Dumper Operations
- Small Plant and Power Tools
- Telehandler Operations
Plant & Lifting topic RAMS
- Lifting Accessory Pre-Use Inspection and Quarantine
- MEWP Emergency Lowering and Rescue
- Slinging, Rigging and Load Security
Plant daily checks
- 360° Excavator — Weekly Operator Check Sheet
- Compressor and Pneumatic Tools — Weekly Check Sheet
- Counterbalance Forklift — Weekly Operator Check Sheet
- Forward-Tipping Dumper — Weekly Operator Check Sheet
- Generator and Site Lighting Tower — Weekly Check Sheet
- Plant Defect Report and Quarantine Tag Record
- Plant Operator Authorisation and Competence Record
- Ride-On Roller — Weekly Operator Check Sheet
- Site Vehicles and Vans — Weekly Driver Check Sheet
- Telehandler — Weekly Operator Check Sheet
Plastering & Drylining RAMS
- Internal Rendering
- Metal Stud Partitions and Wall Linings
- Solid Plastering and Skimming
- Suspended Ceilings — MF and Grid
- Tape and Jointing
Raised & Acoustic Floors RAMS
- Access and Raised Floor Installation
- Acoustic Floor and Isolation Systems
- Screeding — Sand Cement and Liquid
Render & External Finishes RAMS
- External Rendering — Hand Applied
- External Rendering — Machine Applied
- Mastic and Sealant Application
- Resin and Specialist Coatings to Floors
Rescue plans
Safe systems of work
- Safe System of Work — Core Drilling a Wall
- Safe System of Work — Pressure Washing a Facade at Ground Level
Site Logistics & Cleaning RAMS
- Builders' Clean and Sparkle Clean
- Materials Distribution and Hoist Operations
- Plot Distribution by Telehandler — Housing
- Traffic Marshalling and Vehicle Movements
- Waste Management and Skip Exchanges
- Winter Working and Adverse Weather
Site Logistics & Cleaning topic RAMS
Site forms
Site inspection records
- Abrasive Wheel and Cartridge-Operated Tool Register
- Attachments and Forks Thorough-Examination Register
- Confined-Space Equipment Register
- Construction Hoist Daily Check and Weekly Inspection
- Gas Detector Bump-Test and Calibration Log
- MEWP Pre-Use Inspection and Familiarisation Record
- Plant Pre-Use Inspection Checklist
Specialist Access & High Level RAMS
Structural Steel & Metalwork RAMS
- Balustrades, Handrails and Architectural Metalwork
- On-Site Welding and Hot Cutting of Steel
- Secondary Steelwork and Infill Members
- Staircase Installation
- Steel Frame Erection
Temporary works quality checklists
- Permit to Strike or Dismantle — Quality Inspection Checklist
- Temporary Works Erected to Design — Quality Inspection Checklist
- Temporary Works In-Use Inspection — Quality Inspection Checklist
Toolbox talks
- Toolbox Talk — Abrasive Wheels — The Disc Is the Weak Point
- Toolbox Talk — Excavators — Stay Out of the Swing
- Toolbox Talk — Hand Tools and Blades — The Cut That Was Never Reported
- Toolbox Talk — Plant and Pedestrians — Seen or Squashed
- Toolbox Talk — Powder-Actuated Fixing Tools — It Is a Gun