Provisions the documents cite: hot works and fire watch provisions
What it requires
Continuous fire watch ≥60 minutes after hot work ceases, further checks for at least a further hour, longer for timber frame and high-rise; permits specific and never blanket/multi-day; signed off each work period.
How this entry is kept current
- Citation status: cited from the primary source.
- Watched by: manual check each scan; no feed exists.
- Automated scan: no public page to watch; checked by hand in the monthly review.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 21 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Cladding & Facades topic RAMS
Core permits
Fire safety on site
- Arson and Security Risk Checklist
- Construction Phase Fire Plan
- Hot Works Register
- Temporary Accommodation Fire Checklist
- Timber Frame and Combustible Structure Fire Control Sheet
Modern Methods of Construction RAMS
- Light Steel Frame Erection
- Structural Insulated Panels and Cassettes
- Timber Frame Erection
- Volumetric and Modular Installation
Roofing RAMS
- Flat Roofing — Built-Up Felt and Torch-On
- Flat Roofing — Single-Ply and Cold-Applied
- Gutters, Fascias and Rainwater Goods
- Metal Profile and Standing Seam Roofing
- Pitched Roofing — Tiling and Slating
- Roof Repairs and Inspections
- Rooflight Replacement and Fragile-Surface Work