Provisions the documents cite: arts 8–22 (general fire precautions, fire risk assessment, maintenance of fire-fighting equipment and escape routes)
What it requires
The responsible person for premises — on a construction site, the principal contractor for the site and the occupier where the building is occupied — takes general fire precautions, assesses fire risk and maintains fire-fighting equipment, detection and escape routes in efficient working order (art 17).
How this entry is kept current
- Citation status: carried from drafting; a source check is in the monthly scan queue.
- Watched by: legislation.gov.uk changes-to-legislation view each scan.
- Automated scan: no public page to watch; checked by hand in the monthly review.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 42 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Cladding & Facades topic RAMS
Close-out records
Doors and shutters quality checklists
- Fire Door Certification Labels and Door Register — Handover Evidence — Quality Inspection Checklist
- Fire Door Gaps, Seals and Thresholds — Door-by-Door Check — Quality Inspection Checklist
- Fire Door Ironmongery — Hinges, Closers, Locks, Hold-Open Devices and Intumescent Protection — Quality Inspection Checklist
Extended permits
Fire Protection topic RAMS
Fire safety on site
- Construction Phase Fire Plan
- Construction Phase Fire Risk Assessment
- Fire Marshal Appointment and Duties
- Fire Point and Escape Route Inspection Checklist
- Premises Fire Risk Assessment
Handover and completion
- Building User Guide
- Client Training and Demonstration Record
- End of Defects Period Inspection and Making-Good Certificate
- Fire and Life-Safety Systems Handover Certificate
- Handover Certificate — Keys, Fobs, Access Codes and Asset Schedule
- Outstanding Works Schedule at Practical Completion
- Practical Completion Inspection Checklist
Health and safety arrangements
Healthcare estates
Higher-risk buildings
Passive fire protection quality checklists
- Cavity Barriers and Fire-Stopping in Voids — Quality Inspection Checklist
- Compartment Line Walk Before Ceilings Close — Late Penetrations and Damage — Quality Inspection Checklist
- Fire Door Surveys and Remediation — Quality Inspection Checklist
- Fire-Rated Ductwork and Fire Dampers — Quality Inspection Checklist
- Intumescent and Board Fire Protection to Structural Steel — Quality Inspection Checklist
- Penetration Seals — Every Penetration Labelled and Photographed — Quality Inspection Checklist
- Service Risers and Shafts — Fire-Rated Floors, Walls and Riser Doors — Quality Inspection Checklist
Site forms
- Emergency Arrangements Board Sheet
- Fire Drill and Alarm Test Record
- Site Signing-In and Attendance Register
- Visitor Register and Briefing Acknowledgement