Provisions the documents cite: reg 7 (listed in manual §9 sources); regs 2 (incl. 2(3)), 3(2), 4(1) and (8) to (10), 5, 6, 8, 9(1) and (2), 10, 11, 18(1) and (2), 19(2) to (5), 20, 21, 22(1), (3), (4) and (8), 24
What it requires
Duty-holder's asbestos register must be checked before intrusive work.
The instrument itself: https://www.legislation.gov.uk/uksi/2012/632. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: cited from the primary source.
- Watched by: legislation.gov.uk Changes to Legislation tab.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 66 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Asbestos management
- Asbestos Management Plan
- Asbestos Register — Site Copy
- Asbestos Removal Handover and Reoccupation Record
- Asbestos Worker Exposure and Health Record Index
- Non-Licensed Asbestos Work Assessment and Notification Record
- Refurbishment and Demolition Survey Brief and Scope
Asbestos removal quality records
- Asbestos Enclosure and Smoke Test — Quality Inspection Checklist
- Four-Stage Clearance and Certificate of Reoccupation — Quality Inspection Checklist
- Non-Licensed Asbestos Removal and Waste — Quality Inspection Checklist
Asbestos — Non-Licensed Work RAMS
- Minor Works Disturbing Asbestos — Drilling, Fixing and Encapsulation
- Removal of Asbestos Cement Products
- Removal of Textured Coatings and Floor Tiles
COSHH substance assessments
Cladding & Facades topic RAMS
Company policies
Concrete Cutting, Drilling & Repair RAMS
Damp, Timber & Preservation RAMS
Demolition & Strip-Out RAMS
- Asbestos Interface — Stop-Work and Discovery
- Concrete Breaking, Bursting and Crushing
- Cutting and Removal of Structural Openings
- Hand Demolition and Hard Strip
- Soft Strip of Internal Finishes and Fittings
- Structural Demolition — Machine
- Temporary Works Interface During Demolition
Demolition & Strip-Out topic RAMS
Demolition and strip-out quality checklists
- Pre-Strip Survey and Services Isolation — Quality Inspection Checklist
- Salvage, Retained Items and Protection — Quality Inspection Checklist
- Strip-Out Complete — Area Handover — Quality Inspection Checklist
- Structural Protection and Propping in Place — Quality Inspection Checklist
Extended permits
External Works & Landscaping topic RAMS
Fire Protection topic RAMS
Flooring & Tiling topic RAMS
Glazing & Windows topic RAMS
- Glazing Sealants, Primers and Solvent Cleaners
- High-Rise Glazing Repairs by Rope Access
- Planned Removal of Broken Glass and Glass Waste
Groundworks & Civils topic RAMS
Health and safety arrangements
Insulation RAMS
- Cold and Warm Roof Insulation
- External Wall Insulation
- Internal Wall Insulation
- Loft and Roof Void Insulation
- Thermal Insulation to Pipework and Ductwork
Kitchen & Bathroom Installation RAMS
- Bathroom Installation — Sanitaryware and Wet Areas
- Bathroom Strip-Out and Removal
- Kitchen Installation — Units, Worktops and Appliances
- Kitchen Strip-Out and Removal
- Worktop Templating and Stone Fitting
Mechanical, Plumbing & HVAC topic RAMS
Occupational health
Painting & Decorating topic RAMS
Property Maintenance RAMS
- Gutter Clearing and Roofline Maintenance
- Minor Plumbing and Drainage Maintenance
- Planned Fabric Maintenance and Repairs
- Reactive Maintenance Call-Outs
- Void Property Works and Pre-Let Refurbishment