KubitDocs · Legislation

Approved Document E (Resistance to the passage of sound), 2003 edition incorporating later amendments — statutory guidance to the Building Regulations 2010

Provisions the documents cite: airborne and impact sound insulation performance for separating walls and floors and the pre-completion testing regime; cited by title only

What it requires

The statutory guidance separating walls and floors are built and tested to. The checklists cite it for the performance figures the specification adopts (recorded on the sheet) and for pre-completion sound testing.

How this entry is kept current

  • Citation status: carried from drafting; a source check is in the monthly scan queue.
  • Watched by: check for a new edition or amendment at each monthly horizon scan.
  • Automated scan: no public page to watch; checked by hand in the monthly review.

Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.

The 19 documents that cite it

Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.

Ceilings and access floors quality checklists

Close-out records

Inspection and test plans

Insulation and airtightness quality checklists

Partitions quality checklists

Plastering and drylining quality checklists