Packs · Trade packs · 23

47 documents · one purchase

Mechanical, Plumbing & HVAC

Every document on the Mechanical, Plumbing & HVAC trade page in one purchase — the RAMS, topic RAMS, quality checklists, permits and records the trade works under.

£129the pack + VAT

47 documents — £503 bought one at a time. Helmet colours vary from site to site. This is a common convention, not a legal standard.

Buy the pack

£12947 documents, £2.74 each — £503 bought one at a time · ex VAT, added at checkout

  • Pay once — no subscription, nothing renews
  • Yours to keep, with every future revision free
  • Re-download any time from your downloads
  • No sales calls — a person answers email within one working day

Every document in this pack is approved for issue by its author — a director of a UK principal contractor, forty years in the industry, SMSTS. None has been independently reviewed, and each says so. Every future revision is free, and every document can be completed online — fill it in your browser, download it finished. Why we don’t say “compliant”.

In this pack

47 documents, assembled for the trade.

Assembled, not written for the sector — every document below is a standard document from the library. What the sector changes is which ones you need and the overlay that goes with them.

Pipework Installation — Heating and Domestic preview KD-RAMS-ME-001

Pipework Installation — Heating and Domestic

3 pages · 138 guided fields£19
Soldered and Brazed Pipework preview KD-RAMS-ME-002

Soldered and Brazed Pipework

3 pages · 129 guided fields£19
Sanitaryware and Fixtures Installation preview KD-RAMS-ME-003

Sanitaryware and Fixtures Installation

3 pages · 126 guided fields£19
Ductwork Installation preview KD-RAMS-ME-004

Ductwork Installation

3 pages · 136 guided fields£19
Plant and Equipment Installation — Plant Rooms preview KD-RAMS-ME-005

Plant and Equipment Installation — Plant Rooms

3 pages · 127 guided fields£19
Pressure Testing and Flushing preview KD-RAMS-ME-006

Pressure Testing and Flushing

3 pages · 121 guided fields£19
Gas Pipework Interface preview KD-RAMS-ME-007

Gas Pipework Interface

3 pages · 122 guided fields£19
Refrigerant Systems preview KD-RAMS-ME-008

Refrigerant Systems

3 pages · 129 guided fields£19
Mechanical Commissioning and Balancing preview KD-RAMS-ME-009

Mechanical Commissioning and Balancing

3 pages · 127 guided fields£19
Mechanical Ventilation with Heat Recovery — Dwellings preview KD-RAMS-ME-010

Mechanical Ventilation with Heat Recovery — Dwellings

3 pages · 129 guided fields£19
Underfloor Heating Installation preview KD-RAMS-ME-011

Underfloor Heating Installation

3 pages · 133 guided fields£19
Air Source Heat Pump Installation preview KD-RAMS-ME-012

Air Source Heat Pump Installation

3 pages · 135 guided fields£19
BMS Point-to-Point and Functional Testing — Quality Inspection Checklist preview KD-QA-BC-001

BMS Point-to-Point and Functional Testing — Quality Inspection Checklist

4 pages · 204 guided fields£7
BMS Integration and Client Demonstration — Quality Inspection Checklist preview KD-QA-BC-002

BMS Integration and Client Demonstration — Quality Inspection Checklist

4 pages · 190 guided fields£7
Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist preview KD-QA-CX-001

Commissioning Readiness — Power, Water and Systems Complete — Quality Inspection Checklist

4 pages · 194 guided fields£7
Witness Test Record — Generic — Quality Inspection Checklist preview KD-QA-CX-002

Witness Test Record — Generic — Quality Inspection Checklist

4 pages · 188 guided fields£7
Integrated Systems Test — Quality Inspection Checklist preview KD-QA-CX-003

Integrated Systems Test — Quality Inspection Checklist

4 pages · 199 guided fields£7
Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist preview KD-QA-MG-001

Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist

4 pages · 215 guided fields£7
Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist preview KD-QA-MG-002

Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist

4 pages · 200 guided fields£7
Clean Rooms and Pressure Regimes — Quality Inspection Checklist preview KD-QA-MG-003

Clean Rooms and Pressure Regimes — Quality Inspection Checklist

4 pages · 211 guided fields£7
Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist preview KD-QA-MG-004

Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist

4 pages · 190 guided fields£7
Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist preview KD-QA-ME-001

Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist

5 pages · 250 guided fields£7
Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist preview KD-QA-ME-002

Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist

4 pages · 200 guided fields£7
Insulation, Vapour Seal and Identification — Quality Inspection Checklist preview KD-QA-ME-003

Insulation, Vapour Seal and Identification — Quality Inspection Checklist

4 pages · 203 guided fields£7
Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist preview KD-QA-ME-004

Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist

5 pages · 226 guided fields£7
Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist preview KD-QA-ME-005

Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist

4 pages · 191 guided fields£7
Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist preview KD-QA-ME-006

Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist

4 pages · 212 guided fields£7
Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist preview KD-QA-ME-007

Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist

4 pages · 194 guided fields£7
Sanitaryware and Second Fix — Quality Inspection Checklist preview KD-QA-ME-008

Sanitaryware and Second Fix — Quality Inspection Checklist

4 pages · 203 guided fields£7
Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist preview KD-QA-ME-009

Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist

4 pages · 195 guided fields£7
Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist preview KD-QA-ME-010

Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist

4 pages · 193 guided fields£7
Commissioning and Balancing — Witness — Quality Inspection Checklist preview KD-QA-ME-011

Commissioning and Balancing — Witness — Quality Inspection Checklist

4 pages · 211 guided fields£7
Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist preview KD-QA-ME-012

Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist

4 pages · 191 guided fields£7
Hot Works Permit preview KD-PTW-HW-001

Hot Works Permit

3 pages · 83 guided fields£9
Mechanical Isolation and Lock-Off Certificate preview KD-PTW-MI-029

Mechanical Isolation and Lock-Off Certificate

3 pages · 124 guided fields£9
Pressure Test Permit preview KD-PTW-PT-025

Pressure Test Permit

3 pages · 78 guided fields£9
Gas Purge and Commissioning Permit preview KD-PTW-GP-026

Gas Purge and Commissioning Permit

3 pages · 73 guided fields£9
Sprinkler and Suppression Impairment Permit preview KD-PTW-SI-024

Sprinkler and Suppression Impairment Permit

3 pages · 75 guided fields£9
Confined Space Entry Permit preview KD-PTW-CS-004

Confined Space Entry Permit

4 pages · 82 guided fields£9
Permit to Energise preview KD-PTW-EN-027

Permit to Energise

3 pages · 70 guided fields£9
Manual Handling Assessment Checklist preview KD-INS-MH-016

Manual Handling Assessment Checklist

1 page · 42 guided fields£10
COSHH Register and Assessment Checklist preview KD-INS-CO-017

COSHH Register and Assessment Checklist

2 pages · 124 guided fields£10
Pressure Vessel Isolation and Depressurisation preview KD-RA-MP-001

Pressure Vessel Isolation and Depressurisation

3 pages · 142 guided fields£9
Refrigerant Recovery, Evacuation and Charging preview KD-RA-MP-002

Refrigerant Recovery, Evacuation and Charging

4 pages · 147 guided fields£9
Hand-Arm Vibration — Drilling and Cutting preview KD-RA-MP-003

Hand-Arm Vibration — Drilling and Cutting

3 pages · 146 guided fields£9
Heavy Pipework Supports, Anchors and Bellows preview KD-RA-MP-004

Heavy Pipework Supports, Anchors and Bellows

4 pages · 146 guided fields£9
Legionella Control from First Fill to Handover preview KD-RA-MP-005

Legionella Control from First Fill to Handover

3 pages · 139 guided fields£9

How it works

Four steps, in this order.

  1. 1

    Choose

    A single document, a bundle for one hazard, or a pack for your trade or sector. Pay once.

  2. 2

    Enter your site once

    Site, reference, address, client, principal contractor. Every document in the pack opens with them filled in.

  3. 3

    Add your logo

    Upload it once. It prints at the top of every page of every document you download.

  4. 4

    Download it finished

    Filled, flattened, licensed to your business. When the law moves, the revision is free.

What a pack is and is not

A pack is a shortlist, not a decision.

This is the set of documents a main contractor commonly asks this trade for. It is a description of what tends to be requested — not a determination of what your job requires. Your work may need fewer of these, or more, or something not on the list at all.

That judgement belongs to a competent person in your business who knows the site. Nothing here makes anyone compliant, and no template can.