Packs · Trade packs · 29

24 documents · one purchase

Plant & Lifting

Every document on the Plant & Lifting trade page in one purchase — the RAMS, topic RAMS, quality checklists, permits and records the trade works under.

£79the pack + VAT

24 documents — £301 bought one at a time. Helmet colours vary from site to site. This is a common convention, not a legal standard.

Buy the pack

£7924 documents, £3.29 each — £301 bought one at a time · ex VAT, added at checkout

  • Pay once — no subscription, nothing renews
  • Yours to keep, with every future revision free
  • Re-download any time from your downloads
  • No sales calls — a person answers email within one working day

Every document in this pack is approved for issue by its author — a director of a UK principal contractor, forty years in the industry, SMSTS. None has been independently reviewed, and each says so. Every future revision is free, and every document can be completed online — fill it in your browser, download it finished. Why we don’t say “compliant”.

In this pack

24 documents, assembled for the trade.

Assembled, not written for the sector — every document below is a standard document from the library. What the sector changes is which ones you need and the overlay that goes with them.

Telehandler Operations preview KD-RAMS-PL-001

Telehandler Operations

3 pages · 121 guided fields£19
MEWP Operations preview KD-RAMS-PL-002

MEWP Operations

3 pages · 123 guided fields£19
Crane Lift Interface preview KD-RAMS-PL-003

Crane Lift Interface

3 pages · 112 guided fields£19
Plant Delivery, Loading and Unloading preview KD-RAMS-PL-004

Plant Delivery, Loading and Unloading

3 pages · 116 guided fields£19
Small Plant and Power Tools preview KD-RAMS-PL-005

Small Plant and Power Tools

3 pages · 127 guided fields£19
Work Near Overhead Power Lines preview KD-RAMS-PL-006

Work Near Overhead Power Lines

4 pages · 145 guided fields£19
Tower Crane Erection and Dismantling preview KD-RAMS-PL-007

Tower Crane Erection and Dismantling

4 pages · 150 guided fields£19
Site Dumper Operations preview KD-RAMS-PL-008

Site Dumper Operations

4 pages · 148 guided fields£19
Excavator Operations — 360-Degree preview KD-RAMS-PL-009

Excavator Operations — 360-Degree

4 pages · 155 guided fields£19
Scaffold Handover and Weekly Inspection — Quality Inspection Checklist preview KD-QA-SA-001

Scaffold Handover and Weekly Inspection — Quality Inspection Checklist

4 pages · 185 guided fields£7
Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist preview KD-QA-SA-002

Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist

4 pages · 184 guided fields£7
Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist preview KD-QA-SA-003

Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist

4 pages · 185 guided fields£7
Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist preview KD-QA-SA-004

Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist

4 pages · 186 guided fields£7
Lifting Operations Permit preview KD-PTW-LO-008

Lifting Operations Permit

3 pages · 78 guided fields£9
Work Near Overhead Power Lines Permit preview KD-PTW-OH-031

Work Near Overhead Power Lines Permit

3 pages · 71 guided fields£9
Permit to Load and Strike — Temporary Works preview KD-PTW-TL-022

Permit to Load and Strike — Temporary Works

3 pages · 91 guided fields£9
Lifting Equipment and Accessories Register preview KD-INS-LE-003

Lifting Equipment and Accessories Register

2 pages · 134 guided fields£10
Plant Pre-Use Inspection Checklist preview KD-INS-PL-004

Plant Pre-Use Inspection Checklist

2 pages · 112 guided fields£10
Hand-Arm Vibration Exposure Record preview KD-INS-HV-014

Hand-Arm Vibration Exposure Record

1 page · 99 guided fields£10
Slinging, Rigging and Load Security preview KD-RA-PL-001

Slinging, Rigging and Load Security

3 pages · 140 guided fields£9
Signalling for Lifts and Plant Movements preview KD-RA-PL-002

Signalling for Lifts and Plant Movements

4 pages · 145 guided fields£9
Ground Bearing Checks and Outrigger Mat Set-Up preview KD-RA-PL-003

Ground Bearing Checks and Outrigger Mat Set-Up

3 pages · 139 guided fields£9
MEWP Emergency Lowering and Rescue preview KD-RA-PL-004

MEWP Emergency Lowering and Rescue

3 pages · 141 guided fields£9
Lifting Accessory Pre-Use Inspection and Quarantine preview KD-RA-PL-005

Lifting Accessory Pre-Use Inspection and Quarantine

3 pages · 140 guided fields£9

How it works

Four steps, in this order.

  1. 1

    Choose

    A single document, a bundle for one hazard, or a pack for your trade or sector. Pay once.

  2. 2

    Enter your site once

    Site, reference, address, client, principal contractor. Every document in the pack opens with them filled in.

  3. 3

    Add your logo

    Upload it once. It prints at the top of every page of every document you download.

  4. 4

    Download it finished

    Filled, flattened, licensed to your business. When the law moves, the revision is free.

What a pack is and is not

A pack is a shortlist, not a decision.

This is the set of documents a main contractor commonly asks this trade for. It is a description of what tends to be requested — not a determination of what your job requires. Your work may need fewer of these, or more, or something not on the list at all.

That judgement belongs to a competent person in your business who knows the site. Nothing here makes anyone compliant, and no template can.