Templates

On sale · 6 documents · £9 each

Site traffic management plan template

CDM 2015 regulation 27 requires every construction site to be organised so that pedestrians and vehicles can move safely, so far as is reasonably practicable, and regulation 28 controls how vehicles move. On a small site that is a plan on two or three pages, a delivery booking sheet, an appointed banksman, a gate notice for drivers, and a sheet for the reversing the site cannot design out. The weekly inspection against the plan is on sale already.

£9each + VAT

6 documents, one price each. Helmet colours vary from site to site. This is a common convention, not a legal standard.

Written for this

6 documents — the plan the traffic inspection checks against.

The public interface plan covers schools, shops and occupied buildings, where the site meets the people who did not choose to be near it.

What comes with every document

The same six things come with a single document or the whole library.

Fill it your way

Guided PDFs with a tooltip on every field, or complete it online. Type your site once and every document in the pack opens with it filled in.

Your logo on every page

Upload it once. It prints at the top of every page of every document you download, included with any purchase.

The law, cited

Each document shows the regulation it rests on. Check our working.

Yours to keep

No subscription, no login, no expiry. Revisions included.

Written from the approving side

By a contractor who reviews subcontractor submissions, and sends them back.

Kept current, free

Every source is re-checked monthly. A change that matters raises a revision, and you get it free.

How it works

Four steps, in this order.

  1. 1

    Choose

    A single document, a bundle for one hazard, or a pack for your trade or sector. Pay once.

  2. 2

    Enter your site once

    Site, reference, address, client, principal contractor. Every document in the pack opens with them filled in.

  3. 3

    Add your logo

    Upload it once. It prints at the top of every page of every document you download.

  4. 4

    Download it finished

    Filled, flattened, licensed to your business. When the law moves, the revision is free.

Legal basis

What these documents are built on.

Printed on the forms themselves, so you and whoever reviews your submission are reading the same references. Law and guidance are kept apart, because they are not the same thing.

Statutory provisions

  • CDM 2015 regs 27 and 28
  • CDM 2015 reg 13
  • LOLER 1998 reg 8
  • CDM 2015 reg 8
  • Health and Safety (Safety Signs and Signals) Regulations 1996 Sch 1 Part IX
  • CDM 2015 reg 12(2)
  • CDM 2015 reg 8(6)
  • HSWA 1974 s.3
  • CDM 2015 reg 13(4)(b)
  • CDM 2015 reg 18(2)
  • CDM 2015 reg 27
  • Control of Pollution Act 1974 ss.60 and 61
  • PUWER 1998 reg 28(e) and f

Guidance and standards relied on — not law

  • HSG144 2nd edition, 2009
  • HSG151 2nd edition, 2009

HSE guidance, British Standards and industry codes are not statute and carry no force in themselves — they are the standard the document is built to. And citing an instrument is not the same as satisfying it: what discharges the duty is a competent person in your business assessing this job and completing the document properly.

Our one rule

We will not tell you this makes you compliant.

No template can. HSE says it of its own examples: “Do not just copy an example and put your company name to it as that would not satisfy the law and would not protect your employees.” SSIP assessors want risk assessments written for a specific project within the last twelve months, and a generic document with your logo on it is unlikely to pass, whoever sold it to you.

What you are buying is the structure and the prompts — every section the law and HSE guidance expect the document to address, with the reference beside it. The judgement stays yours.

Why we don’t say “compliant”

Before you buy

Will the main contractor accept it?

No template can promise that, and we won’t. It is written from the approving side of the desk, but your competent person adapts it to the job and signs it off. That step is what makes it yours.

Is VAT included in the price?

No. Prices are ex VAT; VAT is added at checkout.

What format is it?

A fillable PDF with a tooltip on every field. Or complete it online: type your site once and it downloads finished, with your logo on every page.

What happens when the law changes?

Every source is re-checked monthly. A change that matters raises a revision, and you get it free.

Is it a subscription?

No. Pay once. No subscription, no login, no expiry.