Templates

On sale · 20 documents · £9 each

Safe system of work templates

A sole trader or a small firm gets asked for "a method statement" for a job that does not need a three-page RAMS: fitting a kitchen, laying a patio, replacing a window, chasing walls. A safe system of work on one page — the hazards with the control beside each, the sequence, the kit, the stop rules and the signature — answers the question without pretending to be more. Where the job is bigger or the site is a managed one, the activity RAMS is the document, and the sheet says so.

£9each + VAT

20 documents, one price each. Helmet colours vary from site to site. This is a common convention, not a legal standard.

Written for this

20 one-page safe systems of work — the jobs a small firm gets asked for a method statement on.

Each sheet names the instrument that governs the task and the RAMS, permit or assessment it sits beside; the hazards are the ones on that job and the controls are actions.

Safe System of Work — Replacing a Light Fitting preview KD-SSW-LF-001

Safe System of Work — Replacing a Light Fitting

2 pages · 42 guided fields£9
Safe System of Work — Fitting a Kitchen preview KD-SSW-KF-002

Safe System of Work — Fitting a Kitchen

2 pages · 42 guided fields£9
Safe System of Work — Laying Laminate Flooring preview KD-SSW-LL-003

Safe System of Work — Laying Laminate Flooring

2 pages · 42 guided fields£9
Safe System of Work — Plastering a Room preview KD-SSW-PR-004

Safe System of Work — Plastering a Room

2 pages · 42 guided fields£9
Safe System of Work — Fitting a Bathroom Suite preview KD-SSW-BS-005

Safe System of Work — Fitting a Bathroom Suite

2 pages · 43 guided fields£9
Safe System of Work — Replacing a Window preview KD-SSW-WR-006

Safe System of Work — Replacing a Window

2 pages · 42 guided fields£9
Safe System of Work — Installing a Consumer Unit preview KD-SSW-CU-007

Safe System of Work — Installing a Consumer Unit

2 pages · 45 guided fields£9
Safe System of Work — Hanging a Door preview KD-SSW-HD-008

Safe System of Work — Hanging a Door

2 pages · 42 guided fields£9
Safe System of Work — Tiling a Wet Room preview KD-SSW-TW-009

Safe System of Work — Tiling a Wet Room

2 pages · 42 guided fields£9
Safe System of Work — Painting an Exterior at Low Level from a Tower preview KD-SSW-PT-010

Safe System of Work — Painting an Exterior at Low Level from a Tower

2 pages · 43 guided fields£9
Safe System of Work — Fitting Guttering from a Platform preview KD-SSW-GU-011

Safe System of Work — Fitting Guttering from a Platform

2 pages · 42 guided fields£9
Safe System of Work — Installing Loft Insulation preview KD-SSW-LI-012

Safe System of Work — Installing Loft Insulation

2 pages · 42 guided fields£9
Safe System of Work — Laying a Patio preview KD-SSW-PA-013

Safe System of Work — Laying a Patio

2 pages · 42 guided fields£9
Safe System of Work — Erecting a Garden Fence preview KD-SSW-GF-014

Safe System of Work — Erecting a Garden Fence

2 pages · 42 guided fields£9
Safe System of Work — Boarding a Loft preview KD-SSW-BL-015

Safe System of Work — Boarding a Loft

2 pages · 42 guided fields£9
Safe System of Work — Fitting a Boiler Flue preview KD-SSW-BF-016

Safe System of Work — Fitting a Boiler Flue

2 pages · 43 guided fields£9
Safe System of Work — Chasing Walls for Cables preview KD-SSW-CW-017

Safe System of Work — Chasing Walls for Cables

2 pages · 42 guided fields£9
Safe System of Work — Core Drilling a Wall preview KD-SSW-CD-018

Safe System of Work — Core Drilling a Wall

2 pages · 42 guided fields£9
Safe System of Work — Pressure Washing a Facade at Ground Level preview KD-SSW-PW-019

Safe System of Work — Pressure Washing a Facade at Ground Level

2 pages · 42 guided fields£9
Safe System of Work — Small Demolition of a Non-Load-Bearing Wall preview KD-SSW-DW-020

Safe System of Work — Small Demolition of a Non-Load-Bearing Wall

2 pages · 43 guided fields£9

What comes with every document

The same six things come with a single document or the whole library.

Fill it your way

Guided PDFs with a tooltip on every field, or complete it online. Type your site once and every document in the pack opens with it filled in.

Your logo on every page

Upload it once. It prints at the top of every page of every document you download, included with any purchase.

The law, cited

Each document shows the regulation it rests on. Check our working.

Yours to keep

No subscription, no login, no expiry. Revisions included.

Written from the approving side

By a contractor who reviews subcontractor submissions, and sends them back.

Kept current, free

Every source is re-checked monthly. A change that matters raises a revision, and you get it free.

How it works

Four steps, in this order.

  1. 1

    Choose

    A single document, a bundle for one hazard, or a pack for your trade or sector. Pay once.

  2. 2

    Enter your site once

    Site, reference, address, client, principal contractor. Every document in the pack opens with them filled in.

  3. 3

    Add your logo

    Upload it once. It prints at the top of every page of every document you download.

  4. 4

    Download it finished

    Filled, flattened, licensed to your business. When the law moves, the revision is free.

Legal basis

What these documents are built on.

Printed on the forms themselves, so you and whoever reviews your submission are reading the same references. Law and guidance are kept apart, because they are not the same thing.

Statutory provisions

  • MHSWR 1999 reg 3
  • Electricity at Work Regulations 1989 regs 13, 14 and 16
  • Manual Handling Operations Regulations 1992 reg 4
  • Gas Safety (Installation and Use) Regulations 1998 reg 3
  • COSHH 2002 reg 7
  • COSHH 2002 regs 6 and 7
  • Electricity at Work Regulations 1989 reg 13
  • Work at Height Regulations 2005 regs 4 and 6
  • Electricity at Work Regulations 1989 regs 12, 13, 14 and 16
  • Work at Height Regulations 2005 regs 4, 6 and 8
  • Work at Height Regulations 2005 regs 4, 6 and 7
  • Work at Height Regulations 2005 reg 9
  • Gas Safety (Installation and Use) Regulations 1998 regs 3, 26(9) and 27
  • PUWER 1998 regs 4 and 9
  • PUWER 1998 regs 4 and 8
  • CDM 2015 reg 20

Guidance and standards relied on — not law

  • HSG47 (3rd edition, 2014) as guidance

HSE guidance, British Standards and industry codes are not statute and carry no force in themselves — they are the standard the document is built to. And citing an instrument is not the same as satisfying it: what discharges the duty is a competent person in your business assessing this job and completing the document properly.

Our one rule

We will not tell you this makes you compliant.

No template can. HSE says it of its own examples: “Do not just copy an example and put your company name to it as that would not satisfy the law and would not protect your employees.” SSIP assessors want risk assessments written for a specific project within the last twelve months, and a generic document with your logo on it is unlikely to pass, whoever sold it to you.

What you are buying is the structure and the prompts — every section the law and HSE guidance expect the document to address, with the reference beside it. The judgement stays yours.

Why we don’t say “compliant”

Before you buy

Will the main contractor accept it?

No template can promise that, and we won’t. It is written from the approving side of the desk, but your competent person adapts it to the job and signs it off. That step is what makes it yours.

Is VAT included in the price?

No. Prices are ex VAT; VAT is added at checkout.

What format is it?

A fillable PDF with a tooltip on every field. Or complete it online: type your site once and it downloads finished, with your logo on every page.

What happens when the law changes?

Every source is re-checked monthly. A change that matters raises a revision, and you get it free.

Is it a subscription?

No. Pay once. No subscription, no login, no expiry.