KubitDocs · Legislation

ENA Engineering Recommendations G98 and G99 — requirements for the connection of generation equipment in parallel with public distribution networks

Provisions the documents cite: notification, application and commissioning confirmation for connected generation

What it requires

The distribution-network procedures a PV or other generation connection must go through.

How this entry is kept current

  • Citation status: carried from drafting; a source check is in the monthly scan queue.
  • Watched by: manual check each scan.
  • Automated scan: no public page to watch; checked by hand in the monthly review.

Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.

The 11 documents that cite it

Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.

Electrical quality checklists

Handover and completion